网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
During the watch keeping at sea, the engineer in charge should notify in the event of any serious occurrence or a situation where he is unsure of the action to take()
A
the master
B
the chief engineer
C
the bridge
D
the company superintendent
参考答案
参考解析
解析:
暂无解析
更多 “单选题During the watch keeping at sea, the engineer in charge should notify in the event of any serious occurrence or a situation where he is unsure of the action to take()A the masterB the chief engineerC the bridgeD the company superintendent” 相关考题
考题
STCW78/95 Convention describes that _____ are laid down for the certification of engineer officers in charge of a watch in a traditionally manned engine room, or the designated engineer in a periodically unmanned engine room.A.available minimum requirementsB.available maximum requirementsC.mandatory minimum requirementsD.mandatory maximum requirements
考题
At an unsheltered anchorage the chief engineer officer shall consult with_______whether or not to maintain an underway watchA.the engineer officer in charge of watchB.the deck officer in charge of watchC.the masterD.the chief mate
考题
During the watch keeping at sea, the engineer in charge should notify______in the event of any serious occurrence or a situation where he is unsure of the action to takeA.the masterB.the chief engineerC.the bridgeD.the company superintendent
考题
STCW78/95 Convention states that the officer in charge of the engineering watch is the representativeA.ship-owner'sB.master'sC.chief engineer'sD.manager's
考题
The engineer ______ the watch to the relieving officer if there is reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties effectively.A.shall take overB.shall not take overC.shall hand overD.shall not hand over
考题
At an unsheltered(开放的) anchorage the chief engineer officer shall consult with ______whether or not to maintain an underway watch.A.the engineer officer in charge of watchB.the deck officer in charge of watchC.the masterD.the chief mate
考题
The Company should establish in the SMS that ______has the overriding authority and the responsibility to make decisions with respect to safety and pollution prevention.A.the masterB.the chief engineerC.the officer on dutyD.the engineer in charge of watch
考题
单选题At an unsheltered anchorage the chief engineer officer shall consult with () whether or not to maintain an underway watch.A
the engineer officer in charge of watchB
the deck officer in charge of watchC
the masterD
the chief mate
考题
单选题The officer in charge of the engineering ()the watch to the reliving officer if there is reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties effectively.A
shall take overB
shall not take overC
shall hand overD
shall not hand over
考题
单选题The officer in charge of the engineering watch shall continue to be responsible for machinery operations, ()the presence of the chief engineer in the machinery space.A
as long asB
unlessC
despiteD
till
考题
单选题The officer in charge of the engineering watch shall notify the chief engineer without delay ().A
in any emergency or if in any doubt as to what decision or measures to takeB
in the event of any impending action in machinery spaces that may cause reduction in ship’s speedC
when isolating and bypassing machinery to be worked onD
co-operating with any engineer in charge of maintenance work
考题
单选题While on watch at sea you must maintain a proper lookout at all times. On a 700-foot cargo vessel being hand-steered during daylight hours in good visibility and clear of any navigational hazards,the lookout may be().A
the helmsmanB
the mate on watchC
Either A or BD
Neither A nor B
考题
单选题When the chief engineer is in the machinery spaces, the officer in charge of the engineering watch shall()A
continue to be responsible for machinery space operations despite the presence of the CEB
hand over the responsibility activelyC
be responsible for the watching together with the chief engineerD
assistant the chief engineer to control the machinery
考题
单选题At an unsheltered anchorage the chief engineer officer shall consult with the master whetheror not to maintain an underway watch“An underway watch” means()A
a watch which is kept with lower standardB
a watch which is kept when the ship isnt sailingC
a watch which is kept when the ship is sailingD
a watch which is kept when the ship is in a restricted visibility area
考题
单选题During an engine room watch if immediate action is necessary to ensure safety of the ship its machinery and crew ()A
the chief engineer must be informed at firstB
the captain must be informed at firstC
it must be taken by the duty engineerD
the generator engine must be stopped
考题
单选题During the watch at sea () should be logged or recorded in the engine log book.A
the running hours of the cooling water pumpB
chief engineer’s orderC
the main parameters of main and auxiliary equipmentD
the position of the vessel
考题
单选题When the engine room is put in standby condition, the engineer in charge of the watch need not to()A
ensure all machinery which may be used during maneuvering is in readyB
ensure an adequate reserve of power is available for steering gear and other requirementsC
keep the main propulsion unit controls continuously attended when in the manual mode of operationD
ensure all machinery which may be used during maneuvering is running stably
考题
单选题STCW78/95 Convention describes that () are laid down for the certification of engineer officers in charge of a watch in a traditionally manned engine room, or the designated engineer in a periodically unmanned engine room.A
available minimum requirementsB
available maximum requirementsC
mandatory minimum requirementsD
mandatory maximum requirements
考题
单选题During the watch keeping at sea, routine adjustments should be ()A
made and noted as required by the duty engineerB
reported to chief engineer immediately after being made by duty engineerC
never made before getting permission from chief engineerD
made as required but not logged
考题
单选题During the watch keeping at sea, at appropriate intervals inspection should be made of (), auxiliary machinery and steering gear spaces by the duty engineer.A
the main propulsion plantB
lifesaving jacketsC
lifeboat engineD
state of emergency generator
考题
单选题During the watch at sea, where situations occur in the machine apace which may affect the speed maneuverability, power supply or other essentials for the safe operation of the ship()should be informed as soon as possible.A
the chief engineerB
the masterC
the bridgeD
the company superintendent
考题
单选题The Company should establish in the SMS that () has the overriding authority and the responsibility to make decisions with respect to safety and pollution prevention.A
the masterB
the chief engineerC
the officer on dutyD
the engineer in charge of watch
考题
单选题The officer of the watch()a good lookout on the bridge.A
keepB
keepingC
keepsD
is keeping
考题
单选题The responsibilities of the engineer officer in charge of the watch do not include ()A
to ensure the main propulsion plant are kept under constant surveillanceB
to ensure the auxiliary systems are kept under constant surveillanceC
to inspect the steering gear spaces at suitable intervalsD
to inspect and overhaul the equipments in his charge
热门标签
最新试卷