网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The safest procedure used to rig a guy and preventer is to have the guy().
A
and preventer have equal stress
B
stronger than the preventer to minimize the danger of separation
C
take a lighter load than the preventer as a safety factor
D
take the stress in case the preventer parts
参考答案
参考解析
解析:
暂无解析
更多 “单选题The safest procedure used to rig a guy and preventer is to have the guy().A and preventer have equal stressB stronger than the preventer to minimize the danger of separationC take a lighter load than the preventer as a safety factorD take the stress in case the preventer parts” 相关考题
考题
An organization chart is used ()A. to show exact figuresB. to show lines of authorityC. to illustrate a procedure
考题
Which two statements are true about the use of the procedures listed in the vsysaux_occupants.move_procedure column?()
A. The procedure may be used for some components to relocate component data to the SYSAUX tablespace from its current tablespace.B. The procedure may be used for some components to relocate component data from the SYSAUX tablespace to another tablespace.C. All the components may be moved into SYSAUX tablespace.D. All the components may be moved from the SYSAUX tablespace.
考题
A low pressure annular preventer which is used to direct flow of kick fluids away from the rig floor is called a ______.A.dump valveB.deflectorC.separatorD.diverter
考题
After a liferaft is launched,the operating cord ______.A.serves as a sea painterB.detaches automaticallyC.is used to rig the boarding ladderD.is cut immediately as it is of no further use
考题
In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point ______.A.Abreast the heelB.At right angles to the boom when viewed from aboveC.Aft of the heelD.Forward of the spiderband
考题
The safest procedure used to rig a guy and preventer is to have the guy ______.A.and preventer have equal stressB.stronger than the preventer to minimize the danger of separationC.take a lighter load than the preventer as a safety factorD.take the stress in case the preventer parts
考题
The safest device used to secure the end of the pendant wire when it is initially passed to the anchor handling vessel is a ______.A.Pelican hookB.Hydraulic deck stopperC.Connecting linkD.Shackle
考题
If the cargo gear on your vessel is equipped with a regular guy and a preventer guy,you should ______.A.Let the schooner guy take most of the strain,thus transferring the load to the opposite boomB.Leave the preventer guy slackC.Secure them as close together as possible on deckD.Secure them so the angle between them is 90° at the boom head
考题
The preventer guy,as used on a conventional yard and stay rig,______.A.Is rigged at an angle of 70° to 90° from the guy it assistsB.Takes the strain imposed on the schooner guy when burtoning cargoC.Is rigged when lifting cargo that exceeds the SWL of a single whipD.Should take the strain if the regular guy parts
考题
The storage device for nitrogen-pressurized hydraulic fluid,which is used in closing the blowout preventers is called the ______.A.ActuatorB.AnnulusC.AccumulatorD.Annular preventer
考题
You are a senior network administrator at TestKing, and while performing thepassword recovery procedure on your 2500 series Cisco router, you type in thefollowing command:o/r 0x2142What is the purpose of this command?()A、It is used to restart the router.B、It is used to bypass the configuration in NVRAM.C、It is used to enter ROM Monitor mode.D、It is used to view the lost password.E、It is used to save the changes to the configuration.
考题
单选题The purpose of a preventer as it is used on a conventional yard and stay cargo rig is to().A
allow greater than normal loads to be handled by the gearB
act as an inboard guy in the event the inboard guy parts during cargo handlingC
assist the outboard guy in supporting stresses during cargo handlingD
prevent the inboard guy from parting due to stresses during cargo handling
考题
单选题After a liferaft is launched,the operating cord().A
serves as a sea painterB
detaches automaticallyC
is used to rig the boarding ladderD
is cut immediately as it is of no further use
考题
单选题The bosun has thrown the liferaft into the water before abandoning the vessel. The operating cord().A
serves as a sea painterB
detaches from the liferaft automaticallyC
is used to rig the boarding ladderD
is cut immediately as it is of no further use
考题
单选题A shepherd’s crook is used to().A
lower spring buoys into the waterB
find an anchor after the buoy has been lostC
transfer a pennant wire to the anchor handling boatD
clean chain as it is hauled into the rig
考题
单选题The safest device used to secure the end of the pendant wire when it is initially passed to the anchor handling vessel is a().A
pelican hookB
hydraulic deck stopperC
connecting linkD
shackle
考题
单选题A low pressure annular preventer which is used to direct flow of kick fluids away from the rig floor is called a ().A
dump valveB
deflectorC
separatorD
diverter
考题
单选题The storage device for nitrogen-pressurized hydraulic fluid,which is used in closing the blowout preventers is called the().A
actuatorB
annulusC
accumulatorD
annular preventer
考题
单选题If the cargo gear on your vessel is equipped with a regular guy and a preventer guy,you should().A
let the schooner guy take most of the strain,thus transferring the load to the opposite boomB
leave the preventer guy slackC
secure them as close together as possible on deckD
secure them so the angle between them is 90°at the boom head
考题
单选题The maximum theoretical stress that can be developed on a guy in a yard and stay rig is limited by the().A
lifting capacity of the winchB
location of the boomC
position of the guyD
weight of the load
考题
单选题The preventer guy,as used on a conventional yard and stay rig,().A
is rigged at an angle of 70°to 90°from the guy it assistsB
takes the strain imposed on the schooner guy when burtoning cargoC
is rigged when lifting cargo that exceeds the SWL of a single whipD
should take the strain if the regular guy parts
考题
多选题Which DBMS_SCHEDULER procedure(s) can be used to alter an existing job? ()ASET_ATTRIBUTE_NULLBALTER_JOBCALTER_JOB_PARAMETERSDALTERESET_ATTRIBUTE
考题
单选题Which object may be used during query optimization to improve the performance for a subset of SELECT queries?()A
MQTB
TriggerC
Read Only CursorD
Stored Procedure
考题
单选题A preventer guy().A
prevents anyone from working the cargo at unauthorized timesB
is a safety measure in case one of the outboard guys partsC
is a longshoreman who watches for accidentsD
is the same as a blacksmith
考题
单选题The shear rams of a ship blowout preventer stack are used in emergency well control to().A
close and seal around the drill pipeB
close and seal around casingC
cut off pipe inside the preventer stackD
close and seal around drill collars
考题
单选题In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point().A
Abreast the heelB
At right angles to the boom when viewed from aboveC
Aft of the heelD
Forward of the spiderband
考题
单选题In a married falls rig at the after end of a hatch , a boom is rigged in a fore and aft line through its heel . Stresses on the outboard guy will be least if the guy is made fast at a point().A
abreast the heelB
at right angles to the boom when viewed from aboveC
aft of the heelD
forward of the spiderband