Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()
A
Enable SMT
B
Reduce the weight
C
Renice the process
D
Increase the weight
参考答案
参考解析
解析:
暂无解析
更多 “单选题Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()A Enable SMTB Reduce the weightC Renice the processD Increase the weight” 相关考题
考题
Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()A、When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. B、V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. C、When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions. D、V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.
考题
Companycom has seven days of vmstat data on four p5 590 production LPARs of four processors each. The data shows that all four LPARs have periodic utilizations of 90-95% lasting several minutes in duration. However, the average utilizations of the four LPARs were between 15-30%. The vmstat data shows that the peak utilizations of each LPAR do not occur at the same time. Which of the following should be set up?()A、A shared pool with four capped LPARsB、A shared pool with four uncapped LPARsC、Four dedicated LPARs and use DLPAR to manage resources effectivelyD、The server in SMP mode and use WLM to manage resources effectively
考题
Companycom is converting an application over to a p5 595 server with LPARs and has underestimated the processor requirements. The system has COD processors, but the customer does not know how to size the workload. What course of action would help identify the processor requirement?()A、Activate the Trial COD for the processors and run a test to verify outcomeB、Activate the On/Off COD for the processors and run a test to verify outcomeC、Use rmss to simulate the processor workload and run a test to verify outcomeD、Use rmps to simulate the processor workload and run a test to verify outcome
考题
Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()A、One single port Ethernet adapterB、Four dual port Ethernet adaptersC、Two single port Ethernet adaptersD、Eight single port Ethernet adapters
考题
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB、Use DLPAR to move resources from the test LPAR to training when training is activeC、Install Partition Load Manager to share resources between the test and training environmentsD、Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
考题
Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()A、Create all the partitions as AIX 5.2, each having two dedicated processors.B、Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.C、Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.D、Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.
考题
Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()A、Set up the server in SMP mode and use WLM to manage resources effectivelyB、Set up eight dedicated LPARs and use DLPAR to manage resources effectivelyC、Set up a shared pool with eight capped LPARs including production and test/devD、Set up a shared pool with eight uncapped LPARs with priority weight to Production
考题
Companycom has five LPARs, but only one CD drive. How should the CD drive be shared among all the users without system administrator action?()A、Allocate the CD to the VIO Server and NFS export the CD to the user LPARsB、Allocate the CD to one of the user LPARs and config the VIO Server to NFS import itC、Allocate the CD to the VIO Server and the LPARs will share it as a Virtual SCSI deviceD、Allocate the CD to one of the user LPARs and NFS export it to the remaining user LPARs
考题
Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()A、Enable SMTB、Reduce the weightC、Renice the processD、Increase the weight
考题
Companycom is using shared processor LPARs exclusively, including the Virtual IO Server. The users are complaining about response time. The application LPARs can be heavy processor users. The Virtual IO Server has been measured to be processor constrained. How should the Virtual IO Server's shared processor LPAR be configured?()A、Capped and with a lower shareB、Uncapped and with a lower shareC、Uncapped and with a higher shareD、Capped and with no change in share
考题
Companycom wants to manage multiple partitions for a p5 590 server using Partition Load Manager (PLM). Some of the partitions are dedicated processors and some of them are shared processors. What information about PLM limitations should be expressed to the customer?() A、All of the partitions can be managed in one group mixing dedicated and shared processors. PLM will move resources in the group as setup in the PLM profiles. B、PLM handles memory, dedicated and shared processor partitions. All the partitions in a group must be of the same processor type. PLM moves I/O resources between partitions based on PLM policy files. C、PLM handles memory, dedicated and shared processor partitions. The policy file, once loaded, is static and has no knowledge of workload on the managed partitions. PLM is supported for partitions that are running AIX 5.2 or i5OS. D、All of the partitions in a group must be the same type, either all dedicated processor partitions or shared processor partitions. One PLM Server can manage multiple groups of partitions. PLM does not move resources between groups.
考题
The System Administrator has set up shared processors on three partitions in the p5 590 system. The shared processors have been set to uncapped. The system administrator notices that the logical partition is acting like it is capped. What is the most probable cause?()A、The uncapped weight has been set to 0.B、The uncapped weight has been set to 128.C、The processing unit for that partition was set to .1 processing units. A full processor was assigned.D、The processing unit for that partition was set to 0.50 processing units. A full processor was assigned.
考题
Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()A、Dynamic LPARB、Workload ManagerC、Partition Load ManagerD、Shared Processor Pools
考题
Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()A、Utilize the integrated 10/100/1000 network interfaceB、Implement Virtual Ethernet to enable inter-partition communicationC、Implement shared Ethernet with the Ethernet adapters utilized in the other LPARsD、Implement a Point to Point protocol serial communication between the p5 595 serial ports
考题
单选题Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()A
When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. B
V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. C
When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions. D
V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.
