网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Preliminary estimation puts the figure at around $110 billion,()the $160 billion the President is struggling to get through the Congress.
A
in proportion to
B
in reply to
C
in relation to
D
in contrast to
参考答案
参考解析
解析:
暂无解析
更多 “单选题Preliminary estimation puts the figure at around $110 billion,()the $160 billion the President is struggling to get through the Congress.A in proportion toB in reply toC in relation toD in contrast to” 相关考题
考题
110 What is the purpose of the Project Plan?A. To document the Preliminary estimates.B. To document the Definitive estimates.C. To document the Budgetary estimates.D. To document Parametric estimates.E. To document Order of Magnitude estimates
考题
110 Using the figure in the Special window, The critical path is:A. A-B-GB. C-GC. C-DD. E-FE. A-B-G and C-D
考题
下列语句中,在字符串s1和s2相等时显示"they are Equal"的是( )。A.if(*s1==*s2) puts("they are Equal");B.if(!strcmp(s1,s2)) puts("they are Equal");C.if(s1==s2) Puts("they are Equal");D.if(strcmp(s1,s2) ) puts("they are Equal");
考题
These MOOCs make it possible for people()their learning any place around the world.A. to figure outB. to carry outC. work out
考题
若有定义语句:“char*s1=”0K”,*s2=”ok”;”,以下选项中,能够输出“OK”的语句是( )。A.if(strcmp(sl,s2)= =0)puts(s1);B.if(strcmp(sl,s2)!=0)puts(s2);C.if(strcmp(sl,s2)= =l)puts(s1);D.if(stremp(sl,s2)!=0)puts(s1);
考题
● Which statement about the preliminary design stage of a software development project is true? (75) .(75)A.The preliminary design is an internal document used only by programmersB.The preliminary design is the result of mapping product requirements info software and hardware functionsC.The preliminary design of the product comes from the requirement specificationD.The developers produce the preliminary design by defining the software structure in enough detail to permit coding
考题
下述语句中,在字符串s1和s2相等时显示"they are Equal"的是( )。A.if(*s1=*s2) puts("they are Equal");B.if(!strcmp(s1,s2)) puts("they are Equal");C.if(s1==s2) puts("they are Equal");D.if(strcmp(s1,s2)) puts("they are Equal");
考题
When paying out nylon line from around the bitts ______.A.stand clear of the bitts and use two or more round turns under your figure eightsB.you can surge the line even with a single turnC.no extra turns are necessary since nylon has a high coefficient of frictionD.stand in the bight of the line
考题
A fairly accurate estimation of a ship’s position can be calculated by a technique know as ___.A.dead reckoningB.pilotageC.great circle sailingD.geographic navigation
考题
The importer will submit references if these () given in the preliminary negotiations.Aare notBhad not beenChas not beenDwere not
考题
有字符数组a[80]和b[80],则正确的输出语句是()A、puts(a,b)B、puts(a);puts(b)C、printf("%s,%s",a[],b[]);D、putchar(a,b)
考题
下列是抽象类的声明的是()A、 abstract class figure{ }B、 class abstract figure{ }C、 seald class figure{ }D、 static class figure{ }
考题
单选题The best method to secure a tow line to a cleat is to().A
take a turn around the cleat,then figure-eights,and a half-hitchB
make figure-eights,followed by a half-hitch,then a figure-eight knotC
take a turn,a half turn,and a figure-eightD
take several turns around the cleat only
考题
单选题Which method should be used to secure a manila line to bitts().A
A round turn on the bitt farthest from the strain and then figure eightsB
A round turn on the bitt closest to the strain and then figure eightsC
Figure eights and then a round turn at the top of both bittsD
Only figure eights are necessary on both bitts
考题
单选题A fairly accurate estimation of a ship’s position can be calculated by a technique known as().A
dead reckoningB
pilotageC
great circle sailingD
geographic navigation
考题
单选题When paying out nylon line from around the bitts().A
stand clear of the bitts and use two or more round turns under your figure eightsB
you can surge the line even with a single turnC
no extra turns are necessary since nylon has a high coefficient of frictionD
stand in the bight of the line
考题
单选题下列是抽象类的声明的是()A
abstract class figure{ }B
class abstract figure{ }C
seald class figure{ }D
static class figure{ }
考题
单选题The best method to secure a towline to bitts is to().A
take a round turn on the bitt farthest from the pull and use figure-eightsB
take a round turn on the bitt closest to the pull and use figure-eightsC
use figure-eights and take a round turn at the top of the bittsD
use only figure-eights
考题
名词解释题先决问题(preliminary question)
热门标签
最新试卷