网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
多选题
Which three items should the site survey documentation include?()
A
photographs
B
floor plans
C
wired network layout
D
blueprints
参考答案
参考解析
解析:
暂无解析
更多 “多选题Which three items should the site survey documentation include?()AphotographsBfloor plansCwired network layoutDblueprints” 相关考题
考题
Which of the following is the FIRST course of action before implementing a change to a server?()
A. Survey users to get their response to the potential server change.B. The change should be approved by management.C. Switch over to the alternate site so users are not affected.D. Implement RAID so the server does not go offline.
考题
Where should known problem areas in the site survey be documented?()A、nowhere (but should be discussed with the customer)B、on the site survey map and within the site survey textC、on the customers blueprintsD、in the Cisco WCS Planning Tool
考题
A blinking green LED indicates which of the following conditions on a Cisco 1030 Remote EdgeAP?()A、startupB、site survey modeC、lost connection to the controllerD、duplicate IP address
考题
What is a site survey best practice for location-based services?()A、20 percent cell overlapB、four access points detecting a client at -76 dBm or betterC、10 percent cell overlapD、three access points detecting a client at -75 dBm or better
考题
A blinking green led indicates which of the following conditions on a cisco 1030 remote edge ap?()A、startupB、site survey modeC、lost connection to the controllerD、duplicate ip address
考题
How should the transmit power on an access point and client each be set during a site survey?()A、at 30mWB、matched to the antenna gainC、differing by at least 20 dBiD、matched to each other
考题
Which two of these statements describe important aspects of performing a wireless site survey? (Choose two.) ()A、 An 802.11 g access point with a variety of antennas can be used in all standard site surveys.B、 Site surveys can be performed manually or through assisted site survey.C、 Channel power during testing starts at the default minimum and gradually increases to the maximum.D、 Overlapping access points can create performance problems.E、 Surveys should be done after hours in an office building or during reduced inventory levels in warehouses.
考题
You have a single Active Directory directory service domain with three sites named Site1,Site2,and Site3. There are site links between all three sites,and replication between sites occurs every 30 minutes. You need to ensure that all replication traffic is routed through Site2. What should you do?() A、 Define a preferred bridgehead server for Site2.B、 Reduce the interval between replications between Site1 and Site2 and between Site2 and Site3.C、 Decrease the cost of the site link between Site1 and Site3.D、 Increase the cost of the site link between Site1 and Site3.
考题
A blinking green power LED indicates which of the following conditions on a Cisco Series 1000 lightweight access point?()A、lost connection to the controllerB、duplicate IP addressC、startupD、site survey mode
考题
Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? ()A、 identifying and assessing customer business requirementsB、 documenting and categorizing customer business requirements in terms of performance, availability, capacity and securityC、 producing a documented technology strategyD、 creating a bill of materialsE、 presenting documented business requirements to a customer and having the customer validate themF、 completing a site survey
考题
Which statement regarding the site-survey process is correct?()A、In a multifloor building, the access point layout from the survey of one floor can be directly applied to the remaining floorsB、Access points can be installed in the same place on every floor, without worrying about co-channelinterferenceC、You can survey with a Cisco AIR-ANT5959 in a plenum environmentD、Identify all hazardous and restricted areas that might require extra or special survey and installationwork
考题
Which is NOT part of a typical wireless site survey?()A、Implementation suggestionsB、Access point locationsC、Security requirementsD、Access point mounting methods
考题
Which three of these items are IPv6 transition mechanisms? ()(Choose three.)A、ISATAPB、NATV6C、manually configured overlay tunnelsD、dual stack configurations
考题
Which three items should the site survey documentation include?()A、photographsB、floor plansC、wired network layoutD、blueprints
考题
When determining a customer’s security requirements using the security site survey from the steps for success methodology, which three of theses should be included in the customer’s security policy and procedures?()A、Third-party due diligence policy reviewB、Remote Access PolicyC、Encryption PolicyD、Application change control policyE、Security Personnel policy
考题
Which of the following items would MOST likely be kept in a documentation file for each server?()A、 Cost of the equipmentB、 The users home directoriesC、 Server configurationD、 Warranty informationE、 Accessories that came with the system
考题
Which of the following is the FIRST course of action before implementing a change to a server?()A、 Survey users to get their response to the potential server change.B、 The change should be approved by management.C、 Switch over to the alternate site so users are not affected.D、 Implement RAID so the server does not go offline.
考题
Which IBM System Storage DS8000 copy function provides a three-site or three-copy solutionusing both synchronous and asynchronous replication?()A、FlashCopyB、Metro/Global MirrorC、Metro MirrorD、Global Mirror
考题
单选题Where should known problem areas in the site survey be documented?()A
nowhere (but should be discussed with the customer)B
on the site survey map and within the site survey textC
on the customers blueprintsD
in the Cisco WCS Planning Tool
考题
单选题All items such as steam pipes, exhaust pipes and fittings which, because of their location and operating temperature, present a hazard should be adequately lagged.That means the items should()A
not be put into operation too earlyB
be pay adequate attention toC
be used only when necessaryD
be coated with certain material
考题
多选题Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? ()Aidentifying and assessing customer business requirementsBdocumenting and categorizing customer business requirements in terms of performance, availability, capacity and securityCproducing a documented technology strategyDcreating a bill of materialsEpresenting documented business requirements to a customer and having the customer validate themFcompleting a site survey
考题
单选题To which parameter should the access point be set during a site survey?()A
Transmit onlyB
DiversityC
Receive onlyD
Single isolated antenna
考题
单选题How should the transmit power on an access point and client each be set during a site survey?()A
at 30mWB
matched to the antenna gainC
differing by at least 20 dBiD
matched to each other
考题
多选题Which of the following should be kept in uninterruptible power supply (UPS) documentation records?()AAntivirus software versionBBattery replacement dateCWire shelving diagramDIP address for network printerEShutdown delay timing
考题
多选题Which two of these statements describe important aspects of performing a wireless site survey? (Choose two.) ()AAn 802.11 g access point with a variety of antennas can be used in all standard site surveys.BSite surveys can be performed manually or through assisted site survey.CChannel power during testing starts at the default minimum and gradually increases to the maximum.DOverlapping access points can create performance problems.ESurveys should be done after hours in an office building or during reduced inventory levels in warehouses.
考题
单选题If there is an existing 802.11g WLAN at a site, which service can be provided without conducting anew site survey?()A
Add a new 802.11a WLANB
Increase the Layer 2 and Layer 3 security of the WLANC
Increase the throughput for the wireless clientsD
Add new services (such as voice) over the WLAN
考题
单选题Which of the following is the FIRST course of action before implementing a change to a server?()A
Survey users to get their response to the potential server change.B
The change should be approved by management.C
Switch over to the alternate site so users are not affected.D
Implement RAID so the server does not go offline.