网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
What is a spill pipe?()
A

A drainage pipe that carries rain or spray from an upper deck to a lower deck

B

A pipe under the anchor windlass leading to the chain locker

C

A chute,usually over the stern,to lead dumped garbage clear of the hull

D

An opening in the deck leading outside the hull


参考答案

参考解析
解析: 暂无解析
更多 “单选题What is a spill pipe?()A A drainage pipe that carries rain or spray from an upper deck to a lower deckB A pipe under the anchor windlass leading to the chain lockerC A chute,usually over the stern,to lead dumped garbage clear of the hullD An opening in the deck leading outside the hull” 相关考题
考题 The safety stopper that prevents the anchor cable from running free if the cable jumps the wildcat is the ______.A.riding pawlB.devil's clawC.buckler plateD.spill pipe

考题 What is NOT a requirement of cargo piping installed in tank vessels carrying grade D or E cargo ONLY ________.A.The cargo piping system shall be fixedB.Flanged joints shall be used for pipe sizes exceeding 2 inches in diameterC.Piping through bunker spaces may be run through a pipe tunnelD.Connections at bulkheads must be made so that the plating does not form part of a flanged joint

考题 The opening in the deck beneath the anchor windlass that leads to the chain locker is the ______.A.Hawse pipeB.Fall pipeC.Drop-pipeD.Spill pipe

考题 The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a ______.A.StringB.StandC.JointD.Standpipe

考题 ______ contains procedures for the actions that can be taken if there is a fire or spill of dangerous goods.A.MFAGB.EmSC.IMDGD.BC

考题 As oil pipe line connections were broken, _____ quantity of oil was caused to spill onto the wharf and into the dock water.A.a not knowingB.an unknowingC.an unknownD.a not know

考题 The following tells us how to reuse the used water.Which is the right order of the passage A.to have the used water filtered B.to put chemicals in it C.to pipe it to the users D.to pipe the used water to be purified to a factory

考题 引入管service pipe

考题 管()A、lineB、hoseC、hawseD、pipe

考题 下管pipe sinking

考题 ALL CREW ASSIST TO CLEAN UP SPILL.的意思是:所有船员协助清理溢油。

考题 干线型肝硬变(pipe stem cirrhosis)

考题 QOS管道模型有下列哪几种?()A、差分模型B、Uniform模型C、Pipe模型D、Short Pipe模型

考题 单选题Your vessel is at a dock taking bunkers through a pipe laid down on the dock. If oil begins to flow out of a tank vent,what should you do FIRST?()A Open the intake valve to an adjacent tankB Set out drip pans and sawdust and begin to mop up the spillC Signal the shore control point to shut downD Close the valve on the tank vent line

考题 单选题The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a().A stringB standC jointD standpipe

考题 单选题The supplement to the IOPP Certificate contains what type of data? ()A The grades of cargo that an oil tanker is permitted to carryB A checklist of the equipment installed for controlling the discharge of oilC The trade routes upon which the vessel may operateD A list of the underwriters who will assume financial responsibility in the event of an oil spill

考题 单选题What will NOT increase friction of a liquid flowing in a pipe and cause a loss of suction head?().A Bends in the pipingB Slowing the pumping rateC Pipeline valvesD Backing rings for pipe welds

考题 单选题“Before disconnecting the oil pipe, would you flush the oil retained in the pipe?” asked the oil barge owner ()A by using of fresh waterB with compressed airC by using of sea waterD with chemical compound

考题 单选题As oil pipe line connections were broken,()quantity of oil was caused to spill onto the wharf and into the dock water.A a not knowingB an unknowingC an unknownD a not known

考题 单选题Which of the followings is not an indication of a bad maintenance?()A a pipe with welded connectionsB a pipe with several clipsC a cement boxD a leaking valve

考题 单选题In ship operations,hoisting and lowering pipe in and out of the drilled hole is the main function of the().A swivelB cathead spoolC drawworksD stand pipe

考题 单选题The outside diameter of the pipe is () the diameter of the bore of the piston rod, the result being that an annular space formed between the piston rod and the pipe.A less thanB greater thanC equal toD twice larger than

考题 单选题During transfer operations,a quantity of propylamine spills on deck. According to the Chemical Data Guide,the correct procedure would be to().A immediately flush the spill with large quantities of fresh waterB cover the contaminated surface with soda-ash-soaked lime solutionC add sodium bisulfate on the contaminated surface and spray it down with waterD move to a position upwind of the spill and allow the product to boil off

考题 名词解释题引入管service pipe

考题 单选题When possible,what should be the FIRST step in combating a fire on deck resulting from a cargo overflow or a leaking cargo line?()A Blanket the cargo spill with foamB Prevent the spread of fire with a foam damC Apply CO2 on burning fuel at its sourceD Shut off the transfer of cargo

考题 单选题If a spill occurs,where would you log it().A Oil Record BookB Bell bookC Smooth logbookD Official Logbook

考题 单选题After making the required notification that a large oil spill into the water has occurred,the FIRST action should be to().A apply straw or sawdust on the oilB contain the spread of the oilC throw grains of sand into the oilD have the vessel move out of the spill area