网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Company.com is running a p5-550 system with inactive processors. The system is managed using the Integrated Virtualization Manager. How would the system administrator activate two additional processors?()
A
Use the Advanced Systems Management Interface to enter the Capacity on Demand Enablement code.
B
Use the Web-based System Manager Interface to enter the Capacity on Demand enablement code.
C
Use smitty or smit interface to enter the Capacity on Demand enablement code.
D
Use oem_setup_env on the Virtual I/O Server to enter the Capacity on Demand enablement code.
参考答案
参考解析
解析:
暂无解析
更多 “单选题Company.com is running a p5-550 system with inactive processors. The system is managed using the Integrated Virtualization Manager. How would the system administrator activate two additional processors?()A Use the Advanced Systems Management Interface to enter the Capacity on Demand Enablement code.B Use the Web-based System Manager Interface to enter the Capacity on Demand enablement code.C Use smitty or smit interface to enter the Capacity on Demand enablement code.D Use oem_setup_env on the Virtual I/O Server to enter the Capacity on Demand enablement code.” 相关考题
考题
Of the items listed below, which one(s) should be saved into the process control block?Ⅰ.Process name and process numberⅡ.Process running informationⅢ.Current opened file informationA.Ⅰ and ⅡB.Ⅰ and ⅢC.Ⅱ and ⅢD.Ⅰ、Ⅱ and Ⅲ
考题
Your database interface is running. A user SCOTT starts a SQL *Plus session, and issues the following query:SQL SELECT * FROM sales;Which process would retrieve the result from the database and return it to the client program?()A. User processB. Server processC. System Monitor (SMON)D. Process Monitor (PMON)E. Checkpoint process (CKPT)
考题
User programs interact with the kernel through a set of standard(71). They request services to be provided by the kernel. Such services would include accessing a file: open close, read, write, link, or execute a file; starting or(72)accounting records; changing ownership of a file or(73); changing to a new directory; creating,(74), or killing a process; enabling access to hardware devices; and setting limits on system resources. Unix is a multi -user, multi -tasking operating system. You can have many users logged into a system simultaneously, each running many programs. It's the kernel's job to keep each process and user separate and to regulate access to(75), including cpu, memory, disk and other L/O devices.A.system commandsB.system transferC.system callsD.system rings
考题
All of the following statements accurately describe process for administering file systems EXCEPT:()
A.A logical volume must exist prior to running the crfs command to create a file systemB.A file system must be unmounted before it can be removedC.Defining a file system imposes a structure on a logical volumeD.Removing a file system using rmfs automatically removes the underling logical volume
考题
Process-level redundancy is implemented by a system manager process that creates the standby process.What two functions are provided by the system-level process called Qnet Symlink Manager (QSM)?()A、backing up the information for the broken connectionsB、provides common information for connecting processes and servicesC、detection of a failed connectionD、provides an abstract name for a process or serviceE、distribution of symbolic link information
考题
Which three statements correctly describe the features of the I/O calibration process?()A、Only one I/O calibration process can run at a time.B、It automates the resource allocation for the Automated Maintenance Tasks.C、It improves the performance of the performance-critical sessions while running.D、It can be used to estimate the maximum number of I/Os and maximum latency time for the system.E、The latency time is computed only when the TIMED_STATISTICS initialization parameter is set to TRUE.
考题
An administrator logs into a server and notices slow performance.While troubleshooting the problem the administrator notices that an unfamiliar process in the Task Manager is running at 100% CPU usage.The administrator tries to end the task and receives ‘Access is denied’. Which of the following steps would allow the administrator to terminate that process?()A、Adding the ‘Run as a service’ permission to their account.B、Running the kill utility.C、Adding their account to the remote users group.D、Ending the services.exe process then ending the runaway process.
考题
Company.com complains that an outage is required when adding a new filesystem to cluster. The System management function of HACMP (C-SPOC) functions in which manner when adding filesystems to a cluster?() A、 Adds to all nodes with the cluster running.B、 Adds to all nodes with the cluster stopped.C、 Adds with the cluster running,uses "Lazy Update" to perform the logical volume synchronization.D、 Adds to all nodes with the cluster running but requires the volume groups to be exported andimported after.
考题
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()A、A p650 running AIX v5.3B、A p5-550 running AIX v5.3C、A p5-570 running Advanced POWER VirtualizationD、Multiple rack-mounted p615s running dynamic LPAR
考题
Which command is used by the system boot process to determine what resources are available to the system?()A、diagB、lscfgC、mpcfgD、cfgmgr
考题
Company.com is running a p5-550 system with inactive processors. The system is managed using the Integrated Virtualization Manager. How would the system administrator activate two additional processors?()A、Use the Advanced Systems Management Interface to enter the Capacity on Demand Enablement code.B、Use the Web-based System Manager Interface to enter the Capacity on Demand enablement code.C、Use smitty or smit interface to enter the Capacity on Demand enablement code.D、Use oem_setup_env on the Virtual I/O Server to enter the Capacity on Demand enablement code.
