网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

()is fouling.

  • A、Chain
  • B、Cable
  • C、Anchor
  • D、Shackle

参考答案

更多 “()is fouling.A、ChainB、CableC、AnchorD、Shackle” 相关考题
考题 Jim kept the dog()up. A、chainB、chainingC、chainedD、to chain

考题 A) on-digitB) on-cableC) on-lineD) on-data

考题 靠10m水深的泊位时,用于制速拖锚的出链长度一般为______。A.1 shackle左右B.2 shackle左右C.3 shackle左右D.4 shackle左右

考题 The American Petroleum Institute recommends magnetic particle inspection for ______.A.anchor chainB.wire ropeC.connecting linksD.pendant wires

考题 The rescue boat on an OSV is not required to carry a ______.A.fishing kitB.searchlightC.sea anchorD.radar reflector

考题 What is the most important difference between the bow type anchor shackle and the D-type anchor shackle?A.The bow type shackle provides a superior connectionB.The D-type shackle is weaker than the bow typeC.The bow type shackle is weaker than the D-typeD.The D-type shackle provides an inferior connection

考题 A safety shackle is identified by its ______.A.ShapeB.PinC.Certification stampD.Color code

考题 You are preparing to slush a stay on your vessel by lowering yourself down the stay in a bosun's chair.The proper way to do this is to ride down the stay on a riding shackle ______.A.with the pin of the shackle riding on the stayB.with the pin of the shackle through the chair's bridle eyeC.with a hook attaching the chair to the riding shackleD.connected to a second shackle on the chair

考题 The length of chain between the anchor and the end of the pendant line is called the ______.A.Pigtail chainB.Thrash chainC.Crown chainD.Wear chain

考题 In anchoring orders, WALK BACK THE CHAIN means ______.A.pay away the chainB.check up the chainC.take a strain on the chainD.take in the chain

考题 LIFTING THE ANCHOR FROM THE BOTTOM is called ______.A.broaching the anchorB.shifting the anchorC.walking the anchorD.weighing the anchor

考题 Problems ______ if the parents approach to discipline is inconsistent.A.reach B.arise C.anchor D.seize

考题 锚链()A、chainB、wireC、pipeD、steel

考题 In anchoring orders, “Weigh anchor” means “()”.A、Pay away the chainB、Take in the chainC、Check up the chainD、Drop the anchor

考题 The ship has to () out of harbour.A、beB、getC、let go anchorD、anchor

考题 The expression “Drop anchor” means “()”.A、Hold anchorB、Let go anchorC、Weigh anchorD、Anchor aweigh

考题 The ship is to ()to buoys.A、moorB、berthC、anchorD、dock

考题 Two ()in water.A、shacklesB、anchorsC、decksD、shackle

考题 货钩()A、cargo chainB、cargo trayC、cargo hookD、can hook

考题 What is the meaning of integration?()A、To link some separate factors as a whole chainB、UnitedC、To put togetherD、Mixture

考题 Which of the following has the HIGHEST connection latency? ()A、SatelliteB、CableC、DSLD、Dial-up

考题 电缆的专业英语为()。A、ALARMB、CABLEC、BATTERYD、CURRENT

考题 单选题A safety shackle is identified by its().A shapeB pinC certification stampD color code

考题 单选题You are preparing to slush a stay on your vessel by lowering yourself down the stay in a bosun’s chair.The proper way to do this is to ride down the stay on a riding shackle().A with the pin of the shackle riding on the stayB with the pin of the shackle through the chair's bridle eyeC with a hook attaching the chair to the riding shackleD connected to a second shackle on the chair

考题 单选题Weigh anchor and()(留)one shackle in water.A stayB keepC leaveD have

考题 单选题You are preparing to lubricate standing rigging on your vessel.When rigging a bosun’s chair on a stay with a shackle,().A Connect the shackle to the bosun's chair with a hookB Never allow the shackle pin to ride on the stayC Run the gantline through the shackle and then make fast to the bosun's chairD Tie the bitter end of the gantline to the shackle before shackling it to the bosun's chair

考题 单选题()port anchor,one shackle in water.A ThrowB Heave inC Cast offD Let go