考题
单选题Companycom has seven days of vmstat data on four p5 590 production LPARs of four processors each. The data shows that all four LPARs have periodic utilizations of 90-95% lasting several minutes in duration. However, the average utilizations of the four LPARs were between 15-30%. The vmstat data shows that the peak utilizations of each LPAR do not occur at the same time. Which of the following should be set up?()A
A shared pool with four capped LPARsB
A shared pool with four uncapped LPARsC
Four dedicated LPARs and use DLPAR to manage resources effectivelyD
The server in SMP mode and use WLM to manage resources effectively
考题
单选题The System Administrator has set up shared processors on three partitions in the p5 590 system. The shared processors have been set to uncapped. The system administrator notices that the logical partition is acting like it is capped. What is the most probable cause?()A
The uncapped weight has been set to 0.B
The uncapped weight has been set to 128.C
The processing unit for that partition was set to .1 processing units. A full processor was assigned.D
The processing unit for that partition was set to 0.50 processing units. A full processor was assigned.
考题
单选题Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()A
Utilize the integrated 10/100/1000 network interfaceB
Implement Virtual Ethernet to enable inter-partition communicationC
Implement shared Ethernet with the Ethernet adapters utilized in the other LPARsD
Implement a Point to Point protocol serial communication between the p5 595 serial ports
考题
单选题Companycom is converting an application over to a p5 595 server with LPARs and has underestimated the processor requirements. The system has COD processors, but the customer does not know how to size the workload. What course of action would help identify the processor requirement?()A
Activate the Trial COD for the processors and run a test to verify outcomeB
Activate the On/Off COD for the processors and run a test to verify outcomeC
Use rmss to simulate the processor workload and run a test to verify outcomeD
Use rmps to simulate the processor workload and run a test to verify outcome
考题
单选题Companycom is using shared processor LPARs exclusively, including the Virtual IO Server. The users are complaining about response time. The application LPARs can be heavy processor users. The Virtual IO Server has been measured to be processor constrained. How should the Virtual IO Server's shared processor LPAR be configured?()A
Capped and with a lower shareB
Uncapped and with a lower shareC
Uncapped and with a higher shareD
Capped and with no change in share
考题
单选题Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()A
Set up the server in SMP mode and use WLM to manage resources effectivelyB
Set up eight dedicated LPARs and use DLPAR to manage resources effectivelyC
Set up a shared pool with eight capped LPARs including production and test/devD
Set up a shared pool with eight uncapped LPARs with priority weight to Production
考题
单选题Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()A
Use shared memory and semaphores to transfer the data to the TSM LPARB
Provide gigabit Ethernet adapters in each LPAR and run a crossover cableC
Create a Virtual Ethernet between the production server and the TSM LPARsD
Create a Virtual Ethernet between the TSM server LPAR and the non-production LPARs
考题
单选题Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()A
Create all the partitions as AIX 5.2, each having two dedicated processors.B
Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.C
Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.D
Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.
考题
单选题Companycom wants to manage multiple partitions for a p5 590 server using Partition Load Manager (PLM). Some of the partitions are dedicated processors and some of them are shared processors. What information about PLM limitations should be expressed to the customer?()A
All of the partitions can be managed in one group mixing dedicated and shared processors. PLM will move resources in the group as setup in the PLM profiles. B
PLM handles memory, dedicated and shared processor partitions. All the partitions in a group must be of the same processor type. PLM moves I/O resources between partitions based on PLM policy files. C
PLM handles memory, dedicated and shared processor partitions. The policy file, once loaded, is static and has no knowledge of workload on the managed partitions. PLM is supported for partitions that are running AIX 5.2 or i5OS. D
All of the partitions in a group must be the same type, either all dedicated processor partitions or shared processor partitions. One PLM Server can manage multiple groups of partitions. PLM does not move resources between groups.
考题
单选题Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()A
Dynamic LPARB
Workload ManagerC
Partition Load ManagerD
Shared Processor Pools
考题
单选题Companycom has five LPARs, but only one CD drive. How should the CD drive be shared among all the users without system administrator action?()A
Allocate the CD to the VIO Server and NFS export the CD to the user LPARsB
Allocate the CD to one of the user LPARs and config the VIO Server to NFS import itC
Allocate the CD to the VIO Server and the LPARs will share it as a Virtual SCSI deviceD
Allocate the CD to one of the user LPARs and NFS export it to the remaining user LPARs
考题
单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB
Use DLPAR to move resources from the test LPAR to training when training is activeC
Install Partition Load Manager to share resources between the test and training environmentsD
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs