While installing a new PCI card the administrator touched the motherboard. While powering on the server, a series of beeps were emitted and the server did not POST.  Which of the following could be done to prevent this problem? ()
A

 Use ESD equipment.

B

 Verify correct voltages are being supplied.

C

 Use a system board tester to check for compatibility issues.

D

 Install compatible PCI cards


参考答案

参考解析
解析: 暂无解析
更多 “单选题While installing a new PCI card the administrator touched the motherboard. While powering on the server, a series of beeps were emitted and the server did not POST.  Which of the following could be done to prevent this problem? ()A  Use ESD equipment.B  Verify correct voltages are being supplied.C  Use a system board tester to check for compatibility issues.D  Install compatible PCI cards” 相关考题
考题 The network administrator has just finished installing a new 10/100/1000 switch, but receives reports from the server administrator that servers connected to the new switch seem to be experiencing slow LAN connections. The network administrator checks the port connecting the new switch to the core switch and sees the following information:Which of the following is the MOST likely cause of the slow connections?()A. The servers have not had VLAN tagging enabled on their NICs.B. Speed and duplex have not been set.C. VLAN tagging was not set on the trunk.D. The servers have been connected with CAT5 cable.

考题 When installing a new PCIe network card, when should manufacturer software and drivers beinstalled?() A. Before inserting the PCIe network card in the caseB. After inserting the new PCIe network card in the caseC. They will be automatically loaded after installationD. Load them concurrently with the PCIe network card

考题 While installing a new PCI card the administrator touched the motherboard. While powering on the server, a series of beeps were emitted and the server did not POST.Which of the following could be done to prevent this problem?()A. Use ESD equipment.B. Verify correct voltages are being supplied.C. Use a system board tester to check for compatibility issues.D. Install compatible PCI cards

考题 An administrator receives a contract for a server install at a new building. Which of the followingshould be completed after installing the server?() A. Log the administrator password usedB. Test the air temperatureC. Update the network diagramD. Review the evacuation procedures

考题 An administrator wants to have the flexibility to dynamically move a fibre channel PCI card between given LPARs.For each given LPAR how should they add the PCI card to the LPAR profile?() A.Add the fibre channel card as hared?Add the fibre channel card as ?hared?B.Add the fibre channel card as irtual?Add the fibre channel card as ?irtual?C.Add the fibre channel card as esired?Add the fibre channel card as ?esired?D.Add the fibre channel card as equired?Add the fibre channel card as ?equired?

考题 A technician is trying to install a previous-generation expansion card into their new laptop.However, the card refuses to fit into the expansion slot. Which of the following is MOST likely the reason?()A、The card needs to have the compatibility jumpers set before it can be installed into the system.B、The card is a PCI Express card and the laptop supports pcmica.C、The expansion slot needs to be enabled in theblos first.D、The card is a PCMCIA card and the laptop supports PCI Express cards.

考题 An administrator just installed a new RAID controller card into a server. The firmware is current for the controller card. When the server is powered up the administrator notices that the RAID controller card is not recognized during POST. Which of the following is the cause of the problem?()A、The hard drives were not plugged into the server correctly.B、The controller driver is outdated and needs to be updated from the OEMs website.C、The firmware for the server is too old and does not support the new RAID controller card.D、The cable from the controller to the hard drive backplane is not connected.

考题 A technician is installing a parallel PCI card. Which of the following is the IEEE standard for parallel?()A、802.11bB、1284C、1394D、802.11g

考题 When installing a new Plug and Play sound card, a technician should turn off and unplug the computer; remove the computer’s cover; locate the sound card slot, insert and secure the card in the slot and:()A、plug in and turn on the computer; let Windows recognize the new hardware and install the driver.B、plug in the computer; let Windows recognize the new hardware and plug in the speakers.C、let Windows recognize the new hardware; install the driver and plug in the speakers.D、turn on and plug in the computer; let Windows recognize the new hardware and install the driver.

考题 An administrator receives a contract for a server install at a new building. Which of the followingshould be completed after installing the server?()A、Log the administrator password usedB、Test the air temperatureC、Update the network diagramD、Review the evacuation procedures

考题 A technician installed a new video card on a motherboard which has onboard video. When the monitor was plugged into the new card and the power was turned on, a no signal message appeared on the monitor. Which of the following is MOST likely the issue?()A、In the BIOS, the onboard video adapter must be disabled.B、The video resolution is set too high.C、The LCD panel is defective.D、The drivers for the new video card must be installed before installing the card.

