A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()
A

Metro/Global Mirror

B

Metro Mirror

C

Global Copy

D

Global Mirror


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()A Metro/Global MirrorB Metro MirrorC Global CopyD Global Mirror” 相关考题
考题 In order to link data centers, a customer is evaluating the installation of fiber optic cable between buildings that are 400 meters apart. The installation will require multiple patch panels and cables.Which of the following is the most critical factor to consider for this installation?()A. I/O rateB. bandwidthC. signal lossD. Dense Wavelength Division Multiplexing (DWDM)

考题 A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites.Which of the following solutions satisfies the customer‘s recovery time objective?()A. DS8700 systems at each site running Metro MirrorB. DS5300 systems at each site running Metro MirrorC. DS5100 systems at each site running Global MirrorD. XIV systems at each site running synchronous mirroring

考题 A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A.VLANB.zoningC.trunkingD.LUN masking

考题 A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A、VLANB、zoningC、trunkingD、LUN masking

考题 A storage specialist is discussing the customer’s high availability plan and discovers that they areonly 80 kilometers (50 miles) from the intended site. They require 7 x 24 x 365 data availability in aUNIX environment with an RPO of two minutes. They have two DS5300 systems located at bothsites. Which of the following IBM storage functions best meets the customer’s businesscontinuance requirements?()A、HACMPB、Volume copyC、Metro MirrorD、Global Mirror

考题 A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()A、iFCP routerB、FCIP routerC、DWDM and CWDMD、LC multi-mode 50 micron fiber

考题 A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A、A DCE domainB、A Kerberos domainC、A PPP tunnel between the serversD、An IPSEC tunnel between the servers

考题 A customer has just obtained a second data center through the acquisition of a competitor.   The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years.   They have just deployed a high-speed point-to-point circuit between the facilities. The IT Director would like a system that could backup their AIX and Win2K servers and electronically vault the data between sites as part of their Disaster Recovery Plan.   What product should the pSeries technical specialist recommend for this requirement?()A、CSMB、TSMC、NIMD、Sysback

考题 A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()A、Metro/Global MirrorB、Metro MirrorC、Global CopyD、Global Mirror

考题 A mainframe customer with a 2105-800 storage subsystem will be migrating to a new data center.They will be replacing existing servers with newer hardware and the 2105 subsystem with an IBMSystem Storage DS8100. The data centers are 613 kilometers apart. The data migration andproduction cutover must be accomplished with minimal disruption. Which solution best meetsthese requirements?()A、Metro MirrorB、HSMC、SVCD、Global Copy

考题 Due to a recent change in government regulations, Company.com needs to create two  independent but synchronized copies of their data. These copies must be contained in separate storage device a minimum of 100 km apart. The customer has capacity in two systems that meet the criteria, one with SSA disk and the other is FAStT.  What facility can be used to manage this issue?()A、 Two independent copies of the data can be created and synchronized using the "HACMP/XD://HAGeo"B、 The existing disks can be incorporated a single storage unit using the optional product "HACMP/XD://PPRC"C、 AIX can create a mirrored logical volume across the two systems that would be accessible from either systemD、 AIX can use the multi path IO subsystem to spread the information across the devices and keep the copies separated

考题 A customer requires an infrastructure to support disaster recovery of critical applications between two remote data centers. One data center is in Tokyo and one is in Beijing. The customer’s Recovery Point Objective (RPO) requires a six-hour window for a bandwidth of 100 MB/s and a new storage system for a total of 4 TB of data. They estimate 100 MB of new data produced hourly. What data synchronization method would be recommended to meet the requirements()A、Metro MirrorB、FlashCopyC、Global MirrorD、Snapshot

考题 A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()A、compatibility of copy functionsB、difference in capacities in the two systemsC、cache size discrepancies between the two systemsD、the necessity of using two storage management products

考题 A customer has systems with AIX 6.1 and 5.3 distributed across two data centers located 8km apart. They want to implement high availability with automated application restart and synchronous data replication between the IBM Systems Storage DS8700 systems which are installed in each datacenter. Which solution addresses the customer requirements?()A、Use the Geographic Logical Volume Manager (GLVM) for MetroMirror, and Live Partition Mobility to automate partition migration upon failureB、Use MetroMirror for the AIX volumes and High Availability Disaster Recovery (HADR) to automate partition migration and restart upon failure.C、Use the Geographic Logical Volume Manager (GLVM) for MetroMirror to replicate the data between the two sites and automate application recovery.D、Use MetroMirror for the AIX volumes, and PowerHA SystemMirror Enterprise Edition to automate failover of MetroMirror pairs and automate application recovery.

考题 A recent power outage disrupted customer operations in one of the two campus centers. Thecustomer has already started to develop a strategy for consolidation of the data centers andremote backup at a colocation facility, but current and near-term budgets are focused only oncapacity growth at lowest cost. Which of the following capabilities might be immediately attractiveto the customer?()A、 DS8700 with remote mirroring B、 V7000 with Easy Tier and SSD C、 SVC VDisk mirroring with stretch clusters D、 UPS power backup to the racks with current storage controllers

考题 A customer has two locations located 7 kilometers apart. The production site has a Cisco 9509chassis with 48 Fibre Channel ports activated, and the disaster recovery site has a Cisco 9509chassis with 48 Ethernet ports activated. Which of the following products will be used to get thedata from one location to the other?()A、IBM SAN40-B4B、Cisco MDS 9222iC、Cisco MDS 9148D、IBM SAN32B-E4 with encryption

考题 A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds.  Which solution satisfies the customer’s recovery time objective()A、DS8700 systems at each site running Metro MirrorB、DS8700 systems at each site running Global MirrorC、DS5300 systems at each site running Global MirrorD、XIV systems at each site running Remote Mirroring

考题 A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()A、Global CopyB、Metro MirrorC、Global MirrorD、Metro/Global Mirror

考题 A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()A、DS8700 systems at each site running Metro MirrorB、DS5300 systems at each site running Metro MirrorC、DS5100 systems at each site running Global MirrorD、XIV systems at each site running synchronous mirroring

考题 Your network contains two data centers named Datacenter1 and Datacenter2. An Active Directory site exists for each data center.  The data centers connect to the Internet by using a direct link.  The data centers connect to each other by using a high-speed WAN link.  You plan to deploy Exchange Server 2010 Mailbox servers in both data centers. You need to plan message routing to meet the following requirements:.Ensure outbound delivery of e-mail messages if a single server fails .Automatically load balance the Hub Transport server in each site .Deploy the minimum number of servers What should you include in the plan?()A、In each data center, deploy one Hub Transport server. Create and configure one Send connector.B、In each data center, deploy two Hub Transport servers. Create and configure one Send connector.C、In each data center, deploy one Edge Transport server. Create and configure two Send connectors.D、In each data center, deploy two Edge Transport servers. Create and configure two Send connectors.

考题 单选题Due to a recent change in government regulations, Company.com needs to create two  independent but synchronized copies of their data. These copies must be contained in separate storage device a minimum of 100 km apart. The customer has capacity in two systems that meet the criteria, one with SSA disk and the other is FAStT.  What facility can be used to manage this issue?()A  Two independent copies of the data can be created and synchronized using the HACMP/XD://HAGeoB  The existing disks can be incorporated a single storage unit using the optional product HACMP/XD://PPRCC  AIX can create a mirrored logical volume across the two systems that would be accessible from either systemD  AIX can use the multi path IO subsystem to spread the information across the devices and keep the copies separated

考题 单选题A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A A DCE domainB A Kerberos domainC A PPP tunnel between the serversD An IPSEC tunnel between the servers

考题 单选题In order to link data centers, a customer is evaluating the installation of fiber optic cable between buildings that are 400 meters apart. The installation will require multiple patch panels and cables. Which of the following is the most critical factor to consider for this installation?()A I/O rateB bandwidthC signal lossD Dense Wavelength Division Multiplexing (DWDM)

考题 单选题A customer would like to implement an IBM System Storage DS8000 solution. A Capacity Magic study has determined that 500 drives of 450 GB are required to meet the customer’s capacity requirements. Limited space is available for additional systems in the data center.  Which solution  best meets the customer’s requirements()A DS8800 system with three framesB DS8800 system with one frameC DS8700 system with two framesD DS8800 system with two frames

考题 单选题Your network contains two data centers named Datacenter1 and Datacenter2. An Active Directory site exists for each data center.  The data centers connect to the Internet by using a direct link.  The data centers connect to each other by using a high-speed WAN link.  You plan to deploy Exchange Server 2010 Mailbox servers in both data centers. You need to plan message routing to meet the following requirements:.Ensure outbound delivery of e-mail messages if a single server fails .Automatically load balance the Hub Transport server in each site .Deploy the minimum number of servers What should you include in the plan?()A In each data center, deploy one Hub Transport server. Create and configure one Send connector.B In each data center, deploy two Hub Transport servers. Create and configure one Send connector.C In each data center, deploy one Edge Transport server. Create and configure two Send connectors.D In each data center, deploy two Edge Transport servers. Create and configure two Send connectors.

考题 单选题A recent power outage disrupted customer operations in one of the two campus centers. Thecustomer has already started to develop a strategy for consolidation of the data centers andremote backup at a colocation facility, but current and near-term budgets are focused only oncapacity growth at lowest cost. Which of the following capabilities might be immediately attractiveto the customer?()A  DS8700 with remote mirroring B  V7000 with Easy Tier and SSD C  SVC VDisk mirroring with stretch clusters D  UPS power backup to the racks with current storage controllers

考题 单选题A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup.  Which factor is a primary consideration when proposing a solution for this customer()A compatibility of copy functionsB difference in capacities in the two systemsC cache size discrepancies between the two systemsD the necessity of using two storage management products

考题 单选题A customer has systems with AIX 6.1 and 5.3 distributed across two data centers located 8km apart. They want to implement high availability with automated application restart and synchronous data replication between the IBM Systems Storage DS8700 systems which are installed in each datacenter. Which solution addresses the customer requirements?()A Use the Geographic Logical Volume Manager (GLVM) for MetroMirror, and Live Partition Mobility to automate partition migration upon failureB Use MetroMirror for the AIX volumes and High Availability Disaster Recovery (HADR) to automate partition migration and restart upon failure.C Use the Geographic Logical Volume Manager (GLVM) for MetroMirror to replicate the data between the two sites and automate application recovery.D Use MetroMirror for the AIX volumes, and PowerHA SystemMirror Enterprise Edition to automate failover of MetroMirror pairs and automate application recovery.