When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().
A
provide the proper trim
B
prevent negative stability from developing
C
prevent excessive longitudinal stresses
D
control list
参考答案
参考解析
解析:
暂无解析
更多 “单选题When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().A provide the proper trimB prevent negative stability from developingC prevent excessive longitudinal stressesD control list” 相关考题
考题
On a voyage charter party when the vessel is in port the charter will specify a definite period of time for loading or discharging of cargo by the Charterer.This time is called ________ .A.DemurrageB.DispatchC.Days of readinessD.Laydays
考题
How could lashing gear used aboard Ro-Ro vessels be stowed when not in use?A.Drape along bracketsB.Leave in place while back loading cargo to save timeC.Hang vertically in the paint lockerD.All of the above
考题
Please kindly arrange for shore workers to do ______ during loading the heavy cargo on deck as soon as possible.A.the work of using lines and chains to secure the cargo on boardB.the lash workC.the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitchingD.the lashing work
考题
When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to ______.A.remove an existing list that would slow down cargo operationsB.initiate loading in conjunction with unloading at the hatchC.improve stability during cargo operationsD.allow longshoremen easy access to the hatch
考题
When loading bulk liquid cargo,what is the first action you should take if a cargo valve jammed open?A.Call the owner,operator,or terminal supervisorB.Unplug the deck scuppersC.Order the dock man to shut downD.Run out the vessel's or terminal's fire hose
考题
______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition
考题
When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list
考题
______ is not one of the more commonly adopted solid bulk cargo distributions.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Inhomogeneous hold loading condition
考题
Bonding cables are used during cargo transfer to ______.A.provide safe electrical power connection to barge equipmentB.keep the vessel from surging excessivelyC.prevent an accidental discharge of static electricityD.secure the cargo hose to a hatch when loading overall
考题
单选题The tallying of cargo refers to such kind of work that the amount and condition of all cargo should be checked().A
after its arrival at the destinationB
during the ship's voyage at seaC
before they come to the dockD
during the time when the loading or diacharging is going on
考题
单选题Petroleum cargo tanks should not be topped off at deck level when loading on a cold day because().A
a subsequent temperature rise will cause the cargo to overflowB
air pockets may cause the cargo to bubble out of the ullage holeC
the increased viscosity of the product requires higher loading pressure which increases the chances of a spillD
the tank valve may be stiff and a spill will occur before the valve can be closed
考题
单选题In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.A
is notB
has notC
do notD
does not
考题
单选题When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().A
remove an existing list that would slow down cargo operationsB
initiate loading in conjunction with unloading at the hatchC
improve stability during cargo operationsD
allow longshoremen easy access to the hatch
考题
单选题When arranging cargo for()in the holds,we should give first consideration to ship’s seaworthiness and her being in a good sea-going trim after loading.A
dunnageB
separationC
stowageD
operation
考题
单选题When loading or unloading baled cargo on board,the straps()to lift or drag the bales.A
are forbiddenB
are allowedC
can be usedD
are usually used
考题
单选题What is an example of the term Restraint of Rulers,Princes,or Peoples in a marine insurance policy? ()A
A prohibition from loading a cargo from a country when the cargo may be a carrier of infectious diseasesB
Arrest of a vessel by legal authorities to satisfy claims through exercise of a maritime lienC
Damage caused by riot of the population of a portD
Losses caused by fines from polluting the harbor after malfunction of a piping system
考题
单选题When loading bulk liquid cargo,what is the first action you should take if a cargo valve jammed open?()A
Call the owner,operator,or terminal supervisorB
Unplug the deck scuppersC
Order the dock man to shut downD
Run out the vessel's or terminal's fire hose
考题
单选题A ship is responsible for the cargo loaded or unloaded().A
only when the cargo is within its railB
after the cargo is checked by tallymenC
as soon as the cargo loading or unloading beginsD
during the time when loading or unloading is going on
考题
单选题How could lashing gear used aboard Ro-Ro vessels be stowed when not in use? ()A
Drape along bracketsB
Leave in place while back loading cargo to save timeC
Hang vertically in the paint lockerD
All of the above
考题
单选题The ship will be responsible for the cargo loaded or unloaded().A
only when the cargo is within its railB
during the time when loading or ynloading is going onC
after the cargo is checked by tallymenD
as soon as loading or discharging begins
考题
单选题The term Loading and unloading Cargo means().A
arranging cargoB
shipping cargoC
cargo handlingD
weighing cargo
考题
单选题Please kindly arrange for shore workers to do()during loading the heavy cargo on deck as soon as possible.A
the work of using lines and chains to secure the cargo on boardB
the lash workC
the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitchingD
the lashing work
考题
单选题A clause in the charter party requires a vessel’s owner to pay dispatch money when the vessel ().A
changes berths to expedite loading or dischargingB
does not load and discharge its cargo in the time specifiedC
is not ready to load or discharge cargoD
loads and discharges its cargo in less time than specified
考题
单选题Bonding cables are used during cargo transfer to().A
provide safe electrical power connection to barge equipmentB
keep the vessel from surging excessivelyC
prevent an accidental discharge of static electricityD
secure the cargo hose to a hatch when loading overall
考题
单选题我们正在装危险货。()A
We are loading flammable cargo.B
We are loading dangerous cargo.C
We are discharging flammable cargo.D
We are discharging dangerous cargo.