网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
In anchoring orders, WALK BACK THE CHAIN means ______.
A.pay away the chain
B.check up the chain
C.take a strain on the chain
D.take in the chain
参考答案
更多 “ In anchoring orders, WALK BACK THE CHAIN means ______.A.pay away the chainB.check up the chainC.take a strain on the chainD.take in the chain ” 相关考题
考题
Which two statements are true about a job chain?()
A. A job chain can contain a nested chain of jobs.B. The jobs in a job chain cannot have more than one dependency.C. A job of the CHAIN type can be run using event-based or time-based schedules.D. The jobs in a job chain can be executed only by using the events generated by the Scheduler
考题
Which of the following must occur when installing SCSI devices into the server?()
A. Terminate the back end of the chain.B. Set the jumper to device ID 0.C. Terminate both ends of the chain.D. Set the jumper to cable select.
考题
A chain stripper is used to ______.A.prevent chain from clinging to the wildcatB.clean the marine debris from the chainC.flake chain from a boat's chain lockerD.clean chain prior to an x-ray inspection
考题
What are the two main types of stud link chain ________.A.Oil Rig chain and Oil Field Stud Link chainB.Flash-butt welded chain and Di-Lok chainC.Flash-butt welded chain and Oil Rig chainD.Oil Field Stud Link chain and Flash-butt welded chain
考题
In anchor orders, “Up and down” means “()”.A、The chain is not uprightB、The chain is uprightC、The chain is slackD、The chain is not slack
考题
Which of the following must occur when installing SCSI devices into the server?()A、 Terminate the back end of the chain.B、 Set the jumper to device ID 0.C、 Terminate both ends of the chain.D、 Set the jumper to cable select.
考题
Which two statements are true about a job chain?()A、 A job chain can contain a nested chain of jobsB、 The jobs in a job chain cannot have more than one dependencyC、 A job of the CHAIN type can be run using event-based or time-based schedulesD、 The jobs in a job chain can be executed only by using the events generated by the Scheduler
考题
单选题In anchor orders, “Up and down” means “()”.A
The chain is not uprightB
The chain is uprightC
The chain is slackD
The chain is not slack
考题
单选题In anchoring orders, up and down means().A
the chain is not uprightB
the chain is tightC
the chain is uprightD
the chain is slack
考题
单选题When anchoring,it is a common rule of thumb to use a length of chain().A
five to seven times the depth of waterB
seven to ten times the depth of waterC
twice the depth of waterD
twice the depth of water plus the range of tide
考题
单选题What are the two main types of stud link chain().A
Oil Rig chain and Oil Field Stud Link chainB
Flash-butt welded chain and Di-Lok chainC
Flash-butt welded chain and Oil Rig chainD
Oil Field Stud Link chain and Flash-butt welded chain
考题
单选题When a deck cargo is secured with chain or wire lashings and grab (pear) links,which statement is FALSE?()A
The amount of take-up is limited by the length of the turnbuckleB
At the grab (pear) link,the slack end of chain should be led back and secured to the chain above the linkC
The lashings should be inspected each day and any slack taken upD
The turnbuckle should be secured with a stick or lock nuts
考题
单选题A sufficient amount of chain must be veered when anchoring a vessel to ensure().A
the vessel has enough room to swing while at anchorB
the anchor flukes bite into the ocean bottomC
there is a sufficient scope of chain to keep the anchor on the bottomD
there is more chain out than there is in the chain locker
考题
单选题A common means of connecting shots of anchor chain in the field is to use a().A
sprocketB
Kenter linkC
swivelD
end shackle
考题
单选题In anchoring orders, “Weigh anchor” means “()”.A
Pay away the chainB
Take in the chainC
Check up the chainD
Drop the anchor
考题
单选题()is used for heaving up and slacking away the anchor and chain.A
A winchB
A windlassC
A deck craneD
A lifeboat engine
考题
单选题When anchoring,good practice requires 5 to 7 fathoms of chain for each fathom of depth. In deep water you should use().A
the same ratioB
more chain for each fathom of depthC
less chain for each fathom of depthD
two anchors with the same ratio of chain
考题
单选题After deploying the anchor,a permanent chain chaser is().A
removed from the anchor chainB
connected to a buoy at the anchorC
stripped back to the rig and securedD
connected to a buoy halfway down the chain
考题
单选题Which of the following must occur when installing SCSI devices into the server?()A
Terminate the back end of the chain.B
Set the jumper to device ID 0.C
Terminate both ends of the chain.D
Set the jumper to cable select.
考题
单选题When anchoring a small sailing vessel in rough weather,the best anchor line would be composed of().A
chain-wireB
chain-manilaC
chain-nylonD
all chain
考题
单选题A chain stripper is used to().A
prevent chain from clinging to the wildcatB
clean the marine debris from the chainC
flake chain from a boat's chain lockerD
clean chain prior to an x-ray inspection
考题
多选题Which two statements are true about a job chain?()AA job chain can contain a nested chain of jobsBThe jobs in a job chain cannot have more than one dependencyCA job of the CHAIN type can be run using event-based or time-based schedulesDThe jobs in a job chain can be executed only by using the events generated by the Scheduler
考题
单选题In anchoring orders, walk back the chain means().A
pay away the chainB
take in the chainC
check up the chainD
take a strain on the chain
考题
单选题A sufficient amount of chain must be veered when anchoring a vessel to ensure().A
the vessel has enough room to swing while at anchorB
the anchor flukes bite into the ocean bottomC
there is sufficient weight from the anchor and chain to prevent draggingD
there is more chain out than there is in the chain locker
考题
单选题What is the best guide for determining the proper scope of anchor chain to use for anchoring in normal conditions?()A
One shot of chain for every ten feet of waterB
One shot of chain for every fifteen feet of waterC
One shot of chain for every thirty feet of waterD
One shot of chain for every ninety feet of water
考题
单选题When anchoring a vessel under normal conditions,which scope of chain is recommended? ()A
Four times the depth of waterB
Two and one-half times the depth of waterC
Five to seven times the depth of waterD
Fifteen times the depth of water
热门标签
最新试卷