网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Keeping the draft at or below the load line mark will insure that the vesselhas adequate().
A

ballast

B

reserve buoyancy

C

displacement

D

rolling periods


参考答案

参考解析
解析: 暂无解析
更多 “单选题Keeping the draft at or below the load line mark will insure that the vesselhas adequate().A ballastB reserve buoyancyC displacementD rolling periods” 相关考题
考题 The maximum draft to which a vessel can legally be submerged is indicated by the ______.A.Loadline markB.Certificate of InspectionC.Station BillD.Tonnage mark

考题 As operator of a 199 GT towing vessel sailing foreign,it shall be your duty to enter in the Official Logbook or other permanent record ______.A.all information contained on the barge's Certificate of InspectionB.the condition of all towing gear to be usedC.all navigational aids to be usedD.the barges load line and draft readings

考题 You are loading in the winter in Albany,N.Y.,for a voyage to a port governed by the tropical load line mark. Which of the following statements is TRUE? (Hydrometer reading in Albany is 1.000)A.You may not exceed the winter load line mark when you finish loading except for the burnout to seaB.You may calculate the burnout necessary to reach the tropical zone and load extra cargo to compensateC.The freshwater allowance and burnout to sea may be subtracted from the required freeboard in AlbanyD.You may load to the winter mark less the fresh water allowance if you will be at the tropical mark upon arrival in the tropical zone

考题 The document that certifies the correctness of the load line marks on a ship is called the ______.A.Certificate of InspectionB.Load line certificateC.Certificate of DocumentationD.SOLAS Certificate

考题 Keeping the draft at or below the load line mark will insure that the vessel has adequate ___.A.ballastB.reserve buoyancyC.displacementD.rolling periods

考题 Which of the following can be used to insert a new line below the current line inside a vi session?()A、oB、aC、pD、A

考题 What is true regarding direct-load insert?()A、A direct-load insert can be invoked by suing the APPEND hint.B、Inserting using the NOLOGGING option is the default for direct-load inserts.C、All data loaded using direct-load insert is loaded below the high-water mark.D、An object that is modifies using parallel direct-load can be queried within the same Transaction.

考题 单选题Keeping the draft at or below the load line mark will insure that the vessel has adequate().A ballastB reserve buoyancyC displacementD rolling periods

考题 单选题A vessel displaying three red lights in a vertical line is().A not under commandB agroundC dredgingD constrained by her draft

考题 单选题The ship has()of more than 10 meters at full load.A an engineB an overall lengthC a displacementD a draft

考题 单选题Which of the following can be used to insert a new line below the current line inside a vi session?()A oB aC pD A

考题 单选题A disk with a horizontal line through its center, equivalent to the summer load line, is called the().A deadrise markB maximum alloable draft markC pilmsoll markD tonnage mark

考题 单选题When ship is fouled, increasing the fuel injection for keeping the normal speed will cause the main engine ()A to work as overload characteristicB overspeedC over mechanical load onlyD over thermal load only

考题 单选题The mean draft of a ship is the draft().A midway between the forward and aft draft marksB at the center of flotationC at the load lineD at the center of buoyancy

考题 单选题()is the draft of your ship at full load?A How manyB How muchC How highD What

考题 单选题In line 38, the word mark most nearly means ______.A blemishB etchingC indicationD symbolE portent

考题 单选题A load line is assigned to a ship to insure adequate stability and().A mooring tensionB riser tensionC lifesaving equipmentD structural strength

考题 单选题Which is the summer load waterline on the load waterline mark?().A The first line at the bottomB The second line from the bottomC The third line from the bottomD The fourth line from the bottom

考题 单选题The International Load Line Certificate is a document indicating () of the various load lines of the vessel.A decksB cabinsC holdsD positions

考题 单选题The holding power of an anchor is the().A maximum sustained vertical load an anchor will resist before draggingB maximum sustained horizontal load an anchor will resist before draggingC maximum sustained vertical load an anchor will resist before the mooring line breaksD maximum sustained horizontal load an anchor will resist before the mooring line breaks

考题 单选题Vertically below the deckline is a circle whose outside diameter is 300mm.It is called the().A the deck lineB Plimsoll discC Plimsoll lineD summer load line

考题 单选题Load line regulations are designed to insure that a vessel has adequate structural strength and sufficient().A lifesaving equipmentB stabilityC mooring tensionD riser tension

考题 单选题The maximum draft to which a vessel can legally be submerged is indicated by the ().A Loadline markB Certificate of InspectionC Station BillD Tonnage mark

考题 单选题Which is the winter load waterline on the load waterline mark?().A The line over the summer load waterlineB The line above the tropical load waterlineC The line below the tropical load waterlineD The line between the summer and the winter north Atlantic load waterline

考题 单选题What is true regarding direct-load insert?()A A direct-load insert can be invoked by suing the APPEND hint.B Inserting using the NOLOGGING option is the default for direct-load inserts.C All data loaded using direct-load insert is loaded below the high-water mark.D An object that is modifies using parallel direct-load can be queried within the same Transaction.

考题 单选题As operator of a 199 GT towing vessel sailing foreign,it shall be your duty to enter in the Official Logbook or other permanent record().A all information contained on the barge's Certificate of InspectionB the condition of all towing gear to be usedC all navigational aids to be usedD the barges load line and draft readings

考题 单选题What does MBDD mean on the load waterline mark?().A Timber tropical load waterlineB Timber summer load waterlineC Timber winter load waterlineD Timber winter north Atlantic load waterline