Industry standard single 1U, 2U or 3U/4U Intel, AMD, or POWER servers respectively require 600 to 1300 Watt power supplies. What size power supplies is used by the IBM BladeCenter H to power up to fourteen servers, media components, and network switch modules? ()
A
1400 Watt
B
3200 Watt
C
2900 Watt
D
2000 Watt
参考答案
参考解析
解析:
暂无解析
更多 “单选题Industry standard single 1U, 2U or 3U/4U Intel, AMD, or POWER servers respectively require 600 to 1300 Watt power supplies. What size power supplies is used by the IBM BladeCenter H to power up to fourteen servers, media components, and network switch modules? ()A 1400 WattB 3200 WattC 2900 WattD 2000 Watt” 相关考题
考题
( 4 )关于计算机配置的描述中,错误的是A )服务器机箱的个数用 1U/2U/3U/ …… /8U 表示B )现在流行的串行接口硬盘是 SATA 硬盘C )独立磁盘冗余阵列简称磁盘阵列D )串行 SCSI 硬盘简称 SAS 硬盘
考题
输血效果评价,红细胞输注粗略评价指标:()。
A、2U红细胞悬液约提升Hb10g/L;3U洗涤红细胞约提升Hb10g/LB、2U红细胞悬液约提升Hb20g/L;3U洗涤红细胞约提升Hb20g/LC、2U红细胞悬液约提升Hb10g/L;3U洗涤红细胞约提升Hb20g/LD、2U红细胞悬液约提升Hb20g/L;3U洗涤红细胞约提升Hb10g
考题
请教:2012年3月全国计算机等级《三级数据库》考前预测试卷(2)第2大题第1小题如何解答?
【题目描述】
对于机架式服务器,通常根据机箱的高度细分为1U/2U/3U/4U/5U/6U/7U/8U等规格,其中1U相当于_mm。
考题
目前CPU有二大生产商Intel和AMD,下列叙述正确的是( )
A. 安装Intel CPU的主板也能安装AMD CPUB. 安装AMD CPU的主板也能安装Intel CPUC. 一块主板既能安装Intel CPU也能安装AMD CPUD. 一块主板要么安装Intel CPU,要么安装AMD CPU
考题
OceanStor V3的哪些控制框支持4控直连(采用Scale-out卡直连、不需要交换机)()。A、2U盘控一体B、3U盘控一体C、4U盘控一体D、3U独立机头E、4U独立机头F、6U独立机头
考题
羽拍椎柄上贴有如2UG3是代表的是前面的U表示羽拍的空拍重量:U—95~100克、2U—90~94克、3U—85~89克、4U—80~84克,一般yonex羽拍的常见重量为2U、3U、4U。Gx表示拍柄的粗细:G1最粗G5最细。
考题
Which processor uses a Slot 1 configuration?()A、AMD DuronB、AMD ThunderbirdC、Intel PentiumD、Intel Pentium II
考题
CIOs and their staff have very little experience architecting or designing solutions to support unknown workloads. As executives focus on compliance issues, more systems must be architected to align with emerging or poorly defined requirements. If the customer prefers an integrated solution physically consolidated in a scalable, single framework that can connect to an enterprise class storage area network, what solution would you recommend?()A、Multiple 1U and 2U servers equipped with FC HBAs to connect to the enterprise SANB、Single 3U/4U servers expandable to 32-way equipped with FC HBAs to connect to the enterprise SANC、BladeCenter, expandable to 14 blades equipped with FC HBAs, and redundant 20-port FC SAN Switch modules to connect to enterprise SAND、IBM 1350 Cluster equipped with FC HBAs to connect to enterprise SAN
考题
糖尿病患儿在无酮症酸中毒情况下,每天胰岛素用量超过多少时,仍不能使高血糖的得到控制,在排除Somogyi现象后可称为胰岛素耐药()A、3U/kgB、4U/kgC、2U/kgD、1U/kgE、5U/kg
考题
Industry standard single 1U, 2U or 3U/4U Intel, AMD, or POWER servers respectively require 600 to 1300 Watt power supplies. What size power supplies is used by the IBM BladeCenter H to power up to fourteen servers, media components, and network switch modules? ()A、1400 WattB、3200 WattC、2900 WattD、2000 Watt
考题
某人想配置一台组装机,用途是游戏,你推荐的CPU、主板的配置是。()A、Intel双核CPU,Intel芯片组主板B、Intel四核CPU,AMD芯片组主板C、AMD四核CPU,Intel芯片组主板D、Intel四核CPU,Intel芯片组主板
考题
All servers on your company’s network run Windows Server 2008 R2. The company is planning to virtualize a memory-intensive server application. You need to recommend CPUs for the virtualization host server. The CPUs must enable memory management enhancements in Microsoft Hyper-V Server 2008 R2. What are two possible CPU recommendations that will achieve this goal?()A、CPUs with AMD Rapid Virtualization Index (AMD RVI)B、CPUs with Intel Extended Page Tables (Intel EPT)C、CPUs with Intel Virtualization Technology (Intel VT)D、CPUs with AMD Virtualization (AMD V)
考题
单选题Industry standard single 1U, 2U or 3U/4U Intel, AMD, or POWER servers respectively require 600 to 1300 Watt power supplies. What size power supplies is used by the IBM BladeCenter H to power up to fourteen servers, media components, and network switch modules? ()A
1400 WattB
3200 WattC
2900 WattD
2000 Watt
考题
多选题All servers on your companys network run Windows Server 2008 R2. The company is planning to virtualize a memory-intensive server application. You need to recommend CPUs for the virtualization host server. The CPUs must enable memory management enhancements in Microsoft Hyper-V Server 2008 R2. What are two possible CPU recommendations that will achieve this goal?()ACPUs with AMD Virtualization (AMD V)BCPUs with AMD Rapid Virtualization Index (AMD RVI)CCPUs with Intel Extended Page Tables (Intel EPT)DCPUs with Intel Virtualization Technology (Intel VT)
考题
单选题CIOs and their staff have very little experience architecting or designing solutions to support unknown workloads. As executives focus on compliance issues, more systems must be architected to align with emerging or poorly defined requirements. If the customer prefers an integrated solution physically consolidated in a scalable, single framework that can connect to an enterprise class storage area network, what solution would you recommend?()A
Multiple 1U and 2U servers equipped with FC HBAs to connect to the enterprise SANB
Single 3U/4U servers expandable to 32-way equipped with FC HBAs to connect to the enterprise SANC
BladeCenter, expandable to 14 blades equipped with FC HBAs, and redundant 20-port FC SAN Switch modules to connect to enterprise SAND
IBM 1350 Cluster equipped with FC HBAs to connect to enterprise SAN
热门标签
最新试卷