Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()
A

 Hot site

B

 Cold site

C

 Warm site

D

 Failover site


参考答案

参考解析
解析: 暂无解析
更多 “单选题Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()A  Hot siteB  Cold siteC  Warm siteD  Failover site” 相关考题
考题 Which of the following replication methods is MOST fault tolerant?() A. Hot siteB. Active/passive clustering at the same siteC. Disk-to-disk replication in the same serverD. Warm site

考题 An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.Which of the following site types should be considered to meet these requirements?()A. Hot siteB. Warm siteC. Cold siteD. Active failover site

考题 Which of the following disaster recovery sites requires power and cabling to be run before it can be used?() A.HotsiteB.ColdsiteC.WarmsiteD.Failoversite

考题 Which of the following computer recovery sites is the least expensive and the most difficult to test? 以下哪项计算机恢复站点是最便宜的和最难测试的?()A、non-mobile hot site. 非移动热站B、cold site. 冷站C、warm site. 热站D、mobile hot site. 移动热站

考题 Which of the following computer recovery sites is only partially equipped with processing equipment?下列哪项计算机恢复站点只有部分数据处理设备?()A、hot site. 热站B、cold site. 冷站C、warm site. 温站D、rolling hot site. 移动热站

考题 Contracts and agreements are often times unenforceable or hard to enforce in which of the following alternate facility recovery agreement?在以下哪个备用设施恢复协议中,合同和协议往往不能执行或者难以执行?()A、hot site. 热站B、cold site. 冷站C、reciprocal agreement. 互惠协议D、warm site. 温站

考题 Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()A、 Hot siteB、 Cold siteC、 Warm siteD、 Failover site

考题 A failure of the primary data center has occurred.  A warm site is available for use.  Which of the following should be done FIRST to bring the critical applications online?()A、Run cabling and power to the warm site.B、Restore data to the equipment.C、Transfer all data tapes over to the warm site.D、Restore least critical applications online to test to make sure the site is functioning.

考题 A technician has been given a task to create a separate location for disaster recovery. Thecompany has very high uptime requirements and will lose money if there is any downtime. Whichof the following deployments should the technician consider?()A、Hot siteB、Warm siteC、Fault tolerant siteD、Cold site

考题 Which of the following is the MOST important consideration when looking at distance requirements when planning a hot site?()A、Avoiding more expensive bandwidth costs for data lines between regionsB、Avoiding a regional disaster that affects both the main site and the hot siteC、Avoiding a second location that has high latency between sitesD、Avoiding a location that is too expensive

考题 Which of the following replication methods provides a disaster recovery system with minimal downtime to normal operations?()A、 Cold siteB、 Warm siteC、 GFSD、 Hot site

考题 An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()A、 Hot siteB、 Warm siteC、 Cold siteD、 Active failover site

考题 Which of the following is the MOST important step in preparing for disaster recovery?()A、 Test the disaster recovery plan processB、 Identify key disaster recovery personnelC、 Ensure that all backup data is kept off-siteD、 Assist management with IT backup policy decisions

考题 Which of the following replication methods is MOST fault tolerant?()A、 Hot siteB、 Active/passive clustering at the same siteC、 Disk-to-disk replication in the same serverD、 Warm site

考题 Which of the following will allow devices to be added without turning the server off?()A、Plug and PlayB、Warm siteC、Hot plugD、Hot site

考题 Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()A、HotsiteB、ColdsiteC、WarmsiteD、Failoversite

考题 Which of the following resources could be used to obtain the latest IBM DS Storage ManagerUser’s Guide?()A、InfoCenter web siteB、Announcement letterC、IBM Redbook web siteD、IBMTechline/Partnerline

考题 Which of the following can be used to re-deploy a system configuration in a disaster recovery scenario?()A、System planB、System profileC、Critical console dataD、VIO server partition profile

考题 单选题Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()A HotsiteB ColdsiteC WarmsiteD Failoversite

考题 单选题An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()A  Hot siteB  Warm siteC  Cold siteD  Active failover site

考题 单选题Which of the following computer recovery sites is the least expensive and the most difficult to test? 以下哪项计算机恢复站点是最便宜的和最难测试的?()A non-mobile hot site. 非移动热站B cold site. 冷站C warm site. 热站D mobile hot site. 移动热站

考题 单选题Which of the following can be used to re-deploy a system configuration in a disaster recovery scenario?()A System planB System profileC Critical console dataD VIO server partition profile

考题 单选题Which of the following is the MOST important step in preparing for disaster recovery?()A  Test the disaster recovery plan processB  Identify key disaster recovery personnelC  Ensure that all backup data is kept off-siteD  Assist management with IT backup policy decisions

考题 单选题Which of the following will allow devices to be added without turning the server off?()A  Plug and PlayB  Warm siteC  Hot plugD  Hot site

考题 单选题Which of the following replication methods provides a disaster recovery system with minimal downtime to normal operations?()A  Cold siteB  Warm siteC  GFSD  Hot site

考题 单选题A failure of the primary data center has occurred.  A warm site is available for use.  Which of the following should be done FIRST to bring the critical applications online?()A Run cabling and power to the warm site.B Restore data to the equipment.C Transfer all data tapes over to the warm site.D Restore least critical applications online to test to make sure the site is functioning.

考题 单选题Which of the following replication methods is MOST fault tolerant?()A  Hot siteB  Active/passive clustering at the same siteC  Disk-to-disk replication in the same serverD  Warm site