网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

Prior to any overhaul work on electric equipment, it is important to ensure the circuits are ___ .

A.live

B.dead

C.excited

D.on line


参考答案

更多 “ Prior to any overhaul work on electric equipment, it is important to ensure the circuits are ___ .A.liveB.deadC.excitedD.on line ” 相关考题
考题 The Internet has changed the way people work.They can __1__ from place to place while getting in touch __2__ their office all the time via the Internet.A recent __3__ in the America magazine, Newsweek, said more than 89 million Americana now use the Internet at work.One can __4__ imagine how business could be done without the Internet.The Internet is becoming more __4__ than any one had thought possible.And its importance is __5__ to increase more in the future.1).A.travelB.withC.reportD.expectedE.important2).A.travelB.withC.reportD.expectedE.important3).A.travelB.withC.reportD.expectedE.important4).A.travelB.withC.reportD.expectedE.important5).A.travelB.withC.reportD.expectedE.important

考题 Cleaners and farmers do ______scientists do.A. the same work asB. less important work thanC. more work thanD. as important work as

考题 I believe team work() important. A、wasB、areC、is

考题 SONET Path Terminating Equipment (PTE) requires which three line codes to be supported for DS1 and DS3 circuits?() (Choose three.) A.AMIB.ESFC.DUSD.SSME.B3ZSF.B8ZS

考题 After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or______.A.within 4 days after the seaman's dischargeB.prior to the vessel's departure on the next voyageC.prior to loading any out-bound cargoD.prior to any change of Master

考题 That REMOVE ANY LIST ON THE V/L AFTER EACH WATCH END means that ______.A.any list,no matter where it is posted,shall be removed prior to ending his watch by the OOWB.the vessel should not be removedC.any and all lists on board the vessel should be taken offD.the inclination of the vessel should be corrected prior to ending his watch by the OOW

考题 The majority researcher tend to use the methods which are______or consistent with their prior work. A.feasible B.probable C.possible D.capable

考题 Routine inspections are conducted at the Haldren Paper Factory to ensure that all equipment is functioning ____. A.properly B.rightfully C.literally D.officially

考题 Which of the following is MOST important for an administrator to investigate prior to making a change on a server?()A、Manufacturer’s specificationsB、Organizational impactC、Vendor listsD、Compatibility requirements

考题 SONET Path Terminating Equipment (PTE) requires which three line codes to be supported for DS1 and DS3 circuits?() (Choose three.)A、AMIB、ESFC、DUSD、SSME、B3ZSF、B8ZS

考题 单选题Prior to a ship’s departure from any port () should be tested with deck officer to ensure satisfactory operation.A fire fighting pumpB the steering gearC life boat engineD the main engine

考题 多选题SONET Path Terminating Equipment (PTE) requires which three line codes to be supported for DS1 and DS3 circuits?() (Choose three.)AAMIBESFCDUSDSSMEB3ZSFB8ZS

考题 单选题Prior to running the hydraulic pump, examine the system carefully and ensure that the lever of control valves is in () position.A neutralB endC openingD closure

考题 单选题In addition to their simple beauty, what makes the adobe dwellings admirable is their________ to air-condition a house without using electric equipment.A absorptionB abilityC abolitionD adaptation

考题 单选题What is meant by the term overhaul in firefighting?()A Slow down the spread of fire by cooling adjacent structuresB Cover the fire with foamC Smother the fire with a blanket or similar objectD Break up solid objects to ensure that any deep seated fires are extinguished

考题 单选题Which of the following statements represents the FIRST precaution to be taken prior to working on any installed electrical component ()A Wear rubber gloves and bootsB Use only approved non-conducting toolsC Ground the case of the machine before beginning any repairsD Open the supply circuits and tag the switches

考题 单选题Before any work on electrical or electronic equipment is performed, which of the following precautions should be carried out ()A De-energize the applicable switchboard busB Bypass the interlocksC Secure and tag the supply circuit breaker in the open positionD Station a man at the circuit supply switch

考题 单选题Any electric motor can be constructed to be().A short proofB ground proofC explosion proofD overload proof

考题 单选题Inductance is the property of an electric circuit that ()A opposes any change in the applied voltageB opposes any change in the current flow through the circuitC aids any changes in the applied voltageD aids any changes in the current through the circuit

考题 单选题The best tool to use for removing the carbon ridge at the top of an enginecylinder, prior to removing the piston, is to use()A an electric grinderB a metal scraperC a reamerD a three-wing hone

考题 多选题Which of the following environmental factors are MOST important to monitor in order to protectcomputer equipment?()ATemperatureBIntensity of lightingCBarometric pressureDHumidity levelEElevation

考题 单选题Which of the listed pre-start procedures should be carried out prior to starting a crosshead type diesel engine after an overhaul?()A Pre-lube cylinders with hand cranksB Open all air space drain cocksC Open all indicator valvesD All of the above

考题 单选题Electric circuits are protected against overloads and short circuits by means of a/an ().A circuit breakerB amplifierC diodeD capacitor

考题 单选题Prior to any overhaul work on electric equipment, it is important to ensure the circuits are ().A liveB deadC excitedD on line

考题 单选题Prior to lowering the lifeboat,the most important item to check is the().A oarsB sailC boat plugD life preservers

考题 多选题Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()Aelapsed time since the target start date or completion date of previous work generated by PMBdifference between completion date of previous work and system date is equal to Lead TimeCelapsed time since the target start date or completion date of the latest work orders for the assetDmetered equipment usage since the target start date or completion date of previous work generated by PMEmetered equipment usage since the target start date or completion date of the latest work order for the asset

考题 单选题The master shall ensure that any seafarers()are provided with an adequate period of rest.A who have performed work for 14 hoursB who have performed work in a scheduled rest periodC who have performed work in a scheduled work periodD who works hard

考题 单选题The responsibilities of the engineer officer in charge of the watch do not include ()A to ensure the main propulsion plant are kept under constant surveillanceB to ensure the auxiliary systems are kept under constant surveillanceC to inspect the steering gear spaces at suitable intervalsD to inspect and overhaul the equipments in his charge