注意!2020年内蒙古ACCA考试成绩查询入口开通了

发布时间:2020-10-18


近日,关于9ACCA考试成绩查询时间有关事项的通告公布了,为了方便大家顺利完成成绩查询工作,现将有关内容分享如下,一起跟随51题库考试学习网看看相关内容吧。

20209ACCA考试成绩已公布,考生现在登录ACCA官网即可查询。

ACCA考试成绩查询方式一共有三种,分别是:手机短信通知、邮件通知、在线查询。

(一)手机短信通知

(二)邮件通知

ACCA官方会根据所有考生的预留手机号和注册邮箱地址,通过短信和电子邮件的形式将成绩单发送给各位考生。不过,要实现这一功能,需要学员自行登录My ACCA账户中,设置邮件或短信通知成绩这一选项。

(三)在线查询

1. 进入ACCA官网http://www.accaglobal.com/hk/en.html 点击右上角My ACCA进行登录;

2. 输入账号、密码登录后进入主页面,点击Exam status & Results

3. 跳转页面后选择View your status report

ACCA成绩查询结果显示:

ACCA全球官方网站http://www.accaglobal.com/hk/en.html;点击Myacca登陆,点左面框架里的“EXAMS”进入页面,中间有一段:

EXAM STATUS REPORT Your status report provides details of the ACCA exams you have already passed and those you have still to complete EXAM STATUS REPORT Your status report provides details of the ACCA exams you have already passed and those you have still to complete View your status report——这个是超级链接,点击进入就可以查看学员全部的考试分数记录。

9ACCA考试成绩常见问题:

1ACCA成绩有效期

ACCA 应用知识和技能课程阶段的成绩永久有效,但战略阶段课程成绩仅7年内有效。即:从学员通过战略阶段的第一门科目开始,7年内需完成战略阶段所要求的所有科目,否则从第8年开始第1年所考过的战略阶段科目成绩将会被视为过期作废。

此政策实行滚动式废除,也就是说不会在第8年时把之前7年所有考过的P阶段科目成绩都废除,只会废除第1年考过的战略阶段科目成绩,第9年会废除前2年所通过的战略阶段科目成绩,以此类推。

2、何时申请成绩复议,具体步骤

学员须在考试成绩发布日后的15个工作日内提出复议申请,具体申请的步骤为:

(1):登录进入Myacca

(2):点击“Exam Status and Results”里面有“Administrative Review”

(3):填写和提交表格即可。

一旦成绩有误,那么学员会在下次报考截止日期前收到改正后的考试成绩。

说明:因考试政策、内容不断变化与调整,51题库考试学习网提供的考试信息仅供参考,如有异议,请考生以权威部门公布的内容为准!

以上就是今天51题库考试学习网为大家带来的全部内容,今日查询成绩可能会遇到网络延迟或者缓慢的现象,这种是正常现象,因为今日查询的人数会很多,错开高峰期即可,如需了解更多ACCA考试相关内容,记得关注51题库考试学习网!


下面小编为大家准备了 ACCA考试 的相关考题,供大家学习参考。

(b) The tax relief available in respect of the anticipated trading losses, together with supporting calculations and

a recommended structure for the business. (16 marks)

正确答案:

 

Aral Ltd owned by Banda
The losses would have to be carried forward and deducted from the trading profits of the year ending 30 June 2010.
Aral Ltd cannot offset the loss in the current period or carry it back as it has no other income or gains.
Aral Ltd owned by Flores Ltd
The two companies will form. a group relief group if Flores Ltd owns at least 75% of the ordinary share capital of Aral
Ltd. The trading losses could be surrendered to Flores Ltd in the year ending 30 June 2008 and the year ending
30 June 2009. The total tax saved would be £11,079 ((£38,696 + £19,616) x 19%)
Recommended structure
The Aral business should be established in a company owned by Flores Ltd.
This will maximise the relief available in respect of the trading losses and enable relief to be obtained in the period in
which the losses are incurred.
Tutorial note
The whole of the loss for the period ending 30 June 2008 can be surrendered to Flores Ltd as it is less than that
company’s profit for the corresponding period, i.e. £60,000 (£120,000 x 6/12).


