单选题
A failure of the primary data center has occurred. A warm site is available for use. Which of the following should be done FIRST to bring the critical applications online?()
A
Run cabling and power to the warm site.
B
Restore data to the equipment.
C
Transfer all data tapes over to the warm site.
D
Restore least critical applications online to test to make sure the site is functioning.
参考答案
参考解析
解析:
暂无解析
更多 “单选题A failure of the primary data center has occurred. A warm site is available for use. Which of the following should be done FIRST to bring the critical applications online?()A Run cabling and power to the warm site.B Restore data to the equipment.C Transfer all data tapes over to the warm site.D Restore least critical applications online to test to make sure the site is functioning.” 相关考题
考题
An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.Which of the following site types should be considered to meet these requirements?()A. Hot siteB. Warm siteC. Cold siteD. Active failover site
考题
A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data.Which sequence of actions will properly bring up the secondary site?()A. bring up the secondary site on the target disksB. suspend and bring up the secondary site on the target disksC. perform a FlashCopy and bring up the secondary site on the target disksD. go-to-sync, perform aFlashCopy, and bring up the secondary site on the target disks
考题
Which three are benefits of A virtualized data center solution over A typical implementation?()A、more efficient power consumptionB、fewer applications per serverC、less rack spaceD、more efficient routingE、more control over each serverF、simplified cabling
考题
A customer needs the ability to recover their data if a total system failure occurs. Which two of the following are the most important considerations in determining the solution?()A、Network utilizationB、Total amount of storage installedC、Amount of open files in the backupD、Amount of critical data in the backup or restore
考题
Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()A、 Hot siteB、 Cold siteC、 Warm siteD、 Failover site
考题
A failure of the primary data center has occurred. A warm site is available for use. Which of the following should be done FIRST to bring the critical applications online?()A、Run cabling and power to the warm site.B、Restore data to the equipment.C、Transfer all data tapes over to the warm site.D、Restore least critical applications online to test to make sure the site is functioning.
考题
Which of the following should be done FIRST to a hard drive before it is disposed?()A、PartitionB、Physical damageC、Data wipeD、Format
考题
An administrator is attempting to recover from a power failure in the data center. Which of the following is the BEST way to recover the servers?()A、 Bring up the WINS server, the DNS server, then the web serverB、 Bring up the web server, the time clock server, then the DHCP serverC、 Bring up the backup tape server, the DNS server, then the web serverD、 Bring up the active directory server, the DNS server, then the web server
考题
Which of the following is the BEST sequence to bare metal restore a server?()A、 Determine backups available, restore backups, and verify data.B、 Restore applications, restore data, and verify data.C、 Restore OS, restore system applications, and restore data.D、 Contact end users of outage, restore backup data, and verify data.
考题
An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center. Which of the following site types should be considered to meet these requirements? ()A、 Hot siteB、 Warm siteC、 Cold siteD、 Active failover site
考题
A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()A、 Identify which systems are the most critical and bring them up by level of importance.B、 Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C、 Identify the least critical systems and then power those systems on first.D、 Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
考题
An administrator has received complaints from users that an application is not available while other applications run. This application resides on an NFS mounted filesystem. Which of the following commands should be run as a reasonable first step to handle this problem?()A、dfB、showmountC、exportfsD、refresh -g nfs
考题
An administrator needs to recover an HMC due to a failed disk. The disk has been replaced, allowing the administrator to reinstall the HMC back to the required release of software. Backups of both the HMC Console Data and Upgrade Data are available. After reloading the HMC with the Recovery DVDs, what are the next steps to restore the HMC configuration?()A、Use the 'HMC Management Restore HMC Data' option to first restore just the HMC Data..B、Use the 'HMC Management Restore Upgrade Data' option to first restore just the Upgrade Data.C、Use the 'HMC Management Restore HMC Data' option to first restore the HMC Data and then the Upgrade Data.D、Use the 'HMC Management Restore Upgrade Data' option to first restore the Upgrade Data, and then the HMC Data.
