网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()
A
Draft and trim
B
Limits of the bending moments
C
Rate of discharging
D
Rate of loading
参考答案
参考解析
解析:
暂无解析
更多 “单选题When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()A Draft and trimB Limits of the bending momentsC Rate of dischargingD Rate of loading” 相关考题
考题
On a voyage charter party when the vessel is in port the charter will specify a definite period of time for loading or discharging of cargo by the Charterer.This time is called ________ .A.DemurrageB.DispatchC.Days of readinessD.Laydays
考题
The term under which the Shipowner is not responsible for loading and discharging,stowage and trimming costs is ________ .A.FOBSTB.FIOSTC.FIOSD.FIO
考题
While discharging a tanker,list can be controlled by ______.A.Shoreside personnelB.Using a center tank near the bow,discharging as necessaryC.Using wing tanks near the longitudinal center,discharging as necessaryD.Using the after peak tank,loading as necessary
考题
When planning the loading or discharging of a VLCC(100,000 DWT+)what is the most important consideration ________.A.Draft and trimB.Limits of the bending momentsC.Rate of dischargingD.Rate of loading
考题
船舶需要装卸货。()A、The ship needs loading.B、The ship needs discharging.C、The ship needs unloading.D、The ship needs loading and discharging.
考题
现在天晴了。我们开始装货吧。()A、It’s raining! Let’s stop discharging .B、It’s clear up! Let’s start discharging .C、It’s clear up! Let’s start loading .D、It’s raining! Let’s stop loading .
考题
翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port
考题
翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime
考题
在船上应当日出时升起国旗。()A、On board national flags should be hoisted when the sun sets.B、On board national flags should be hoisted when the sun rises.C、On board national flags should be lowered when the ship is in port.D、On board national flags should be hoisted flag when loading and discharging
考题
When does the Online Planning Worksheet tool run a validation?()A、When loading and activating a definition file into an inactive clusterB、When exporting a definition to a cluster node or saving a definition fileC、When importing a definition from an active cluster or saving a definition fileD、When loading a definition into an active cluster or synchronizing a definition file
考题
单选题During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().A
150 millimeters of water pressureB
125 millimeters of water pressureC
100 millimeters of water pressureD
75 millimeters of water pressure
考题
单选题When does the Online Planning Worksheet tool run a validation?()A
When loading and activating a definition file into an inactive clusterB
When exporting a definition to a cluster node or saving a definition fileC
When importing a definition from an active cluster or saving a definition fileD
When loading a definition into an active cluster or synchronizing a definition file
考题
单选题A deep draft VLCC (100,000 DWT+) navigating in a narrow channel or canal().A
draws more water than when underway in deep waterB
draws less water with an increase in speedC
requires less power for a given speedD
steers better under full power
考题
单选题在船上应当日出时升起国旗。()A
On board national flags should be hoisted when the sun sets.B
On board national flags should be hoisted when the sun rises.C
On board national flags should be lowered when the ship is in port.D
On board national flags should be hoisted flag when loading and discharging
考题
单选题When planning the loading or discharging of a VLCC (100,000 DWT+) what is the most important consideration?()A
Draft and trimB
Limits of the bending momentsC
Rate of dischargingD
Rate of loading
考题
单选题The ship will be responsible for the cargo loaded or unloaded().A
only when the cargo is within its railB
during the time when loading or ynloading is going onC
after the cargo is checked by tallymenD
as soon as loading or discharging begins
考题
单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.A
in the loading placeB
in the port or dockC
in the loading spotD
in the discharging spot
考题
单选题装卸货之前,打开舱盖。()A
After loading and discharging, hatch covers will be opened.B
After loading and discharging, hatch covers will be closed.C
Before loading and discharging, hatch covers will be opened.D
Before loading and discharging, hatch covers will be closed.
考题
单选题What is NOT a problem area when loading barges on a LASH type vessel? ()A
Frequent stability calculations requiredB
Thorough pre-planning requiredC
Limiting depths alongside berths restrict barge draftsD
Minimum trim and 0°list are required for optimum operations
考题
问答题翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime
考题
问答题翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port
考题
单选题现在天晴了。我们开始装货吧。()A
It’s raining! Let’s stop discharging .B
It’s clear up! Let’s start discharging .C
It’s clear up! Let’s start loading .D
It’s raining! Let’s stop loading .
考题
单选题船舶需要装卸货。()A
The ship needs loading.B
The ship needs discharging.C
The ship needs unloading.D
The ship needs loading and discharging.
考题
单选题When loading or discharging dry mud or cement,crew members should use goggles and().A
facial respirator maskB
ear plugsC
rubberized bootsD
fireman's outfit
考题
单选题When loading or discharging dry mud or cement,crew members should use facial respirator masks and().A
gogglesB
ear plugsC
soft-soled bootsD
fireman's outfit
热门标签
最新试卷