During a planning meeting, Company.com indicates that they intend to make a relational  Database highly available. The application has a pre-requisite that a kernel extension be loaded from /etc/inittab.  How would this be managed in an HACMP environment?()
A

 It can be started with a crontab entry.

B

 It can be created as an Application Server.

C

 It can be added to a resource group as a dependency.

D

 It cannot be done because HACMP provides no method to order application start/stop scripts.


参考答案

参考解析
解析: 暂无解析
更多 “单选题During a planning meeting, Company.com indicates that they intend to make a relational  Database highly available. The application has a pre-requisite that a kernel extension be loaded from /etc/inittab.  How would this be managed in an HACMP environment?()A  It can be started with a crontab entry.B  It can be created as an Application Server.C  It can be added to a resource group as a dependency.D  It cannot be done because HACMP provides no method to order application start/stop scripts.” 相关考题
考题 148 Network schedules are prepared during the _____ phase and updated during the _____ phase. A. Conceptual, execution.B. Development, implementation.C. Development, close-out.D. Implementation, close-out.E. Planning, finishing

考题 Susan: When's the meeting?Harry: I'm driving into London tomorrow morning. The meeting (60) .

考题 If I_____ Peter, I him about the meeting.A. see, will tellB. see, tellC. will see, tell

考题 I didn’t see her in the meeting room this morning, so I think she ( ) at the meeting. A、shouldn't have spokenB、needn't have spokenC、mustn’t have spokenD、couldn’t have spoken

考题 Xiaoyan:So, I' d like to come and see the flat.Franca: Yes, when is convenient? How about during the day? I usually work in theevening.Xiaoyan; Well,I work during the day, but perhaps in the afternoon?Franca:Well, why don't you come at about 5 o'clock?Xiaoyan:That's a good idea.Franca; Are you free on Thursday?Xiaoyan: No, I'm afraid I'm not. We always have a meeting on Thursday. What aboutWednesday?Franca:No, I' m sorry. I' m busy on Wednesday. I’m in Cambridge. Are you free onFriday?Xaaoyan:Yes,Friday is fine.Franca: Okay. See you on Friday at 5 o'clock at the flat.Xiaoyan;Thanks very much. Goodbye.Franca:Goodbye.1. Franca usually works during the day.A. RightB. Wrong2. It is convenient for both of them to meet in the afternoon.A. RightB. Wrong3.Xiaoyan is free on Wednesday.A. RightB. Wrong4. Franca is not free on Wednesday because he has a meeting.A. RightB. Wrong5. They are going to meet on Friday at the flat.A. RightB. Wrong

考题 I'm in a meeting until 1. 00. 翻译

考题 - Will you be able to come to the meeting? _____________A、I’m afraid notB、I’m sorry notC、I’m not afraid soD、I’m sorry that “no”

考题 scrum框架包含的会议有()。 A、Sprint计划会议(Sprint Planning Meeting)B、每日站立(Daily Standup)C、Sprint评价(Sprint Estimate)

考题 The most crucial time for project risk assessment is ( ).A.when a problem surfacesB.during the planning phaseC.during the close-out phaseD.after the project schedule has been published

考题 Bill suggested ______ a meeting on what to do for the Shanghai Expo during the vacation.A. having held B. to hold C. holding D. hold

考题 Please _______ the Planning staff (Debra Ross @ 222.3926) if you will or will not be attending this month’s meeting. A.notice B.present C.deliver D.notify

考题 The most crucial time for project risk assessment is ( ) . A.when a problem surfaces B.during the planning phase C.during the close-out phase D.after the project schedule has been published

考题 The most crucial time for project risk assessment is ( ).A、when a problem surfacesB、during the planning phaseC、during the close-out phaseD、after the project schedule has been published

考题 During a planning meeting, Company.com indicates that they intend to make a relational  Database highly available. The application has a pre-requisite that a kernel extension be loaded from /etc/inittab.  How would this be managed in an HACMP environment?()  A、 It can be started with a crontab entry.B、 It can be created as an Application Server.C、 It can be added to a resource group as a dependency.D、 It cannot be done because HACMP provides no method to order application start/stop scripts.

