网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

All cargo wires need to be ().

  • A、greased
  • B、oiled
  • C、washed
  • D、repaired

参考答案

更多 “All cargo wires need to be ().A、greasedB、oiledC、washedD、repaired” 相关考题
考题 All cargo booms are ready to ________.A.discharging cargoB.be dischargingC.discharge cargoD.be discharged cargo

考题 Ropes of wires attached to derricks to prevent them from swinging during cargo handling operations are ______.A.PreventersB.Side ropesC.StaysD.Guide lines

考题 Many buildings in the city need repairing, but the one ______first is the library.A.repaired B.being repairedC.repairing D.to be repaired

考题 Many buildings in the city need repairing, but the one_______ first is the library.A.repairedB. being repairedC. repairingD.to be repaired

考题 All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the ______.A.date of the testB.load at which a test sample brokeC.name of the vesselD.number of strands and of wires in each strand

考题 We need plenty of ()(绑扎钢丝).A、bridge platesB、bridge fittingsC、twist locksD、lashing wires

考题 All the cargo wires must be adjusted well.()A、所有的货物钢丝绳必须调整好。B、所有的货物钢丝绳必须修理好。C、所有的货物钢丝绳必须上油。D、所有的货物钢丝绳必须清洁好。

考题 我们需要大量的绑扎钢丝。()A、We need plenty of clamps.B、We need plenty of lashing wires.C、We need plenty of cargo wires.D、We need plenty of lashing bars.

考题 Before opening and closing the hatches, the spaces around the covers, all the parts and the gears should be ().A、clearedB、checkedC、removedD、repaired

考题 My car()A、needs to washB、needs washingC、needs being washedD、need swash

考题 This cargo wires has more than ten percent () wires.A、damagedB、brokenC、missingD、repaired

考题 这些绑扎工具必须要再次上紧。()A、These lashing tools must be tightened again.B、These lashing wires must be tightened again.C、These lashing bars must be secured again.D、These cargo wires must be loosened again.

考题 The cargo gear includes().A、derrick, winches, cargo ropes and wiresB、derricks, windlass, capstanC、hatch covers, derricks, windlassD、cranes, hatches, lashing wires

考题 ()has more than ten percent broken wires. Stop using it at once.A、The cargo runnerB、The cargo blockC、The derrick slingD、The lashing wire

考题 Several sand boxes need ().A、to repair and renewB、repairing and renewingC、repair and renewD、repaired and renewed

考题 All the cargo wires must be greased ().A、wellB、goodC、niceD、perfect

考题 All the cargo wires must be ()well.A、washedB、greasedC、cleanedD、scraped

考题 单选题All cargo wires need to be ().A greasedB oiledC washedD repaired

考题 单选题The ship is now too much listing to portside. Which is the best way to keep the vessel upright?().A Put all the remaining cargo on starboard sideB Put light cargo on starboardside and heavy cargo on port sideC Put light cargo on port side and heavy cargo on starboard sideD A,B,C are all correct

考题 单选题All the cargo wires must be adjusted well.()A 所有的货物钢丝绳必须调整好。B 所有的货物钢丝绳必须修理好。C 所有的货物钢丝绳必须上油。D 所有的货物钢丝绳必须清洁好。

考题 单选题()cargo means to check all cargo loaded into or discharged from a vessel.A TallyingB ExaminingC WeighingD Handling

考题 单选题The damaged cargo is not allowed to export without().A repairing or replacingB to repair or to replaceC being repaired or replacedD to be repaired or replaced

考题 单选题()has more than ten percent broken wires. Stop using it at once.A The cargo runnerB The cargo blockC The derrick slingD The lashing wire

考题 单选题All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the().A date of the testB load at which a test sample brokeC name of the vesselD number of strands and of wires in each strand

考题 单选题opes or wires attached to derricks to prevent them from swinging during cargo handling operations are().A PreventersB Side ropesC StaysD Guide lines

考题 单选题这些绑扎工具必须要再次上紧。()A These lashing tools must be tightened again.B These lashing wires must be tightened again.C These lashing bars must be secured again.D These cargo wires must be loosened again.

考题 单选题This cargo wires has more than ten percent () wires.A damagedB brokenC missingD repaired