网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

When taking soundings on a ship,coating the tape with chalk helps to ______.

A.Better identify the correct reading

B.Show the depth of any water in an oil tank

C.Make the tape roll easier

D.Reduce possibility of sparks


参考答案

更多 “ When taking soundings on a ship,coating the tape with chalk helps to ______.A.Better identify the correct readingB.Show the depth of any water in an oil tankC.Make the tape roll easierD.Reduce possibility of sparks ” 相关考题
考题 ______, where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.A.Voyage repairsB.Routine dockingC.Damage repairsD.Conversion

考题 If anything abnormal be found on the load change of main engine when the ship is entering in shallow waterway, before taking measures the engineer on duty should _______.A.stop main engine immediatelyB.ask the captain and the chief engineer's permission for stopping the engineC.inquire the bridge for the situation initiativelyD.stop engine and inform bridge

考题 Which of the following is a benefit of the IBM Long Term File System (LTFS)? () A. management of the library filesB. management of the encryption keys and archivesC. helps to reduce tape, file management and archive costsD. helps to control the write speed matching on LTO-4 drives

考题 Logbooks are used to record the events occurring when ______.A.the ship is in a harborB.the ship is at anchorageC.the ship is underwayD.all of the above

考题 ______ covers the period from the time when the goods are loaded on to the time they are discharged from the ship.A.Carriage of goodsB.Taking cargo on boardC.Care for cargoD.Taking delivery of

考题 Bilge soundings indicate ______.A.the amount of condensation in the holdB.whether the cargo is leaking or notC.whether the vessel is taking on waterD.All of the above

考题 When do sailors make the ship fast? ()A、When a ship is unmooring.B、After a ship is in position alongside a wharf.C、Before a ship is loading.D、A and C

考题 A ship’s bottom is given a coating of ()which contains poison.A、varnishB、anti-fouling paintC、boottopping paintD、primer

考题 Much time is spent ()(保养) the ship at sea.A、watchingB、maintainingC、look outingD、taking after

考题 The pilot is taking my ship() the harbour now.A、intoB、atC、onD、for

考题 当船舶停靠码头时,为了保证船货安全,有必要24小时值班。()A、When a vessel is alongside the wharf, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.B、When a vessel is alongside the wharf, t’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.C、When a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.D、When a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.

考题 We’ve just () our ship with one new coating.A、washedB、paintedC、cleanedD、repaired

考题 Which of the following is a benefit of the IBM Long Term File System (LTFS)? ()A、management of the library filesB、management of the encryption keys and archivesC、helps to reduce tape, file management and archive costsD、helps to control the write speed matching on LTO-4 drives

考题 A system is being planned with three production partitions, one each for an IBM i, AIX standard edition, and Power Linux applications. One fibre-channel attached TS3100 tape library will be shared between the partitions for backup. Which solution provides tape library sharing with minimum operator intervention?()A、Configure VIO Server Express Edition to control the tape library through one fibre channel card.Assign the library to the production partitions when needed.B、Configure the IBM i partition to own the tape library.Use IBM i virtualization to host a virtual tape libraryconnection to the AIX and Linux partition.Assign the library to the production partitions when needed.C、Configure a fibre channel card for each partition, and a configure fibre switch.Connect the partitions and tape library to the switch.Zone the switch so all partitions can enable the tape when needed and disable the tape when finished.D、Configure AIX to control the tape library through one fibre channel adapter.Use AIX virtualization to host a virtual tape library connection to the IBM i and Linux partitions.Assign the library to the production partitions when needed.

考题 单选题A ship’s bottom is given a coating of ()which contains poison.A varnishB anti-fouling paintC boottopping paintD primer

考题 单选题Bilge soundings indicate().A the amount of condensation in the holdB whether the cargo is leaking or notC whether the vessel is taking on waterD All of the above

考题 单选题You are tuning RMAN to optimize performance. You want tape I/O to be asynchronous when you perform tape backups. Which action should you take?()A  Set the BACKUP_TAPE_IO_SLAVES parameter to FALSEB  Set the BACKUP_TAPE_IO_SLAVES parameter to TRUEC  Use compression when performing tape backupsD  Configure multiple SBT channels

考题 单选题Logbooks are used to record the events occurring when().A the ship is in a harborB the ship is at anchorageC the ship is underwayD All of the above

考题 单选题When taking soundings on a floating ship,the tape should be lowered and brought back quickly to().A reduce the time the sounding tube is openB avoid creating a sparkC lessen the effect of roll or pitch on the readingD lessen the effect of heave on the reading

考题 单选题If anything abnormal be found on the load change of main engine when the ship is entering in shallow waterway, before taking measuring the engineer on duty should ()A stop main engine immediatelyB ask the captain and the chief engineer’s permission for stopping the engineC initiatively inquire the bridge for the situationD stop engine and inform bridge

考题 单选题When taking a Pilot from a pilot vessel in a seaway,which way should you head your vessel if the ladder is on the leeward side().A Bow to the sea and no way on your vesselB Sea on the lee quarter with ship moving ahead slowlyC Sea on the weather bow and ship moving ahead slowlyD Sea on the quarter with sternway on the ship

考题 单选题I don’t know().A when will our ship sailB will when our ship sailC when our ship will sailD will our ship when sail

考题 单选题(),where the ship is docked for hull coating renewal, and for any other required underwater work to be carried out, when the opportunity is taken to make other repairs.A Voyage repairsB Routine dockingC Damage repairsD Conversion

考题 单选题You are tuning RMAN to optimize performance. You want tape I/O to be asynchronous when you perform tape backups.Which action should you take?()A Set the BACKUP_TAPE_IO_SLAVES parameter to FALSEB Set the BACKUP_TAPE_IO_SLAVES parameter to TRUEC Use compression when performing tape backupsD Configure multiple SBT channels

考题 单选题When does a pilot say make all lines fast ? He says it when().A the ship is very close to the pierB the ship is about to be in positionC the ship is in positionD the ship is getting alongside the pier

考题 单选题When checking a mooring line,you should().A ensure the bight is not fouled between the ship and the dock by taking up slackB pay out slack smartly and keep free for runningC secure more turns to hold the line against any strain,then clear the areaD surge the line so that it maintains a strain without parting

考题 单选题The pilot is taking my ship() the harbour now.A intoB atC onD for