Prior to any overhaul work on electric equipment, it is important to ensure the circuits are ___ .
A.live
B.dead
C.excited
D.on line
参考答案
更多 “ Prior to any overhaul work on electric equipment, it is important to ensure the circuits are ___ .A.liveB.deadC.excitedD.on line ” 相关考题
考题
The Internet has changed the way people work.They can __1__ from place to place while getting in touch __2__ their office all the time via the Internet.A recent __3__ in the America magazine, Newsweek, said more than 89 million Americana now use the Internet at work.One can __4__ imagine how business could be done without the Internet.The Internet is becoming more __4__ than any one had thought possible.And its importance is __5__ to increase more in the future.1).A.travelB.withC.reportD.expectedE.important2).A.travelB.withC.reportD.expectedE.important3).A.travelB.withC.reportD.expectedE.important4).A.travelB.withC.reportD.expectedE.important5).A.travelB.withC.reportD.expectedE.important
考题
Cleaners and farmers do ______scientists do.A. the same work asB. less important work thanC. more work thanD. as important work as
考题
SONET Path Terminating Equipment (PTE) requires which three line codes to be supported for DS1 and DS3 circuits?() (Choose three.)
A.AMIB.ESFC.DUSD.SSME.B3ZSF.B8ZS
考题
After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or______.A.within 4 days after the seaman's dischargeB.prior to the vessel's departure on the next voyageC.prior to loading any out-bound cargoD.prior to any change of Master
考题
That REMOVE ANY LIST ON THE V/L AFTER EACH WATCH END means that ______.A.any list,no matter where it is posted,shall be removed prior to ending his watch by the OOWB.the vessel should not be removedC.any and all lists on board the vessel should be taken offD.the inclination of the vessel should be corrected prior to ending his watch by the OOW
考题
The majority researcher tend to use the methods which are______or consistent with their prior work.
A.feasible
B.probable
C.possible
D.capable
考题
Routine inspections are conducted at the Haldren Paper Factory to ensure that all equipment is functioning ____.
A.properly
B.rightfully
C.literally
D.officially
考题
Which of the following is MOST important for an administrator to investigate prior to making a change on a server?()A、Manufacturer’s specificationsB、Organizational impactC、Vendor listsD、Compatibility requirements
考题
SONET Path Terminating Equipment (PTE) requires which three line codes to be supported for DS1 and DS3 circuits?() (Choose three.)A、AMIB、ESFC、DUSD、SSME、B3ZSF、B8ZS
考题
单选题Prior to a ship’s departure from any port () should be tested with deck officer to ensure satisfactory operation.A
fire fighting pumpB
the steering gearC
life boat engineD
the main engine
考题
多选题SONET Path Terminating Equipment (PTE) requires which three line codes to be supported for DS1 and DS3 circuits?() (Choose three.)AAMIBESFCDUSDSSMEB3ZSFB8ZS
考题
单选题Prior to running the hydraulic pump, examine the system carefully and ensure that the lever of control valves is in () position.A
neutralB
endC
openingD
closure
考题
单选题In addition to their simple beauty, what makes the adobe dwellings admirable is their________ to air-condition a house without using electric equipment.A
absorptionB
abilityC
abolitionD
adaptation
考题
单选题What is meant by the term overhaul in firefighting?()A
Slow down the spread of fire by cooling adjacent structuresB
Cover the fire with foamC
Smother the fire with a blanket or similar objectD
Break up solid objects to ensure that any deep seated fires are extinguished
考题
单选题Which of the following statements represents the FIRST precaution to be taken prior to working on any installed electrical component ()A
Wear rubber gloves and bootsB
Use only approved non-conducting toolsC
Ground the case of the machine before beginning any repairsD
Open the supply circuits and tag the switches
考题
单选题Before any work on electrical or electronic equipment is performed, which of the following precautions should be carried out ()A
De-energize the applicable switchboard busB
Bypass the interlocksC
Secure and tag the supply circuit breaker in the open positionD
Station a man at the circuit supply switch
考题
单选题Any electric motor can be constructed to be().A
short proofB
ground proofC
explosion proofD
overload proof
考题
单选题Inductance is the property of an electric circuit that ()A
opposes any change in the applied voltageB
opposes any change in the current flow through the circuitC
aids any changes in the applied voltageD
aids any changes in the current through the circuit
考题
单选题The best tool to use for removing the carbon ridge at the top of an enginecylinder, prior to removing the piston, is to use()A
an electric grinderB
a metal scraperC
a reamerD
a three-wing hone
考题
多选题Which of the following environmental factors are MOST important to monitor in order to protectcomputer equipment?()ATemperatureBIntensity of lightingCBarometric pressureDHumidity levelEElevation
考题
单选题Which of the listed pre-start procedures should be carried out prior to starting a crosshead type diesel engine after an overhaul?()A
Pre-lube cylinders with hand cranksB
Open all air space drain cocksC
Open all indicator valvesD
All of the above
考题
单选题Electric circuits are protected against overloads and short circuits by means of a/an ().A
circuit breakerB
amplifierC
diodeD
capacitor
考题
单选题Prior to any overhaul work on electric equipment, it is important to ensure the circuits are ().A
liveB
deadC
excitedD
on line
考题
单选题Prior to lowering the lifeboat,the most important item to check is the().A
oarsB
sailC
boat plugD
life preservers
考题
多选题Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()Aelapsed time since the target start date or completion date of previous work generated by PMBdifference between completion date of previous work and system date is equal to Lead TimeCelapsed time since the target start date or completion date of the latest work orders for the assetDmetered equipment usage since the target start date or completion date of previous work generated by PMEmetered equipment usage since the target start date or completion date of the latest work order for the asset
考题
单选题The master shall ensure that any seafarers()are provided with an adequate period of rest.A
who have performed work for 14 hoursB
who have performed work in a scheduled rest periodC
who have performed work in a scheduled work periodD
who works hard
考题
单选题The responsibilities of the engineer officer in charge of the watch do not include ()A
to ensure the main propulsion plant are kept under constant surveillanceB
to ensure the auxiliary systems are kept under constant surveillanceC
to inspect the steering gear spaces at suitable intervalsD
to inspect and overhaul the equipments in his charge