(b) Describe a framework to assess the risks to the progress of the Giant Dam Project. Your answer should

include a diagram to represent the framework. (6 marks)

正确答案:

(b) Framework for assessing risk
Risk is assessed by considering each identified risk in terms of two variables:
– its hazard (or consequences or impact) and,
– its probability of happening (or being realised or ‘crystallising’).
The most material risks are those identified as having high impact/hazard and the highest probability of happening. Risks
with low hazard and low probability will have low priority whilst between these two extremes are situations where judgement
is required on how to manage the risk.
In practice, it is difficult to measure both variables with any degree of certainty and so if is often sufficient to consider each
in terms of relative crude metrics such as ‘high/medium/low’ or even ‘high/low’. The framework can be represented as a ‘map’
of two intersecting continuums with each variable being plotted along a continuum.


(ii) Describe the claim of each of the four identified stakeholders. (4 marks)

正确答案:
(ii) Stakeholder claims
Four external stakeholders in the case and their claims are as follows.
The client, i.e. the government of the East Asian country. This stakeholder wants the project completed to budget and
on time. It may also be concerned to minimise negative publicity in respect of the construction of the dam and the
possible negative environmental consequences.
Stop-the-dam, the vocal and well organised pressure group. This stakeholder wants the project stopped completely,
seemingly and slightly paradoxically, for environmental and social footprint reasons.
First Nation, the indigenous people group currently resident on the land behind the dam that would be flooded after its
construction. This stakeholder also wants the project stopped so they can continue to live on and farm the land.
The banks (identified as a single group). These seem happy to lend to the project and will want it to proceed so they
make a return on their loans commensurate with the risk of the loan. They do not want to be publicly identified as being
associated with the Giant Dam Project.
Shareholders. The shareholders have the right to have their investment in the company managed in such a way as to
maximise the value of their shareholding. The shareholders seek projects providing positive NPVs within the normal
constraints of sound risk management.
Tutorial note: only four stakeholders need to be identified. Marks will be given for up to four relevant stakeholders
only.

(c) Using information from the case, assess THREE risks to the Giant Dam Project. (9 marks)

正确答案:
(c) Assessment of three risks
Disruption and resistance by Stop-the-dam. Stop-the-dam seems very determined to delay and disrupt progress as much as
possible. The impact of its activity can be seen on two levels. It is likely that the tunnelling and other ‘human’ disruption will
cause a short-term delay but the more significant impact is that of exposing the lenders. In terms of probability, the case says
that it ‘would definitely be attempting to resist the Giant Dam Project when it started’ but the probability of exposing the
lenders is a much lower probability event if the syndicate membership is not disclosed.
Impact/hazard: low
Probability/likelihood: high
The risk to progress offered by First Nation can probably be considered to be low impact/hazard but high probability. The case
says that it ‘would be unlikely to disrupt the building of the dam’, meaning low impact/hazard, but that ‘it was highly likely
that they would protest’, meaning a high level of probability that the risk event would occur.
Impact: low
Probability: high
There are financing risks as banks seems to be hesitant when it comes to lending to R&M for the project. Such a risk event,
if realised, would have a high potential for disruption to progress as it may leave R&M with working capital financing
difficulties. The impact would be high because the bank may refuse to grant or extend loans if exposed (subject to existing
contractual terms). It is difficult to estimate the probability. Perhaps there will be a range of attitudes by the lending banks
with some more reticent than others (perhaps making it a ‘medium’ probability event).
Impact: medium to high (depending on the reaction of the bank)
Probability: low to medium (depending on how easy it would be to discover the lender)

声明:本文内容由互联网用户自发贡献自行上传,本网站不拥有所有权,未作人工编辑处理,也不承担相关法律责任。如果您发现有涉嫌版权的内容,欢迎发送邮件至:contact@51tk.com 进行举报,并提供相关证据,工作人员会在5个工作日内联系你,一经查实,本站将立刻删除涉嫌侵权内容。