考题
A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()A、bring up the secondary site on the target disksB、suspend and bring up the secondary site on the target disksC、perform a FlashCopy and bring up the secondary site on the target disksD、"go-to-sync", perform aFlashCopy, and bring up the secondary site on the target disks
考题
单选题A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()A
Identify which systems are the most critical and bring them up by level of importance.B
Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C
Identify the least critical systems and then power those systems on first.D
Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
考题
单选题A customer has one IBM System Storage DS8700 in their main data center with one DS6800 at a secondary site. They are using the Global Copy feature between the sites. They want to bring up a test image at the secondary site using the primary site data. Which sequence of actions will properly bring up the secondary site?()A
bring up the secondary site on the target disksB
suspend and bring up the secondary site on the target disksC
perform a FlashCopy and bring up the secondary site on the target disksD
go-to-sync, perform aFlashCopy, and bring up the secondary site on the target disks
考题
单选题An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center. Which of the following site types should be considered to meet these requirements? ()A
Hot siteB
Warm siteC
Cold siteD
Active failover site
考题
单选题A customer needs the ability to recover their data if a total system failure occurs. Which two of the following are the most important considerations in determining the solution?()A
Network utilizationB
Total amount of storage installedC
Amount of open files in the backupD
Amount of critical data in the backup or restore
考题
单选题An administrator needs to recover an HMC due to a failed disk. The disk has been replaced, allowing the administrator to reinstall the HMC back to the required release of software. Backups of both the HMC Console Data and Upgrade Data are available. After reloading the HMC with the Recovery DVDs, what are the next steps to restore the HMC configuration?()A
Use the 'HMC Management Restore HMC Data' option to first restore just the HMC Data..B
Use the 'HMC Management Restore Upgrade Data' option to first restore just the Upgrade Data.C
Use the 'HMC Management Restore HMC Data' option to first restore the HMC Data and then the Upgrade Data.D
Use the 'HMC Management Restore Upgrade Data' option to first restore the Upgrade Data, and then the HMC Data.
考题
单选题An administrator has received complaints from users that an application is not available while other applications run. This application resides on an NFS mounted filesystem. Which of the following commands should be run as a reasonable first step to handle this problem?()A
dfB
showmountC
exportfsD
refresh -g nfs
考题
单选题Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()A
Hot siteB
Cold siteC
Warm siteD
Failover site
考题
单选题Which of the following is the BEST sequence to bare metal restore a server?()A
Determine backups available, restore backups, and verify data.B
Restore applications, restore data, and verify data.C
Restore OS, restore system applications, and restore data.D
Contact end users of outage, restore backup data, and verify data.
考题
单选题Which of the following is the BEST sequence to bare metal restore a server?()A
Determine backups available, restore backups, and verify data.B
Restore applications, restore data, and verify data.C
Restore OS, restore system applications, and restore data.D
Contact end users of outage, restore backup data, and verify data.
考题
单选题A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()A
Identify which systems are the most critical and bring them up by level of importance.B
Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C
Identify the least critical systems and then power those systems on first.D
Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
考题
单选题An administrator is attempting to recover from a power failure in the data center. Which of the following is the BEST way to recover the servers?()A
Bring up the WINS server, the DNS server, then the web serverB
Bring up the web server, the time clock server, then the DHCP serverC
Bring up the backup tape server, the DNS server, then the web serverD
Bring up the active directory server, the DNS server, then the web server
考题
多选题Which three are benefits of A virtualized data center solution over A typical implementation?()Amore efficient power consumptionBfewer applications per serverCless rack spaceDmore efficient routingEmore control over each serverFsimplified cabling
考题
单选题An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center. Which of the following site types should be considered to meet these requirements?()A
Hot siteB
Warm siteC
Cold siteD
Active failover site
热门标签
最新试卷