考题 During Company.com planning session,Company.com presents the details of the current  Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required.  Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()A、 4B、 5C、 6D、 8

考题 During Company.com planning session, the network administrator discusses the requirements of having a persistent MAC address associated with the IP Service address.  How can this be accomplished using HACMP?()  A、 Enable routed to handle dynamic route creation.B、 Use IPAT via IP aliasing and define the required MAC address.C、 Add the Service IP Label to the /etc/cluster/ping_client_list.D、 Use IPAT via IP replacement and define the required MAC address.

考题 During a planning session, the customer indicates the need to provide high availability between a  Node attached to an IBM TotalStorage Enterprise Storage Server and a remote node attached to a IBM TotalStorage FAStT server with automatic fallover in the event of a disaster.  Which of the following HACMP options will provide this functionality?()  A、 GeoRMB、 HACMP/XD://PPRCC、 HACMP/XD://GPFSD、 HACMP/XD://HAGEO

考题 Company.com is ordering a new p5-570 and planning for the option of using Capacity on  Demand to activate additional resources in the future. Which of the following is a prerequisite to support the addition of CPUs or memory without an outage?()A、Use Micro-PartitioningB、Configure a Virtual I/O ServerC、Configure dynamic logical partitionsD、Activate Advanced POWER Virtualization

考题 During Company.com planning session, the discussion focuses on how the IP connections are  Managed after a cluster node failure. This is critical for the business since their production application is a Lotus Domino solution requiring multiple IP addresses and recovery time is critical.  What type of IPAT implementation would best address these requirements?()  A、 IPAT via IP aliasingB、 IPAT via IP replacementC、 IPAT via IP aliasing using HWATD、 IPAT via IP replacement using HWAT

考题 You work as a network Exchange administrator at Company.com.The Company.com network currently consists of a single Active Directory forest containing a single domain named Company.com.The Company.com organization makes use of Microsoft Exchange Server 2010 as their messaging solution.During the course of the business week you receive instruction from Company.com to ensure that a newly created room mailbox automatically accepts meeting requests.What should you do?()A、You should consider having a managed folder mailbox policy assigned.B、You should consider having the resource booking attendant enabled.C、You should consider having the mailbox permissions modified.D、You should consider having the moderation for the mailbox enabled.

考题 单选题During a planning session, the customer indicates the need to provide high availability between a  Node attached to an IBM TotalStorage Enterprise Storage Server and a remote node attached to a IBM TotalStorage FAStT server with automatic fallover in the event of a disaster.  Which of the following HACMP options will provide this functionality?()A  GeoRMB  HACMP/XD://PPRCC  HACMP/XD://GPFSD  HACMP/XD://HAGEO

考题 单选题During Company.com planning session,Company.com presents the details of the current  Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required.  Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()A  4B  5C  6D  8

考题 单选题The trouble-free life of an engine indicates ().A the period of time during which no trouble occurs to the engineB no trouble will occur to the engine all its lifeC trouble may occur freely to the engineD no matter what you do to the engine, no trouble will occur during this period

考题 单选题A few of()are planning to drive to Beijing during the spring break.A we girlsB us girlsC girls weD girls

考题 单选题You may need to refer back to an issue()was discussed during the meeting at a later date.A thatB whatC whoD where

考题 单选题During a planning session, the customer indicates that they intend to build two independent two- Node clusters (cluster ’A’ and ’B’) that will be provided shared storage form an IBM TotalStorage FAStT900 server. The customer intends to present 2 LUNs to cluster ’A’, and 2 LUNs to cluster ’B’. All hosts will be dual attached via fibre.  What additional hardware or software is necessary to make this a valid configuration?()A  SAN switchesB  Fibre channel Hub(s)C  IBM Storage Manager AgentsD  IBM Subsystem Device Driver

考题 单选题Jane, I’d like to meet, on Tuesday, but if my plane’s delayed I’ll see you at, Friday’s meeting.JohnA John has to postpone his meeting until Friday.B John will be late for his meeting on Tuesday.C John hopes to see Jane on Tuesday.