网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Structural stress levels in a ship are the sum of loading stresses and stresses due to().
A

environmental loads

B

variable loads

C

ballast loading

D

mooring loads


参考答案

参考解析
解析: 暂无解析
更多 “单选题Structural stress levels in a ship are the sum of loading stresses and stresses due to().A environmental loadsB variable loadsC ballast loadingD mooring loads” 相关考题
考题 Preparations for loading cargo on board ship.

考题 When off loading garbage to another ship, your records must identify that ship by name and ______.A.home portB.operator's name of recordC.official numberD.master's name

考题 During loading or discharging,the tallymen must make contact with______on duty so as to solve problems in time.A.ship ownerB.ship’s officersC.ConsignorsD.shippers

考题 When do sailors make the ship fast? ()A、When a ship is unmooring.B、After a ship is in position alongside a wharf.C、Before a ship is loading.D、A and C

考题 The ()is pumped onto the ship at the loading port by shore pumps.A、oilB、gasC、water and fuelD、timber

考题 船舶需要装卸货。()A、The ship needs loading.B、The ship needs discharging.C、The ship needs unloading.D、The ship needs loading and discharging.

考题 The oil is usually pumped into ship at the loading port by().A、ship’s own pumpsB、shore pumpsC、large pipesD、large tubes

考题 Which narrative regarding loading software is incorrect?()A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD、A Loading Program may be provided as a classification requirement or as an Owner’s option

考题 单选题The port clearance for a ship should be granted()the completion of loading or discharging in the port.A beforeB whenC afterD during

考题 单选题Our ship()loading yesterday morning.A finishB finishingC finishedD has finished

考题 单选题Structural stress on a ship can be reduced by().A lessening the effect of environmental forcesB even and symmetrical variable loadingC local concentration of heavy consumablesD increasing the metacentric height

考题 单选题My ship is()No.5 berth for loading.A onto the wharfB moved asternC into the dockD moored alongside

考题 单选题()is the main center-line structural member,running fore and aft along the bottom of a ship,sometimes referred to as the backbone.A FrameB DeckbeamC StringerD Keel

考题 单选题The central longitudinal structural hull strength member of the lower hulls of semisubmersible ship’s is called the().A stress plateB keelC rider plateD main beam

考题 单选题Repair of vital machinery and services on a ship should be accomplished().A after control of fire,flooding,and structural repairsB immediatelyC after control of fire,but before control of floodingD after stability is restored

考题 单选题The ship will be responsible for the cargo loaded or unloaded().A only when the cargo is within its railB during the time when loading or ynloading is going onC after the cargo is checked by tallymenD as soon as loading or discharging begins

考题 单选题The oil is usually pumped into ship at the loading port by().A ship’s own pumpsB shore pumpsC large pipesD large tubes

考题 单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.A in the loading placeB in the port or dockC in the loading spotD in the discharging spot

考题 单选题Structural bulkheads on a ship are usually().A continuousB watertightC transverseD non-watertight

考题 单选题When off loading garbage to another ship, your records must identify that ship by name and ()A home portB operators name of recordC official numberD masters name

考题 单选题We will provide you with tips to help you keep your stress levels _____ control.A forB onC underD with

考题 单选题The order of importance in addressing damage control on a ship is().A control flooding,control fire,repair structural damageB restore vital services,control fire,control floodingC control fire,restore vital services,control floodingD control fire,control flooding,repair structural damage

考题 单选题When do sailors make the ship fast? ()A When a ship is unmooring.B After a ship is in position alongside a wharf.C Before a ship is loading.D A and C

考题 单选题船舶需要装卸货。()A The ship needs loading.B The ship needs discharging.C The ship needs unloading.D The ship needs loading and discharging.

考题 单选题The loading of the ship must be done in accordance with().A the ship’s instructionsB the terminal’s instructionsC the port captain’s instructionsD the charterer’s instructions

考题 单选题Which narrative regarding loading software is incorrect?()A The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD A Loading Program may be provided as a classification requirement or as an Owner’s option

考题 单选题Compared to internal structural plating,the exterior hull plating on a ship is usually().A strongerB thinnerC more corrosion resistantD a lower grade steel