网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
()are for radiators and pipes and for the ship’s funnel.
- A、Varnishes
- B、Anti-corrosive paints
- C、Heat-resistant paints
- D、Primer
参考答案
更多 “()are for radiators and pipes and for the ship’s funnel.A、VarnishesB、Anti-corrosive paintsC、Heat-resistant paintsD、Primer” 相关考题
考题
For what purpose are the diving pipes used?A. To absorb heat from the sun.B. To store heat for future use.C. To turn solar energy into heat energy.D. To carry heat down below the surface.
考题
From the last paragraph we can learn that __A. some pipes have to be re-arranged in winterB. the system can do more than warming up the buildingC. the exchangers will pick up heat from the street surfaceD. less heat may be collected in winter than in summer
考题
During the PSC inspection, under the provision of SOLAS74, which one may not be regarded as clear grounds for ships' detainment?A.excess amount of oily-water mixtures in bilgesB.insulation of piping including exhaust pipes in engine room contaminated by oilC.improper operation of bilge pumping arrangementsD.paint peeling off the uptake
考题
()(耐热漆) are for radiators and pipes and for the ship’s funnel.A、VarnishB、Anti-corrosive paintsC、Heat-resistant paintsD、Anti-fouling paint
考题
You are preparing for a new installation of SQL Server 2005. You need to select the protocols that client computers might use to connect to the server. Which two protocols can you use to achieve this goal?()A、 Named Pipes B、 TCP/IP C、 Shared Memory D、 Virtual Interface Adapter (VIA) E、 Multiprotocol
考题
单选题()(耐热漆) are for radiators and pipes and for the ship’s funnel.A
VarnishB
Anti-corrosive paintsC
Heat-resistant paintsD
Anti-fouling paint
考题
单选题The lubricating pipes and dusts should be blown out with ().A
atmosphereB
the fresh waterC
compressed airD
chemical compounds
考题
单选题()are for radiators and pipes and for the ship’s funnel.A
VarnishesB
Anti-corrosive paintsC
Heat-resistant paintsD
Primer
考题
单选题All items such as steam pipes, exhaust pipes and fittings which, because of their location and operating temperature, present a hazard should be adequately lagged.That means the items should()A
not be put into operation too earlyB
be pay adequate attention toC
be used only when necessaryD
be coated with certain material
考题
单选题Telescopic pipes to the piston of a large slow-speed main propulsion diesel engine are designed to prevent ().A
excessive crankcase pressureB
excessive lube oil temperatureC
contamination of the lube oil by waterD
contamination of the cooling water by lube oil
考题
单选题One characteristic of a pulse type turbo-charging system is()A
high average exhaust manifoldB
greatly fluctuating inlet manifold pressureC
constant exhaust manifold pressureD
multiple exhaust pipes to the turbocharger
考题
单选题Pipes made of plastic are now widely used in building as they are light and do not become ()in water.A
ripeB
instantC
rottenD
mature
考题
单选题() provide the water to the pistons.A
Pneumatic pipesB
Hydraulic pipesC
Telescopic pipesD
Operating gas pipes
考题
单选题Large pipes or () are fitted between the steam and water drums to ensure good natural circulation of water.A
fire-tubesB
furnacesC
down-comersD
soot-blowers
考题
单选题Exhaust pipes for separate diesel engines can be combined only when ()A
space limitations prevent separately run pipesB
the engines are small auxiliary unitsC
they are arranged to prevent gas backflow to each engineD
a waste heat boiler is installed
考题
单选题Emulsion oils and sodium nitrite are both approved additives, but the latter cannot be used if any pipes are () or if any soldered joints exit.A
chromedB
weldedC
galvanizedD
bolted
考题
单选题Emulsion oils and sodium nitrite are both approved additives, but () cannot be used if any pipes are galvanized or if soldered joints exist.A
the latterB
latterC
formerD
the former
考题
单选题Main steam and exhaust pipes for winches and similar gear shall not pass through crew accommodation nor, whenever technically possible, through alleyways leading to crew accommodation; where they do pass through such alleyways, they shall be adequately ().A
ventilated and taggedB
ventilated and cooled downC
insulated and encasedD
insulated and warmed up
考题
单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()A
failure of the proper operation of the main steering gearB
failure of the proper operation of electrical installationsC
leakage of domestic water pumpD
insulation of exhaust pipes in engine room contaminated by oil
考题
单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()A
excess amount of oily-water mixtures in bilgesB
insulation of piping including exhaust pipes in engine room contaminated by oilC
improper operation of bilge pumping arrangementsD
there were an actual emergency
考题
单选题What should you set the Client Configuration to when configuring the ODBC Data Source for the Database Subsystem?()A
TCP/IP B
Multiprotocol C
Named Pipes D
NWLink IPX/SPX
考题
单选题Large pipes or down-comers are fitted between the steam drum and () to ensure good natural circulation of water.A
fire-tubesB
furnacesC
water drumsD
water wall tubes
考题
单选题It is usual to identify the fluids in pipes by bands of paint at intervals, and the engineer should familiarize himself with the code in use.According to the above sentence, which of the following statements is true?()A
People can know the types of fluids in pipes by feeling with handsB
There are series of rings painted in the pipes to show various fluidsC
Engineers should wear cards standing for ranksD
Engineer knows his own code very well
考题
单选题()is not a step for anchoring preparation.A
To take off the covers from the hawse pipes and clear the spurling pipesB
To make sure that the windlass is out of gear and the brakes are onC
To turn the windlass over slowlyD
To inform the engine room to ensure that deck power and water are off
热门标签
最新试卷