网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
When attempting an upstream landing while pushing empty barges ahead in a hard onshore wind,the approach is best made().
A
with bow out,stern in
B
with bow in,stern out
C
parallel to the dock,as close in as possible
D
parallel to the dock,as far out as possible
参考答案
参考解析
解析:
暂无解析
更多 “单选题When attempting an upstream landing while pushing empty barges ahead in a hard onshore wind,the approach is best made().A with bow out,stern inB with bow in,stern outC parallel to the dock,as close in as possibleD parallel to the dock,as far out as possible” 相关考题
考题
When the tube was empty, he reverted ______ plain water.
A. to useB. in usingC. to usingD. use
考题
When the statement was made, the plane ______.(A) was in the course of landing(B) had already landed(C) had just taken off(D) was in the middle of its flight
考题
When satisfied that there are no contagious diseases on board,the quarantine officer will issue ______.A.an outward clearanceB.a free pratiqueC.landing permitsD.shore passes
考题
When attempting an upstream landing while pushing empty barges ahead in a hard onshore wind,the approach is best made ______.A.With bow out,stern inB.With bow in,stern outC.Parallel to the dock,as close in as possibleD.Parallel to the dock,as far out as possible
考题
When landing a lifeboat through heavy surf with a strong current running parallel to the beach(from right to left when facing from seaward)the recommended procedure is to______.A.approach while coming to the left to take advantage of the currentB.drop an anchor outside the surf line,then pay out anchor line over the bow while the seas carry the boat toward the beachC.approach slow enough so that the boat can be brought around to meet breaking seas on the bowD.rig a drogue with tripping line over the bow,back ashore with drogue tripped between breakers
考题
It is outrageous that these buildings remain empty while thousands of people have no homes.A:unacceptable
B:unreasonable
C:disgusting
D:courageous
考题
When using VSD, traffic flow goes from the virtual machine to which of these?()A、 Upstream switchB、 Virtual Supervisor ModuleC、 VMware distributed switchD、 VMware vSwitchE、 Service virtual machine
考题
Which of the following are valid until command options when attempting point-in-time recovery in RMAN?()A、 until timeB、 until changeC、 until sequenceD、 until SCNE、 until commit
考题
单选题Which vessel is NOT to be regarded as restricted in her ability to maneuver().A
A vessel transferring provisions while underwayB
A pushing vessel and a vessel being pushed when connected in a composite unitC
A vessel servicing a navigation markD
A vessel launching aircraft
考题
单选题A tug is best positioned for towing and maneuvering on rivers and other restricted waters where wave action is limited when().A
directly astern and pushing the towB
towing on a hawserC
towing alongside and parallel to the vessel it is towingD
towing on the hip
考题
单选题A fifteen-pound CO2 extinguisher().A
contains 15 pounds of CO2B
weighs 15 pounds when full of CO2C
has 15 pounds of pressure at the nozzleD
weighs 15 pounds when empty
考题
多选题Which of the following are valid until command options when attempting point-in-time recovery in RMAN?()Auntil timeBuntil changeCuntil sequenceDuntil SCNEuntil commit
考题
单选题When pushing ahead,wires leading from the quarters of the after outboard barges to the bow of a towboat().A
prevent the towboat from sliding when the rudder is movedB
prevent the barges from spreading out when backing downC
hold the towboat securely to the bargesD
prevent the sidewise movement of the face barges
考题
单选题The plane was circling over the landing field for l5 minutes when the pilot was told that he should use the Westside Field.A
isB
Would beC
has beenD
had been
考题
单选题When a pushing vessel and a vessel()ahead are rigidly connected in a composite unit they shall be regarded as a power-driven vessel.A
is pushedB
being pushedC
was pushedD
be pushed
考题
单选题A Boeing 747 crashed into a hillside while attempting to land during a nighttime storm; 228 of the 254 people who were on board the plane _____.A
patrolledB
perceivedC
perishedD
plunged
考题
单选题When a ship is fully loaded, it needs to prevent the main engine to be().While a ship is fully empty, it needs to prevent the main engine to be().A
overspeed;overloadB
overload;overspeedC
over mechanical load;over thermal loadD
over torque;overspeed
考题
单选题When using VSD, traffic flow goes from the virtual machine to which of these?()A
Upstream switchB
Virtual Supervisor ModuleC
VMware distributed switchD
VMware vSwitchE
Service virtual machine
考题
单选题When landing a lifeboat through heavy surf with a strong current running parallel to the beach (from right to left when facing from seaward) the recommended procedure is to().A
approach while coming to the left to take advantage of the currentB
drop an anchor outside the surf line,then pay out anchor line over the bow while the seas carry the boat toward the beachC
approach slow enough so that the boat can be brought around to meet breaking seas on the bowD
rig a drogue with tripping line over the bow,back ashore with drogue tripped between breakers
考题
单选题Which one is not the normal operation for boiler shutdown?()A
Carry out soot blowing if permissibleB
Change fuel supply to diesel oilC
Close steam stop valves on boiler when pressure is reducedD
Drain boiler empty when it has cooled down
考题
单选题A towboat is pushing barges ahead at a dangerously fast speed when().A
the towboat vibrates when backing downB
the roostertail exceeds the height of the main deckC
a strain is placed on the face wiresD
water comes over the foredeck of the lead barges
考题
单选题When steering a tow downstream around the shape of a sand bar,and staying on the proper side of the buoys,an operator should be cautious of().A
eddies under the barB
swift current under the bar causing loss of controlC
cross-currents pushing the tow away from the barD
cross-currents pushing the tow into the bar
考题
单选题A vessel is proceeding downstream in a narrow channel on the Western Rivers when another vessel is sighted moving upstream. Which vessel has the right of way? ()A
The vessel moving upstream against the currentB
The vessel moving downstream with a following currentC
The vessel located more towards the channel centerlineD
The vessel with the least amount of maneuverability
考题
单选题Hanging a barge off means to().A
moor a damaged barge to the bank and leaveB
remove and deliver a loaded barge from a multiple towC
remove a barge while locking throughD
tow an empty barge astern
考题
单选题When a pushing vessel and a vessel being pushed are rigidly connected in a composite unit,they shall be regarded as().A
a tugboatB
a sailing vesselC
a power-driven vesselD
a vessel propelled by machinery and under sail
考题
单选题Which hazard probably would NOT be encountered when entering an empty but uncleaned fish hold?()A
Lack of oxygenB
Methane gasC
Hydrogen sulfide gasD
Carbon monoxide
热门标签
最新试卷