考题
The tentative cargo plan ________ .A.eliminates confusion with the final stowage planB.shows the approximate amount of cargo to be loaded in each holdC.expedites the total operationD.requires an unproportional number of gang hours of work to discharge the cargo
考题
After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or______.A.within 4 days after the seaman's dischargeB.prior to the vessel's departure on the next voyageC.prior to loading any out-bound cargoD.prior to any change of Master
考题
The cargo must be loaded within the time stipulated by the charter-party,otherwise the Charterer will have to pay ______.A.despatchB.demurrageC.detentionD.damage
考题
A fire has damaged 20 bales of cotton on a freighter loaded with general cargo. This claim would come under ______.A.constructive total lossB.general averageC.particular averageD.total loss of a part
考题
______ covers the period from the time when the goods are loaded on to the time they are discharged from the ship.A.Carriage of goodsB.Taking cargo on boardC.Care for cargoD.Taking delivery of
考题
The vessel shall be employed in such lawful trades between safe ports and places within Northern America as the ______ or their agents shall direct.A.CharterersB.Cargo ownersC.OwnersD.The merchants
考题
That THE CARGO SHALL BE LOADED AND DISCHARGED WITHIN THE NUMBER OF TOTAL RUNNING HOURS AS INDICATED,WEATHER PERMITTING,SUNDAYS AND HOLIDAYS EXCEPTED,UNLESS USED,IN WHICH EVENT TIME ACTUALLY USED SHALL COUNT is referred to as ______.A.separate laytime for loading and dischargingB.total laytime for loading and dischargingC.commencement of laytimeD.laytime commencement of loading and discharging
考题
Liquid bulk cargo is loaded and discharged by pumps.()A、液体散货是由泵装卸的B、干散货是由吊杆装卸的C、液体散货是由吊杆装卸的D、干散货是由泵装卸的
考题
Which three of these are important when determining NAS Server scaling? ()A、interface bandwidthB、rescan timer intervalC、total number of network devicesD、number of new user authentications per secondE、which operating system is loaded on the clientF、number of checks performed in a posture assessment.
考题
The()(非包装货) is loaded and discharged by belt conveyer.A、non-packed cargoB、packed cargoC、cased cargoD、inboard cargo
考题
Which three of these are important when determining NAS Server scaling? ()A、 interface bandwidthB、 rescan timer intervalC、 total number of network devicesD、 number of new user authentications per secondE、 which operating system is loaded on the clientF、 number of checks performed in a posture assessment
考题
单选题Once a vessel has loaded packaged hazardous cargo,the cargo spaces shall be inspected. The spaces shall also be inspected at least once in every 24 hours. The only exception to daily inspection is when().A
a vessel is equipped with an automatic smoke or fire detecting systemB
the cargo hatches are of steel constructionC
the cargo is of a nonflammable typeD
there is sufficient fire protection located on the main deck adjacent to the cargo hatch
考题
单选题The cargo must be loaded within the time stipulated by the charter-party,otherwise the Charterer will have to pay().A
despatchB
demurrageC
detentionD
damage
考题
单选题集装箱是由龙门吊装卸。()A
Containers are loaded and discharged by gantry cranes.B
Cases are loaded and discharged by gantry cranes.C
Cases are loaded and discharged by heavy derricks.D
Containers are loaded and discharged by heavy derricks.
考题
单选题A ship is responsible for the cargo loaded or unloaded().A
only when the cargo is within its railB
after the cargo is checked by tallymenC
as soon as the cargo loading or unloading beginsD
during the time when loading or unloading is going on
考题
单选题A fire has damaged 20 bales of cotton on a freighter loaded with general cargo. This claim would come under().A
constructive total lossB
general averageC
particular averageD
total loss of a part
考题
单选题液体散货用泵装卸的。()A
Liquid cargo is loaded and discharged by pumps.B
Liquid cargo is loaded and discharged by tubes.C
Liquid bulk cargo is loaded and discharged by tubes.D
Liquid bulk cargo is loaded and discharged by pumps.
考题
单选题Crude oil washing of cargo tanks has the following advantages except for ()A
reducing the erosion of the cargo tanksB
increasing the total quantity of oil to carryC
reducing the quantity of water contained in oilD
reducing cargo discharged time
考题
单选题The tentative cargo plan().A
eliminates confusion with the final stowage planB
shows the approximate amount of cargo to be loaded in each holdC
expedites the total operationD
requires an unproportional number of gang hours of work to discharge the cargo
考题
单选题According to regulations,access to a cargo pumproom in a tanker carrying grades C or D liquid cargo shall be().A
from areas equipped with power ventilationB
only from enclosed areas free from sources of vapor ignitionC
from the open deckD
from within the vessel
考题
单选题Liquid bulk cargo is loaded and discharged by ()(泵).A
pipesB
tubesC
bucketsD
pumps
考题
单选题The ship will be responsible for the cargo loaded or unloaded().A
only when the cargo is within its railB
during the time when loading or ynloading is going onC
after the cargo is checked by tallymenD
as soon as loading or discharging begins
考题
单选题()cargo means to check all cargo loaded into or discharged from a vessel.A
TallyingB
ExaminingC
WeighingD
Handling
考题
单选题According to regulations,access to a cargo pumproom in a tank vessel carrying grades C or D liquid cargo shall be().A
from areas equipped with power ventilationB
only from enclosed areas free from sources of vapor ignitionC
from the open deckD
from within the vessel
考题
单选题After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or().A
within 4 days after the seaman's dischargeB
prior to the vessel's departure on the next voyageC
prior to loading any out-bound cargoD
prior to any change of Master
考题
单选题()of the following statements is incorrect regarding a fire and boat drill ao board your cargo vessel.A
At least one fire and drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replacedB
The Master is responsible in seeing thst each lifeboat is lowered to the water at least once in each 6 monthsC
Lifeboat equipment shall be examined at least once each month to insure that it is completeD
An entry shall be made in the vessels official Logbook relative eo each fire and boat drill
考题
单选题The()(非包装货) is loaded and discharged by belt conveyer.A
non-packed cargoB
packed cargoC
cased cargoD
inboard cargo