考题 When installing a new PCIe network card, when should manufacturer software and drivers beinstalled?()A、Before inserting the PCIe network card in the caseB、After inserting the new PCIe network card in the caseC、They will be automatically loaded after installationD、Load them concurrently with the PCIe network card

考题 Which of the following should an administrator utilize FIRST after installing a new HBA?()A、 New Technology File Systems (NTFS)B、 Digitally signed device driversC、 Virtual machine componentsD、 Multiple RAID configurations

考题 While installing a new PCI card the administrator touched the motherboard. While powering on the server, a series of beeps were emitted and the server did not POST.  Which of the following could be done to prevent this problem? ()A、 Use ESD equipment.B、 Verify correct voltages are being supplied.C、 Use a system board tester to check for compatibility issues.D、 Install compatible PCI cards

考题 A system administrator decides to review the system error log after installing new hardware. Which of the following is the correct command to use?()A、errptB、syslogC、prtdiagD、errlogger

考题 An administrator wants to have the flexibility to dynamically move a fibre channel PCI card between given LPARs. For each given LPAR how should they add the PCI card to the LPAR profile?()A、Add the fibre channel card as hared?Add the fibre channel card as ?hared?B、Add the fibre channel card as irtual?Add the fibre channel card as ?irtual?C、Add the fibre channel card as esired?Add the fibre channel card as ?esired?D、Add the fibre channel card as equired?Add the fibre channel card as ?equired?

考题 A customer is installing a new xSeries server into a Token-Ring environment.  Where would the customer find the latest supported Token-Ring PCI adaptors for that server?()A、IBM ServerProven hardware websiteB、IEEE Proven websiteC、IBM PartnerWorld websiteD、3Com Support website

考题 You are the administrator of a small server based network. While installing Windows 2000 Professional on your computer, you configure the network adapter card for each computer to use TCP/IP and assign static IP setting information. During installation the setup detects and installs the 10/100 MBPS UTP only network adepter card on computers 6  8 and 10 MBPS/UTP combination adapter card on the other 7 computers. You accept the default settings for the network adapter card and finish installing the network adapter card. All computers are connected to 10/100 switch that has category 5 UTP cabling. After installation you find that computer 6 and 8 can communicate with each other. You want all 9 computers on your network to be able to communicate with each other.   What should you do?()A、Configure the 10/100 switch to transfer only at the 100 MBPS rate.B、Configure 10/100 MBPS network adapter card to switch all the computers at 10 MBPS rate.C、Change the combination network adapter card to use the BNC transceiver setting.D、Change the combination network adapter card to use the UTP transceiver setting.

考题 单选题A technician installed a new video card on a motherboard which has onboard video. When the monitor was plugged into the new card and the power was turned on, a no signal message appeared on the monitor. Which of the following is MOST likely the issue?()A In the BIOS, the onboard video adapter must be disabled.B The video resolution is set too high.C The LCD panel is defective.D The drivers for the new video card must be installed before installing the card.

考题 单选题Before installing an operating system on a server, which of the following is the BEST resource for an administrator to review the compatibility of the OS with the video card?()A Server manualB Manufacturer websiteC IEEE standardsD HCL

考题 单选题You are the administrator of Company’s network. You have disabled the integrated sound card on your Windows 2000 Professional computer by removing a hardware jumper and install a new PCI sound card. You restart the computer but the sound card does not function correctly. You use Device Manager to view the hardware settings on the computer as shown in the Device Manager window. (Click the Exhibit button.) You want the PCI sound card to function properly. What should you do? ()A Use System in Control Panel to uninstall the integrated sound card.B Use Device Manager to change the IRQ for the new sound card to a different setting from the disabled integrated sound card.C Move the sound card to a different PCI slot.D Uninstall the integrated sound card and disable Plug and Play detection for the new device. E Use Device Manager to update the drivers for the new soundcard.

考题 单选题Which of the following should an administrator utilize FIRST after installing a new HBA?()A  New Technology File Systems (NTFS)B  Digitally signed device driversC  Virtual machine componentsD  Multiple RAID configurations

考题 单选题When installing a new PCIe network card, when should manufacturer software and drivers beinstalled?()A Before inserting the PCIe network card in the caseB After inserting the new PCIe network card in the caseC They will be automatically loaded after installationD Load them concurrently with the PCIe network card

考题 单选题Which of the following should an administrator utilize FIRST after installing a new HBA?()A New Technology File Systems (NTFS)B Digitally signed device driversC Virtual machine componentsD Multiple RAID configurations

考题 单选题After installing a new video card, the computer loads Windows and continuously reboots. Which of the following would be the FIRST step that a technician should take?()A Run CHKDSKB Boot to ERDC Run MSCONFIGD Go into Safe Mode

考题 单选题A technician is trying to install a previous-generation expansion card into their new laptop.However, the card refuses to fit into the expansion slot. Which of the following is MOST likely the reason?()A The card needs to have the compatibility jumpers set before it can be installed into the system.B The card is a PCI Express card and the laptop supports pcmica.C The expansion slot needs to be enabled in theblos first.D The card is a PCMCIA card and the laptop supports PCI Express cards.

考题 单选题An administrator just installed a new RAID controller card into a server. The firmware is current for the controller card. When the server is powered up the administrator notices that the RAID controller card is not recognized during POST. Which of the following is the cause of the problem?()A The hard drives were not plugged into the server correctly.B The controller driver is outdated and needs to be updated from the OEMs website.C The firmware for the server is too old and does not support the new RAID controller card.D The cable from the controller to the hard drive backplane is not connected.