网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

To allow for the rise or fall in tide and for change in draft of a tanker during cargo transfer,cargo hoses must be suspended with ______.

A.Slings or saddles placed at 25-foot(8 meter)intervals

B.Enough slack in their bight

C.Topping lifts and runners tied off to winches

D.All of the above


参考答案

更多 “ To allow for the rise or fall in tide and for change in draft of a tanker during cargo transfer,cargo hoses must be suspended with ______.A.Slings or saddles placed at 25-foot(8 meter)intervalsB.Enough slack in their bightC.Topping lifts and runners tied off to winchesD.All of the above ” 相关考题
考题 The period at high or low tide during which there is no change in the height of the water is called the ______.A.range of the tideB.plane of the tideC.stand of the tideD.reversing of the tide

考题 A rapid rise or fall of the barometer indicates ______.A.heavy rain within six hoursB.a decrease in wind velocityC.a change in the present weather conditionsD.that fog will soon set in

考题 From ______ the mariner can know the data of tide.A.the Sea PilotB.the Cargo PlanC.the Tide TableD.the Port List

考题 When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to ______.A.remove an existing list that would slow down cargo operationsB.initiate loading in conjunction with unloading at the hatchC.improve stability during cargo operationsD.allow longshoremen easy access to the hatch

考题 During the voyage the ship encountered ______ winds and weather,during which time she labored heavily and to such extent that at times it was necessary to change courses and reduce speeds in order to ease her and prevent damage to herself and her cargo.A.largeB.bigC.boisterousD.high

考题 If an electric cargo winch is being used to lift a draft of cargo and the engine room loses all power,which will occur ________.A.A pawl,forced by a spring mechanism,will engage the teeth of the bull gear and hold the loadB.An electromagnetic brake will hold the load where it is suspendedC.The load will fall rapidly to the deck unless the foot brake is engagedD.The load will slowly lower to the deck under control of the drag of the winch motor

考题 It would be possible that part of the cargo got ______ as great change in the weather during the voyage caused heavy ______ in the hold.A.damp / waterB.dampness / sweaterC.wet / condensationD.wetness / dew

考题 Of the four possible tune movements, high fall is used for statements and wh-questions; high rise is used for questions asking for repetition of something; low rise is for yes/no questions, etc. and fall rise is for corrections and polite contradictions.()A对B错

考题 Pay more attention to () .A、the ride and fall of the tideB、ride with fall of the tideC、riding and falling of the tideD、riding with falling of the tide

考题 Of the four possible tune movements, high fall is used for statements and wh-questions; high rise is used for questions asking for repetition of something; low rise is for yes/no questions, etc. and fall rise is for corrections and polite contradictions.()

考题 他们应该注意装卸货情况。()A、They should pay attention to the safety of the ship.B、They should pay attention to the rise and fall of tide.C、They should pay attention to the conditions of loading and unloading.D、They should pay attention to take care of the mooring lines.

考题 ()the rise and fall of the tide.A、NoticeB、NoteC、AttentionD、Look out

考题 单选题In some parts of the world there is often a slight fall in tide during the middle of the high water period. The effect is to create a longer period of stand at higher water. This special feature is called a(n)().A apogean tideB double high waterC perigean tideD bore

考题 单选题The() type of cargo ship is the tanker.A largeB modernC largerD largest

考题 单选题From () the mariner can know the data of tide.A the Sea PilotB the Cargo PlanC the Tide TableD the Port List

考题 单选题Which of the following operations aboard a tanker must be recorded in the Oil Record Book ()A Any internal transfer of oil cargo during a voyageB The discharge overboard in port or at sea of any bilge water accumulated in machinery spacesC The loading or unloading of any or all oil cargoD All of the above

考题 单选题The Master of a cargo or tanker shall be responsible that each lifeboat,except those free-fall launched,is lowered to the water with crew and maneuvered at least once every().A weekB monthC three monthsD year

考题 单选题It would be possible that part of the cargo got()as great change in the weather during the voyage caused heavy()in the hold.A damp/waterB dampness/sweaterC wet/condensationD wetness/dew

考题 单选题()(注意) the rise and fall of the tide.A NoticeB NoteC AttentionD Look out

考题 单选题Pay more attention to () .A the ride and fall of the tideB ride with fall of the tideC riding and falling of the tideD riding with falling of the tide

考题 单选题Stand of the tide is that time when().A the vertical rise or fall of the tide has stoppedB slack water occursC tidal current is at a maximumD the actual depth of the water equals the charted depth

考题 单选题When you keep a gangway watch, you should ()the mooring lines according to the rise and fall of the tide.A adjustedB adjustingC adjustsD adjust

考题 单选题A rapid rise or fall of the barometer indicates().A heavy rain within six hoursB a decrease in wind velocityC a change in the present weather conditionsD that fog will soon set in

考题 单选题A tide is called diurnal when().A only one high and one low water occur during a lunar dayB the high tide is higher and the low tide is lower than usualC the high tide and low tide are exactly six hours apartD two high tides occur during a lunar day

考题 单选题他们应该注意装卸货情况。()A They should pay attention to the safety of the ship.B They should pay attention to the rise and fall of tide.C They should pay attention to the conditions of loading and unloading.D They should pay attention to take care of the mooring lines.

考题 单选题Which of the following is not the duty of the sailor on gangway watch? ()A Noticing rise and fall of the tide.B Adjusting the mooring line.C Discharging cargoes.D Receive visitors

考题 单选题The period at high or low tide during which there is no change in the height of the water is called the ().A range of the tideB plane of the tideC stand of the tideD reversing of the tide