网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
When loading or unloading baled cargo on board,the straps()to lift or drag the bales.
A

are forbidden

B

are allowed

C

can be used

D

are usually used


参考答案

参考解析
解析: 暂无解析
更多 “单选题When loading or unloading baled cargo on board,the straps()to lift or drag the bales.A are forbiddenB are allowedC can be usedD are usually used” 相关考题
考题 Preparations for loading cargo on board ship.

考题 The time of voyage insurance with cargo on board will,in accordance with PICC Clauses, commence from the time of ________ .A.unmooring at port of sailingB.weighing anchor at port of sailingC.loading at port of sailingD.sailing from port of sailing

考题 When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to ______.A.remove an existing list that would slow down cargo operationsB.initiate loading in conjunction with unloading at the hatchC.improve stability during cargo operationsD.allow longshoremen easy access to the hatch

考题 The port State control officer will ensure that ______ is performed by all crude carriers either required to have a crude oil washing system or where the owner or operator chooses to install a crude oil washing system.A.cargo loading operationsB.cargo unloading operationsC.cargo control operations in the transportD.crude oil washing

考题 ______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition

考题 When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list

考题 在船上应当日出时升起国旗。()A、On board national flags should be hoisted when the sun sets.B、On board national flags should be hoisted when the sun rises.C、On board national flags should be lowered when the ship is in port.D、On board national flags should be hoisted flag when loading and discharging

考题 Loading and unloading cargo()A、装货能力和数量B、准备装卸货C、货物装卸D、货物损坏

考题 Get ready the mooring machinery, mooring lines and the gangway for ().A、loading cargoB、arrival in portC、departure from portD、unloading cargo

考题 装卸线 loading-unloading track

考题 英译中:Loading and unloading

考题 单选题The tallying of cargo refers to such kind of work that the amount and condition of all cargo should be checked().A after its arrival at the destinationB during the ship's voyage at seaC before they come to the dockD during the time when the loading or diacharging is going on

考题 单选题Petroleum cargo tanks should not be topped off at deck level when loading on a cold day because().A a subsequent temperature rise will cause the cargo to overflowB air pockets may cause the cargo to bubble out of the ullage holeC the increased viscosity of the product requires higher loading pressure which increases the chances of a spillD the tank valve may be stiff and a spill will occur before the valve can be closed

考题 单选题When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().A remove an existing list that would slow down cargo operationsB initiate loading in conjunction with unloading at the hatchC improve stability during cargo operationsD allow longshoremen easy access to the hatch

考题 单选题Loading and unloading cargo()A 装货能力和数量B 准备装卸货C 货物装卸D 货物损坏

考题 单选题The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().A the port of destinationB the next port of callC the port of arrivalD the last port of call

考题 单选题在船上应当日出时升起国旗。()A On board national flags should be hoisted when the sun sets.B On board national flags should be hoisted when the sun rises.C On board national flags should be lowered when the ship is in port.D On board national flags should be hoisted flag when loading and discharging

考题 单选题A ship is responsible for the cargo loaded or unloaded().A only when the cargo is within its railB after the cargo is checked by tallymenC as soon as the cargo loading or unloading beginsD during the time when loading or unloading is going on

考题 单选题Which of the following operations aboard a tanker must be recorded in the Oil Record Book ()A Any internal transfer of oil cargo during a voyageB The discharge overboard in port or at sea of any bilge water accumulated in machinery spacesC The loading or unloading of any or all oil cargoD All of the above

考题 单选题The ship will be responsible for the cargo loaded or unloaded().A only when the cargo is within its railB during the time when loading or unloading is going onC after the cargo is checked by tallymenD as soon as loading or discharging begins

考题 单选题The ship will be responsible for the cargo loaded or unloaded().A only when the cargo is within its railB during the time when loading or ynloading is going onC after the cargo is checked by tallymenD as soon as loading or discharging begins

考题 单选题The term Loading and unloading Cargo means().A arranging cargoB shipping cargoC cargo handlingD weighing cargo

考题 名词解释题装卸(Loading and Unloading)

考题 单选题The present voyage of my ship began at the port of Shanghai after loading 8 000 tons of Cargo on board and ended after discharging the Cargo at the port of Hong Kong,which was().A the port of destinationB the next port of callC the port of arrivalD the last port of call

考题 单选题When the seller pays for all charges up to an including the loading of a consignment on board the carrying vessel, the term is ().A DDUB FCAC FOBD CIF

考题 单选题Bonding cables are used during cargo transfer to().A provide safe electrical power connection to barge equipmentB keep the vessel from surging excessivelyC prevent an accidental discharge of static electricityD secure the cargo hose to a hatch when loading overall

考题 单选题When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().A provide the proper trimB prevent negative stability from developingC prevent excessive longitudinal stressesD control list