网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Structural stress levels in a ship are the sum of loading stresses and stresses due to().
A
environmental loads
B
variable loads
C
ballast loading
D
mooring loads
参考答案
参考解析
解析:
暂无解析
更多 “单选题Structural stress levels in a ship are the sum of loading stresses and stresses due to().A environmental loadsB variable loadsC ballast loadingD mooring loads” 相关考题
考题
When off loading garbage to another ship, your records must identify that ship by name and ______.A.home portB.operator's name of recordC.official numberD.master's name
考题
During loading or discharging,the tallymen must make contact with______on duty so as to solve problems in time.A.ship ownerB.ship’s officersC.ConsignorsD.shippers
考题
When do sailors make the ship fast? ()A、When a ship is unmooring.B、After a ship is in position alongside a wharf.C、Before a ship is loading.D、A and C
考题
The ()is pumped onto the ship at the loading port by shore pumps.A、oilB、gasC、water and fuelD、timber
考题
船舶需要装卸货。()A、The ship needs loading.B、The ship needs discharging.C、The ship needs unloading.D、The ship needs loading and discharging.
考题
The oil is usually pumped into ship at the loading port by().A、ship’s own pumpsB、shore pumpsC、large pipesD、large tubes
考题
Which narrative regarding loading software is incorrect?()A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD、A Loading Program may be provided as a classification requirement or as an Owner’s option
考题
单选题The port clearance for a ship should be granted()the completion of loading or discharging in the port.A
beforeB
whenC
afterD
during
考题
单选题Structural stress on a ship can be reduced by().A
lessening the effect of environmental forcesB
even and symmetrical variable loadingC
local concentration of heavy consumablesD
increasing the metacentric height
考题
单选题My ship is()No.5 berth for loading.A
onto the wharfB
moved asternC
into the dockD
moored alongside
考题
单选题()is the main center-line structural member,running fore and aft along the bottom of a ship,sometimes referred to as the backbone.A
FrameB
DeckbeamC
StringerD
Keel
考题
单选题The central longitudinal structural hull strength member of the lower hulls of semisubmersible ship’s is called the().A
stress plateB
keelC
rider plateD
main beam
考题
单选题Repair of vital machinery and services on a ship should be accomplished().A
after control of fire,flooding,and structural repairsB
immediatelyC
after control of fire,but before control of floodingD
after stability is restored
考题
单选题The ship will be responsible for the cargo loaded or unloaded().A
only when the cargo is within its railB
during the time when loading or ynloading is going onC
after the cargo is checked by tallymenD
as soon as loading or discharging begins
考题
单选题The oil is usually pumped into ship at the loading port by().A
ship’s own pumpsB
shore pumpsC
large pipesD
large tubes
考题
单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.A
in the loading placeB
in the port or dockC
in the loading spotD
in the discharging spot
考题
单选题Structural bulkheads on a ship are usually().A
continuousB
watertightC
transverseD
non-watertight
考题
单选题When off loading garbage to another ship, your records must identify that ship by name and ()A
home portB
operators name of recordC
official numberD
masters name
考题
单选题We will provide you with tips to help you keep your stress levels _____ control.A
forB
onC
underD
with
考题
单选题The order of importance in addressing damage control on a ship is().A
control flooding,control fire,repair structural damageB
restore vital services,control fire,control floodingC
control fire,restore vital services,control floodingD
control fire,control flooding,repair structural damage
考题
单选题When do sailors make the ship fast? ()A
When a ship is unmooring.B
After a ship is in position alongside a wharf.C
Before a ship is loading.D
A and C
考题
单选题船舶需要装卸货。()A
The ship needs loading.B
The ship needs discharging.C
The ship needs unloading.D
The ship needs loading and discharging.
考题
单选题The loading of the ship must be done in accordance with().A
the ship’s instructionsB
the terminal’s instructionsC
the port captain’s instructionsD
the charterer’s instructions
考题
单选题Which narrative regarding loading software is incorrect?()A
The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB
A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC
Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD
A Loading Program may be provided as a classification requirement or as an Owner’s option
考题
单选题Compared to internal structural plating,the exterior hull plating on a ship is usually().A
strongerB
thinnerC
more corrosion resistantD
a lower grade steel
热门标签
最新试卷