考题
All of the following statements accurately describe process for administering file systems EXCEPT:()A、A logical volume must exist prior to running the crfs command to create a file systemB、A file system must be unmounted before it can be removedC、Defining a file system imposes a structure on a logical volumeD、Removing a file system using rmfs automatically removes the underling logical volume
考题
When an operator is trying to log off the system displays this message: you have running jobs?? What does this mean?()A、One or more processes are running in the background, preventing log off.B、One or more processes are paused, requiring operator input prior to logging off.C、At least one process is running in the background and it will keep running after the operator logs offD、At least one process is running in the background using nohup and it will terminate when the operator logs off
考题
A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()A、In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.B、In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.C、In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.D、In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.
考题
Your production database is running in the ARCHIVELOG mode and the ARCn process is functional. You have two online redo log groups. Which three background processes would be involved when a log switch happens? ()A、archivalB、log writerC、database writerD、system monitorE、process monitorF、change tracking writer
考题
Your database interface is running. A user SCOTT starts a SQL *Plus session, and issues the following query: SQL SELECT * FROM sales; Which process would retrieve the result from the database and return it to the client program?()A、User processB、Server processC、System Monitor (SMON)D、Process Monitor (PMON)E、Checkpoint process (CKPT)
考题
Company.com moved their application start routines from the inittab and place them under HACMP control. During testing,the applications did not always start as desired. What is the best practice for the application start routines.() A、 Assume the system was stopped by a failure.B、 Ensure the hostname parameters is set correctly.C、 Assume the system was stopped by a graceful shutdown.D、 Mount all volumes and file systems before running the application.
考题
Company.com needs to add a new file system to an existing volume group that is being made Highly available by HACMP? What is the best procedure that minimizes down time of the applications?() A、 Use C-SPOC to add the file system while the cluster is running.B、 Add the file system,and them perform the exportvg and importvg on the required nodes.C、 Stop the cluster,add the new file system, and synchronize the cluster then restart HACMP.D、 Break the reservation locks on the disk drives while the cluster is active and add the file system.
考题
单选题All of the following statements accurately describe process for administering file systems EXCEPT:()A
A logical volume must exist prior to running the crfs command to create a file systemB
A file system must be unmounted before it can be removedC
Defining a file system imposes a structure on a logical volumeD
Removing a file system using rmfs automatically removes the underling logical volume
考题
单选题A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()A
A p650 running AIX v5.3B
A p5-550 running AIX v5.3C
A p5-570 running Advanced POWER VirtualizationD
Multiple rack-mounted p615s running dynamic LPAR
考题
单选题A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()A
In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.B
In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.C
In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.D
In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.
考题
单选题Your database interface is running. A user SCOTT starts a SQL *Plus session, and issues the following query: SQL SELECT * FROM sales; Which process would retrieve the result from the database and return it to the client program?()A
User processB
Server processC
System Monitor (SMON)D
Process Monitor (PMON)E
Checkpoint process (CKPT)
考题
单选题What is an advantage of multiple software process running in the Junos OS?()A
Each process has its own protected memory spaceB
Each process is started manually by the user at bootC
Aall processes are dependent on each otherD
Multiple processes allow each routing protocol to be independent
考题
多选题Process-level redundancy is implemented by a system manager process that creates the standby process.What two functions are provided by the system-level process called Qnet Symlink Manager (QSM)?()Abacking up the information for the broken connectionsBprovides common information for connecting processes and servicesCdetection of a failed connectionDprovides an abstract name for a process or serviceEdistribution of symbolic link information
考题
单选题Company.com needs to add a new file system to an existing volume group that is being made Highly available by HACMP? What is the best procedure that minimizes down time of the applications?()A
Use C-SPOC to add the file system while the cluster is running.B
Add the file system,and them perform the exportvg and importvg on the required nodes.C
Stop the cluster,add the new file system, and synchronize the cluster then restart HACMP.D
Break the reservation locks on the disk drives while the cluster is active and add the file system.
考题
单选题Company.com moved their application start routines from the inittab and place them under HACMP control. During testing,the applications did not always start as desired. What is the best practice for the application start routines.()A
Assume the system was stopped by a failure.B
Ensure the hostname parameters is set correctly.C
Assume the system was stopped by a graceful shutdown.D
Mount all volumes and file systems before running the application.
考题
单选题Company.com has a large network control center with an SNMP based monitoring tool running on a non-IBM Unix like system. It has become desirable for the network control center to monitor the activity of an HACMP cluster. What feature in HACMP can assist with this?()A
hacmp.myB
hacmp.mibC
hacmp.defsD
hacmp.snmp
热门标签
最新试卷