网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The safest procedure used to rig a guy and preventer is to have the guy().
A

and preventer have equal stress

B

stronger than the preventer to minimize the danger of separation

C

take a lighter load than the preventer as a safety factor

D

take the stress in case the preventer parts


参考答案

参考解析
解析: 暂无解析
更多 “单选题The safest procedure used to rig a guy and preventer is to have the guy().A and preventer have equal stressB stronger than the preventer to minimize the danger of separationC take a lighter load than the preventer as a safety factorD take the stress in case the preventer parts” 相关考题
考题 An organization chart is used ()A. to show exact figuresB. to show lines of authorityC. to illustrate a procedure

考题 Which two statements are true about the use of the procedures listed in the vsysaux_occupants.move_procedure column?() A. The procedure may be used for some components to relocate component data to the SYSAUX tablespace from its current tablespace.B. The procedure may be used for some components to relocate component data from the SYSAUX tablespace to another tablespace.C. All the components may be moved into SYSAUX tablespace.D. All the components may be moved from the SYSAUX tablespace.

考题 A low pressure annular preventer which is used to direct flow of kick fluids away from the rig floor is called a ______.A.dump valveB.deflectorC.separatorD.diverter

考题 After a liferaft is launched,the operating cord ______.A.serves as a sea painterB.detaches automaticallyC.is used to rig the boarding ladderD.is cut immediately as it is of no further use

考题 In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point ______.A.Abreast the heelB.At right angles to the boom when viewed from aboveC.Aft of the heelD.Forward of the spiderband

考题 The safest procedure used to rig a guy and preventer is to have the guy ______.A.and preventer have equal stressB.stronger than the preventer to minimize the danger of separationC.take a lighter load than the preventer as a safety factorD.take the stress in case the preventer parts

考题 The safest device used to secure the end of the pendant wire when it is initially passed to the anchor handling vessel is a ______.A.Pelican hookB.Hydraulic deck stopperC.Connecting linkD.Shackle

考题 If the cargo gear on your vessel is equipped with a regular guy and a preventer guy,you should ______.A.Let the schooner guy take most of the strain,thus transferring the load to the opposite boomB.Leave the preventer guy slackC.Secure them as close together as possible on deckD.Secure them so the angle between them is 90° at the boom head

考题 The preventer guy,as used on a conventional yard and stay rig,______.A.Is rigged at an angle of 70° to 90° from the guy it assistsB.Takes the strain imposed on the schooner guy when burtoning cargoC.Is rigged when lifting cargo that exceeds the SWL of a single whipD.Should take the strain if the regular guy parts

考题 The storage device for nitrogen-pressurized hydraulic fluid,which is used in closing the blowout preventers is called the ______.A.ActuatorB.AnnulusC.AccumulatorD.Annular preventer

考题 You are a senior network administrator at TestKing, and while performing thepassword recovery procedure on your 2500 series Cisco router, you type in thefollowing command:o/r 0x2142What is the purpose of this command?()A、It is used to restart the router.B、It is used to bypass the configuration in NVRAM.C、It is used to enter ROM Monitor mode.D、It is used to view the lost password.E、It is used to save the changes to the configuration.

考题 单选题The purpose of a preventer as it is used on a conventional yard and stay cargo rig is to().A allow greater than normal loads to be handled by the gearB act as an inboard guy in the event the inboard guy parts during cargo handlingC assist the outboard guy in supporting stresses during cargo handlingD prevent the inboard guy from parting due to stresses during cargo handling

考题 单选题After a liferaft is launched,the operating cord().A serves as a sea painterB detaches automaticallyC is used to rig the boarding ladderD is cut immediately as it is of no further use

考题 单选题The bosun has thrown the liferaft into the water before abandoning the vessel. The operating cord().A serves as a sea painterB detaches from the liferaft automaticallyC is used to rig the boarding ladderD is cut immediately as it is of no further use

考题 单选题A shepherd’s crook is used to().A lower spring buoys into the waterB find an anchor after the buoy has been lostC transfer a pennant wire to the anchor handling boatD clean chain as it is hauled into the rig

考题 单选题The safest device used to secure the end of the pendant wire when it is initially passed to the anchor handling vessel is a().A pelican hookB hydraulic deck stopperC connecting linkD shackle

考题 单选题A low pressure annular preventer which is used to direct flow of kick fluids away from the rig floor is called a ().A dump valveB deflectorC separatorD diverter

考题 单选题The storage device for nitrogen-pressurized hydraulic fluid,which is used in closing the blowout preventers is called the().A actuatorB annulusC accumulatorD annular preventer

考题 单选题If the cargo gear on your vessel is equipped with a regular guy and a preventer guy,you should().A let the schooner guy take most of the strain,thus transferring the load to the opposite boomB leave the preventer guy slackC secure them as close together as possible on deckD secure them so the angle between them is 90°at the boom head

考题 单选题The maximum theoretical stress that can be developed on a guy in a yard and stay rig is limited by the().A lifting capacity of the winchB location of the boomC position of the guyD weight of the load

考题 单选题The preventer guy,as used on a conventional yard and stay rig,().A is rigged at an angle of 70°to 90°from the guy it assistsB takes the strain imposed on the schooner guy when burtoning cargoC is rigged when lifting cargo that exceeds the SWL of a single whipD should take the strain if the regular guy parts

考题 多选题Which DBMS_SCHEDULER procedure(s) can be used to alter an existing job? ()ASET_ATTRIBUTE_NULLBALTER_JOBCALTER_JOB_PARAMETERSDALTERESET_ATTRIBUTE

考题 单选题Which object may be used during query optimization to improve the performance for a subset of SELECT queries?()A MQTB TriggerC Read Only CursorD Stored Procedure

考题 单选题A preventer guy().A prevents anyone from working the cargo at unauthorized timesB is a safety measure in case one of the outboard guys partsC is a longshoreman who watches for accidentsD is the same as a blacksmith

考题 单选题The shear rams of a ship blowout preventer stack are used in emergency well control to().A close and seal around the drill pipeB close and seal around casingC cut off pipe inside the preventer stackD close and seal around drill collars

考题 单选题In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point().A Abreast the heelB At right angles to the boom when viewed from aboveC Aft of the heelD Forward of the spiderband

考题 单选题In a married falls rig at the after end of a hatch , a boom is rigged in a fore and aft line through its heel . Stresses on the outboard guy will be least if the guy is made fast at a point().A abreast the heelB at right angles to the boom when viewed from aboveC aft of the heelD forward of the spiderband