网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
If the life raft capsizes,all personnel should leave the raft and().
A

climb onto the bottom

B

swim away from the raft

C

right the raft using the righting strap

D

inflate the righting bag


参考答案

参考解析
解析: 暂无解析
更多 “单选题If the life raft capsizes,all personnel should leave the raft and().A climb onto the bottomB swim away from the raftC right the raft using the righting strapD inflate the righting bag” 相关考题
考题 Prior to entering a davit-launched life raft, you should make sure that ______.A.the life raft is well ventilated of excess carbon dioxideB.all personnel have removed their life preservers to facilitate boardingC.the door flap has been cut away and stowed inside the raftD.All of the above

考题 Please choose a correct name for “救生圈”.A.life buoyB.life jacketC.life raft

考题 After abandoning ship, you should deploy the sea anchor from a life raft to ______.A.keep the life raft from capsizingB.navigate against the currentC.keep personnel from getting seasickD.stay in the general location

考题 An inflatable life raft should be lifted back aboard the ship by using ______.A.the single hook at the top of the raftB.two lines passed under the raftC.the towing bridleD.All of the above

考题 If a davit-launched life raft aboard a vessel cannot be launched because of damage to the davit, you should ______.A.inflate the life raft on deckB.roll the life raft over the sideC.go to another life raft stationD.get a saw and cut the life raft free

考题 If the life raft capsizes, all personnel should leave the raft and ______.A.climb onto the bottomB.swim away from the raftC.right the raft using the righting strapD.inflate the righting bag

考题 舷梯口应放置一个救生圈。()A、A life craft should be located on the gangway.B、A life-buoy should be located at the gangway door.C、A life-raft should be located on the gangway.D、A life boat should be located on the gangway.

考题 A company just hired a new plant maintenance manager, and they are concerned about the number of corrupt asset records in the present system. In future they want to prevent this from happening. When implementing the new solution, what is recommended?()A、All maintenance personnel have full access to all records.B、All maintenance personnel have read-only access to all data. C、Only a very limited number of personnel have full access to static data records, but all maintenance personnel are able to enter work order data.D、Maintenance personnel should not be using the system, and should only write entries on printed work orders and hire input clerks to enter these into the system.

考题 单选题An inflation life raft should be lifed back aboard the ship by using().A the single hook at the top of the raftB two lines passed under the raftC the towing bridleD All of the above

考题 单选题How should you try to right a capsized small sailing vessel?()A Position all personnel at the stern and rock the vessel uprightB Position all personnel around the mast and lift the vessel uprightC Lock the centerboard in the down position,stand on the centerboard,and pull on a shroud or a halyardD Put the centerboard in the up position and have all personnel haul in on the line attached to the mast

考题 单选题The davit aboard a ship is used to().A lower personnel down by a transfer basketB lower food and water to personnel in a life raftC lower the life raft down with its full complementD move equipment around the deck

考题 单选题If a davit-launched life raft aboard a vessel cannot be launched because of damage to the davit,you should().A inflate the life raft on deckB roll the life raft over the sideC go to another life raft stationD get a saw and cut the life raft free

考题 单选题Prior to entering a davit-launched life raft, you should make sure that().A the life raft is well ventilated of excess carbon dioxideB all personnel have removed their life preservers to facilitate boardingC the door flap has been cut away and stowed inside the raftD All of the above

考题 单选题A company just hired a new plant maintenance manager, and they are concerned about the number of corrupt asset records in the present system. In future they want to prevent this from happening. When implementing the new solution, what is recommended?()A All maintenance personnel have full access to all records.B All maintenance personnel have read-only access to all data. C Only a very limited number of personnel have full access to static data records, but all maintenance personnel are able to enter work order data.D Maintenance personnel should not be using the system, and should only write entries on printed work orders and hire input clerks to enter these into the system.

考题 单选题If the liferaft capsizes,all personnel should leave the raft and().A climb onto the bottomB swim away from the raftC right the raft using the righting strapD inflate the righting bag

考题 单选题Personnel working aloft (above 2metres) should wear()or other arresting device at all times.A a safety harness with lifelineB a safety netC a life buoyD buoyancy agarments

考题 单选题In order to retrieve an inflatable life raft and place it on deck , you should heave on the().A lifelinesB righting strapC sea anchorD towing bridle

考题 单选题All personnel should be familiar with the lifeboats ()A boarding and operating proceduresB maintenance scheduleC navigational systemsD fuel consumption rates

考题 单选题All personnel on board a vessel should be familiar with the rescue boat’s().A boarding and operating procedureB maintenance schedulesC navigational systemsD fuel consumption rates

考题 单选题舷梯口应放置一个救生圈。()A A life craft should be located on the gangway.B A life-buoy should be located at the gangway door.C A life-raft should be located on the gangway.D A life boat should be located on the gangway.

考题 单选题The () of the life-raft is sufficient for all of you.A capacityB visibilityC reliabilityD ability

考题 单选题After abandoning ship, you should deploy the sea anchor from a life raft to().A keep the life raft from capsizingB navigate against the currentC keep personnel from getting seasickD stay in the general location

考题 单选题One Class Surveyor got onboard of a 45000 DWT new construction Chemical Tanker a week before delivery, he carried out the initial Safety Equipment survey in accordance with the Fire Fighting and Life-saving Control Plan.Surveyor noted that the vessel had two (2) 15 persons’ Life-rafts at each side, and One (1) 6 persons’ Life-raft on the forward main deck. The surveyor verified the Life-rafts’ certificate and found that the max storing height of one 15 person’s Life-raft at port side to be 18 meters as indicated on its certificate. But the surveyor checked the drawings and noted that actual storing position was 18.5 meters above the Lightweight water line of this vessel.Surveyor recommended shipyard to change the Life-raft or re-locate the life-raft in order to comply with the stowing height requirement as indicated on its certificate. Do you think the Surveyor’s recommendation is correct?()A The surveyor’s comment was not correct; because the Life-raft has the Hydra-Static Releaser, should not care the height of Storing PositionB The surveyor’s comment was correct; because if the Storing height was over the Limit of the Life-raft, It may damage the Life-raft when throwing off to the waterC The surveyor’s comment was not correct; the storing position was the same location as showing on the approved drawingsD The surveyor’s comment was correct; as a surveyor, he can give any comment as he like

考题 单选题If you have to abandon ship and enter a life-raft, your main course of action should be ().A remain in the vicinity of the vesselB head for the closest landC head for the closest sea-lanesD get a majority opinion

考题 单选题All vessel personnel should be familiar with the survival craft’s()A boarding and operating proceduresB maintenance scheduleC navigational systemsD fuel consumption rates

考题 单选题All OSV personnel should be familiar with survival craft().A boarding and operating proceduresB maintenance scheduleC navigational systemsD fuel consumption rates

考题 单选题All electrical appliances aboard a vessel should be grounded to().A prevent them from falling when the vessel rollsB protect personnel from electrical shockC increase their operating efficiencyD prevent unauthorized personnel from operating them