网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()
A
Support for10Gb internal network
B
Support for SSD
C
Support for integrated disk drives
D
Support for8Gb FC Switch Modules
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()A Support for10Gb internal networkB Support for SSDC Support for integrated disk drivesD Support for8Gb FC Switch Modules” 相关考题
考题
A network administrator has installed an N7K-F248-25XP module into an existing chassis. The module is powered on, but the interfaces are all in VDC0. What is the reason for this?() A、 The chassis needs an EPLD upgrade to support the new module type.B、 The default VDC cannot support F2 modules.C、 The interfaces must be allocated into a VDC for F2 modules only.D、 The module has failed GOLD diagnostics, and the switch has isolated the ports to protect the integrity of the system.
考题
Which implement phase service component consists of explaining the benefits and limitations of purchased support options to a customer and ensuring that the customer understands operational processes and responsibilities? Select exactly 1 answer(s) from the following:()。A、Staging and System MigrationB、Post Implementation Support Handoff MeetingC、Detailed Design DevelopmentD、Staff Training
考题
A customer is involved in an IBM critical situation (CritSit). The customer recently installed iDATAPIex. The business partner has been assessed a significant penalty by IBM. Which of the following is the reason for this action by IBM?()A、The business partner was required to perform a TDA and failed to do soB、The business partner recommended a nonworking configurationC、The business partner did not support the customer correctlyD、The business partner failed to sell Remote Technical Support (RTS)
考题
A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()A、32UB、21UC、25UD、22U
考题
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()A、Youcan not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet SwitchB、Using blade servers with the NPIV switch will require morefibre ports on the external fibre switchC、Storage devices likeFibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch.D、The NPIV switch will count against the number of domains in a fabric
考题
A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports of an HS22 blade server can support if the blade does not have any expansion blades attached?()A、8B、6C、4D、2
考题
A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()A、Copper Pass-thru Modules only support 1000Mb line speeds. B、Spanning Tree has been enabled on the Copper Pass-thru Module. C、The customer does not have the latest firmware loaded on the Copper Pass-thru Module. D、The customer is using LS21 Blades
考题
A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports an HS22 blade server can support if the blade does not have any expansion blades attached?()A、8 B、6 C、4 D、2
考题
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()A、You can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch B、Using blade servers with the NPIV switch will require more fibre ports on the external fibre switch C、Storage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switchD、The NPIV switch will count against the number of domains in a fabric
考题
A medical customer wants to deploy around 8TB integrated storage on a BladeCenter.Which of the following should be discussed with this customer?()A、SATA internal disksB、iSCSIC、Solid State StorageD、SAS Internal Disk
考题
A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()A、Support for10Gb internal networkB、Support for SSDC、Support for integrated disk drivesD、Support for8Gb FC Switch Modules
考题
单选题A network administrator has installed an N7K-F248-25XP module into an existing chassis. The module is powered on, but the interfaces are all in VDC0. What is the reason for this?()A
The chassis needs an EPLD upgrade to support the new module type.B
The default VDC cannot support F2 modules.C
The interfaces must be allocated into a VDC for F2 modules only.D
The module has failed GOLD diagnostics, and the switch has isolated the ports to protect the integrity of the system.
考题
单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()A
You can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch B
Using blade servers with the NPIV switch will require more fibre ports on the external fibre switch C
Storage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switchD
The NPIV switch will count against the number of domains in a fabric
考题
单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()A
Youcan not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet SwitchB
Using blade servers with the NPIV switch will require morefibre ports on the external fibre switchC
Storage devices likeFibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch.D
The NPIV switch will count against the number of domains in a fabric
考题
单选题A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()A
32UB
21UC
25UD
22U
考题
单选题Which implement phase service component consists of explaining the benefits and limitations of purchased support options to a customer and ensuring that the customer understands operational processes and responsibilities? Select exactly 1 answer(s) from the following:()。A
Staging and System MigrationB
Post Implementation Support Handoff MeetingC
Detailed Design DevelopmentD
Staff Training
考题
单选题A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports an HS22 blade server can support if the blade does not have any expansion blades attached?()A
8 B
6 C
4 D
2
考题
单选题A small business customer is interesting and requires some shared storage. They expect only 3-4 blades, but wise the storage they require 4 TB RAID 1+0. They also require Flash copy and remote mirroring. Which of the following will be an issue?()A
FlashCopy is not supported on the DS3000B
Remote mirroring is supported on the DS3000C
FlashCopy is supported on the BladeCenter S RAIDed SAS Switch ModulesD
FlashCopy is not supported on BladeCenter S RAIDed SAS Switch Modules
考题
单选题Which of the following services offers scheduled telephone support for complex questions on AIX systems?()A
TechlineB
ConsultlineC
Operational Support Services - Alert for pSeriesD
Operational Support Services - RS/6000 SystemWatch
考题
单选题A medical customer wants to deploy around 8TB integrated storage on a BladeCenter.Which of the following should be discussed with this customer?()A
SATA internal disksB
iSCSIC
Solid State StorageD
SAS Internal Disk
考题
单选题The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()A
SupportlineB
ServiceSuiteC
Software Maintenance Agreement (SWMA)D
Machine Control Program Remote Support Agreement (MCPRSA)
考题
单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()A
Support for10Gb internal networkB
Support for SSDC
Support for integrated disk drivesD
Support for8Gb FC Switch Modules
考题
单选题A prospect is considering a BladeCenter H chassis with the Multi-Switch Interconnect Modules. The number of Ethernet ports is important to them. What is the maximum number of Ethernet ports of an HS22 blade server can support if the blade does not have any expansion blades attached?()A
8B
6C
4D
2
考题
单选题A customer is involved in an IBM critical situation (CritSit). The customer recently installed iDATAPIex. The business partner has been assessed a significant penalty by IBM. Which of the following is the reason for this action by IBM?()A
The business partner was required to perform a TDA and failed to do soB
The business partner recommended a nonworking configurationC
The business partner did not support the customer correctlyD
The business partner failed to sell Remote Technical Support (RTS)
考题
单选题A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()A
32U B
25U C
22U D
21U
考题
单选题A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()A
Copper Pass-thru Modules only support 1000Mb line speeds. B
Spanning Tree has been enabled on the Copper Pass-thru Module. C
The customer does not have the latest firmware loaded on the Copper Pass-thru Module. D
The customer is using LS21 Blades
考题
单选题A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()A
SAN Switch modulesB
BlowersC
Power suppliesD
Battery backup units
考题
单选题An IT director needs to deploy 3 partitions, each using dedicated internal boot disk. Which system will support the customer requirement using the least amount of rack space?()A
Power 770 serversB
Power 750 serversC
Power 755 serversD
Power 720 servers
热门标签
最新试卷