网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Containers are loaded and discharged by ()(龙门吊).
A

ship’s derricks

B

fork trucks

C

gantry cranes

D

shore cranes


参考答案

参考解析
解析: 暂无解析
更多 “单选题Containers are loaded and discharged by ()(龙门吊).A ship’s derricksB fork trucksC gantry cranesD shore cranes” 相关考题
考题 The adoption of containers facilitated()to a great extent. A、to load and unloadB、the loading and unloadingC、us to load and unloadD、to have loaded and unloaded

考题 It has been decided that to be lawful merchandise, goods loaded under the charter-party must not only be such as can be loaded without breach of the law in force at the port of loading, but must also be such as can lawfully be carried and discharged at the ________ .A.port of dischargeB.port of sailingC.port of flagD.port of departure

考题 The primary objective of a Ro-Ro vessel is to ______.A.transfer containers without chassisB.load the vessel with palletized cargoC.transport vehiclesD.be loaded full and down to her marks

考题 When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to ______.A.remove an existing list that would slow down cargo operationsB.initiate loading in conjunction with unloading at the hatchC.improve stability during cargo operationsD.allow longshoremen easy access to the hatch

考题 The oil residues which cannot be discharged into the sea in compliance with MARPOL 73/78 shall be ______.A.discharged to into special areaB.discharged into national watersC.discharged into the designated zoneD.retained on board or discharged to reception facilities

考题 ______ covers the period from the time when the goods are loaded on to the time they are discharged from the ship.A.Carriage of goodsB.Taking cargo on boardC.Care for cargoD.Taking delivery of

考题 That THE CARGO SHALL BE LOADED AND DISCHARGED WITHIN THE NUMBER OF TOTAL RUNNING HOURS AS INDICATED,WEATHER PERMITTING,SUNDAYS AND HOLIDAYS EXCEPTED,UNLESS USED,IN WHICH EVENT TIME ACTUALLY USED SHALL COUNT is referred to as ______.A.separate laytime for loading and dischargingB.total laytime for loading and dischargingC.commencement of laytimeD.laytime commencement of loading and discharging

考题 The container is loaded and discharged by gantry cranes.()A、集装箱由龙门吊装卸。B、集装箱由重吊装卸。C、集装箱由船吊装卸。D、集装箱有岸吊装卸。

考题 The jumbo boom can lift heavy cargo, the gantry crane can hoist containers.()A、重吊杆吊重货和集装箱货。B、龙门吊能起吊重件货,重吊杆能起吊集装箱。C、重吊杆能起吊重件货,龙门吊能起吊集装箱。D、龙门吊吊重货和集装箱货。

考题 Liquid bulk cargo is loaded and discharged by pumps.()A、液体散货是由泵装卸的B、干散货是由吊杆装卸的C、液体散货是由吊杆装卸的D、干散货是由泵装卸的

考题 The()(非包装货) is loaded and discharged by belt conveyer.A、non-packed cargoB、packed cargoC、cased cargoD、inboard cargo

考题 集装箱是由龙门吊装卸。()A、Containers are loaded and discharged by gantry cranes.B、Cases are loaded and discharged by gantry cranes.C、Cases are loaded and discharged by heavy derricks.D、Containers are loaded and discharged by heavy derricks.

考题 Containers are loaded and discharged by ()(龙门吊).A、ship’s derricksB、fork trucksC、gantry cranesD、shore cranes

考题 单选题When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().A remove an existing list that would slow down cargo operationsB initiate loading in conjunction with unloading at the hatchC improve stability during cargo operationsD allow longshoremen easy access to the hatch

考题 单选题The jumbo boom can lift heavy cargo, the gantry crane can hoist containers.()A 重吊杆吊重货和集装箱货。B 龙门吊能起吊重件货,重吊杆能起吊集装箱。C 重吊杆能起吊重件货,龙门吊能起吊集装箱。D 龙门吊吊重货和集装箱货。

考题 单选题集装箱是由龙门吊装卸。()A Containers are loaded and discharged by gantry cranes.B Cases are loaded and discharged by gantry cranes.C Cases are loaded and discharged by heavy derricks.D Containers are loaded and discharged by heavy derricks.

考题 单选题The container is loaded and discharged by gantry cranes.()A 集装箱由龙门吊装卸。B 集装箱由重吊装卸。C 集装箱由船吊装卸。D 集装箱有岸吊装卸。

考题 单选题液体散货用泵装卸的。()A Liquid cargo is loaded and discharged by pumps.B Liquid cargo is loaded and discharged by tubes.C Liquid bulk cargo is loaded and discharged by tubes.D Liquid bulk cargo is loaded and discharged by pumps.

考题 单选题Liquid bulk cargo is loaded and discharged by ()(泵).A pipesB tubesC bucketsD pumps

考题 单选题Liquid bulk cargo is loaded and discharged by pumps.()A 液体散货是由泵装卸的B 干散货是由吊杆装卸的C 液体散货是由吊杆装卸的D 干散货是由泵装卸的

考题 单选题()cargo means to check all cargo loaded into or discharged from a vessel.A TallyingB ExaminingC WeighingD Handling

考题 单选题The primary objective of a Ro-Ro vessel is to().A transfer containers without chassisB load the vessel with palletized cargoC transport vehiclesD be loaded full and down to her marks

考题 单选题货物的净重量(Net_Weight,N.W.)一般系指()A 总重量除去第一层包装的重量B 总重量除去所有包装的重量C 卸船重量(Discharged_Weight)D 装船重量(Loaded_Weight)

考题 单选题All these containers will be loaded()deck.A inB upC aboveD on

考题 单选题The()(非包装货) is loaded and discharged by belt conveyer.A non-packed cargoB packed cargoC cased cargoD inboard cargo

考题 单选题Containers are loaded and discharged by().A heavy derrickB special cranesC fork trucksD winch

考题 单选题()the general cargo is to be loaded in No.1 tweendeck both wings,where to put the containers?A WhetherB SupposeC In caseD How about

考题 单选题There should be at least two tiers of dunnage for the cargo loaded on tank top,the first tier laid().A to prevent crushing of cargoB to separate cargoesC to prevent small containers from hanging up on the upper edgesD to offer the drainage