网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
To allow for the rise or fall in tide and for change in draft of a tanker during cargo transfer,cargo hoses must be suspended with ______.
A.Slings or saddles placed at 25-foot(8 meter)intervals
B.Enough slack in their bight
C.Topping lifts and runners tied off to winches
D.All of the above
参考答案
更多 “ To allow for the rise or fall in tide and for change in draft of a tanker during cargo transfer,cargo hoses must be suspended with ______.A.Slings or saddles placed at 25-foot(8 meter)intervalsB.Enough slack in their bightC.Topping lifts and runners tied off to winchesD.All of the above ” 相关考题
考题
The period at high or low tide during which there is no change in the height of the water is called the ______.A.range of the tideB.plane of the tideC.stand of the tideD.reversing of the tide
考题
A rapid rise or fall of the barometer indicates ______.A.heavy rain within six hoursB.a decrease in wind velocityC.a change in the present weather conditionsD.that fog will soon set in
考题
From ______ the mariner can know the data of tide.A.the Sea PilotB.the Cargo PlanC.the Tide TableD.the Port List
考题
When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to ______.A.remove an existing list that would slow down cargo operationsB.initiate loading in conjunction with unloading at the hatchC.improve stability during cargo operationsD.allow longshoremen easy access to the hatch
考题
During the voyage the ship encountered ______ winds and weather,during which time she labored heavily and to such extent that at times it was necessary to change courses and reduce speeds in order to ease her and prevent damage to herself and her cargo.A.largeB.bigC.boisterousD.high
考题
If an electric cargo winch is being used to lift a draft of cargo and the engine room loses all power,which will occur ________.A.A pawl,forced by a spring mechanism,will engage the teeth of the bull gear and hold the loadB.An electromagnetic brake will hold the load where it is suspendedC.The load will fall rapidly to the deck unless the foot brake is engagedD.The load will slowly lower to the deck under control of the drag of the winch motor
考题
It would be possible that part of the cargo got ______ as great change in the weather during the voyage caused heavy ______ in the hold.A.damp / waterB.dampness / sweaterC.wet / condensationD.wetness / dew
考题
Of the four possible tune movements, high fall is used for statements and wh-questions; high rise is used for questions asking for repetition of something; low rise is for yes/no questions, etc. and fall rise is for corrections and polite contradictions.()A对B错
考题
Pay more attention to () .A、the ride and fall of the tideB、ride with fall of the tideC、riding and falling of the tideD、riding with falling of the tide
考题
Of the four possible tune movements, high fall is used for statements and wh-questions; high rise is used for questions asking for repetition of something; low rise is for yes/no questions, etc. and fall rise is for corrections and polite contradictions.()
考题
他们应该注意装卸货情况。()A、They should pay attention to the safety of the ship.B、They should pay attention to the rise and fall of tide.C、They should pay attention to the conditions of loading and unloading.D、They should pay attention to take care of the mooring lines.
考题
单选题In some parts of the world there is often a slight fall in tide during the middle of the high water period. The effect is to create a longer period of stand at higher water. This special feature is called a(n)().A
apogean tideB
double high waterC
perigean tideD
bore
考题
单选题From () the mariner can know the data of tide.A
the Sea PilotB
the Cargo PlanC
the Tide TableD
the Port List
考题
单选题Which of the following operations aboard a tanker must be recorded in the Oil Record Book ()A
Any internal transfer of oil cargo during a voyageB
The discharge overboard in port or at sea of any bilge water accumulated in machinery spacesC
The loading or unloading of any or all oil cargoD
All of the above
考题
单选题The Master of a cargo or tanker shall be responsible that each lifeboat,except those free-fall launched,is lowered to the water with crew and maneuvered at least once every().A
weekB
monthC
three monthsD
year
考题
单选题It would be possible that part of the cargo got()as great change in the weather during the voyage caused heavy()in the hold.A
damp/waterB
dampness/sweaterC
wet/condensationD
wetness/dew
考题
单选题Pay more attention to () .A
the ride and fall of the tideB
ride with fall of the tideC
riding and falling of the tideD
riding with falling of the tide
考题
单选题Stand of the tide is that time when().A
the vertical rise or fall of the tide has stoppedB
slack water occursC
tidal current is at a maximumD
the actual depth of the water equals the charted depth
考题
单选题When you keep a gangway watch, you should ()the mooring lines according to the rise and fall of the tide.A
adjustedB
adjustingC
adjustsD
adjust
考题
单选题A rapid rise or fall of the barometer indicates().A
heavy rain within six hoursB
a decrease in wind velocityC
a change in the present weather conditionsD
that fog will soon set in
考题
单选题A tide is called diurnal when().A
only one high and one low water occur during a lunar dayB
the high tide is higher and the low tide is lower than usualC
the high tide and low tide are exactly six hours apartD
two high tides occur during a lunar day
考题
单选题他们应该注意装卸货情况。()A
They should pay attention to the safety of the ship.B
They should pay attention to the rise and fall of tide.C
They should pay attention to the conditions of loading and unloading.D
They should pay attention to take care of the mooring lines.
考题
单选题Which of the following is not the duty of the sailor on gangway watch? ()A
Noticing rise and fall of the tide.B
Adjusting the mooring line.C
Discharging cargoes.D
Receive visitors
考题
单选题The period at high or low tide during which there is no change in the height of the water is called the ().A
range of the tideB
plane of the tideC
stand of the tideD
reversing of the tide
热门标签
最新试卷