网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server. Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year. What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()
A
Purchase a 4-way p630 to compensate for not using SMT.
B
Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.
C
Purchase the p5-550 server and install AIX 5.2 and enable SMT.
D
Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server. Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year. What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()A Purchase a 4-way p630 to compensate for not using SMT.B Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.C Purchase the p5-550 server and install AIX 5.2 and enable SMT.D Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.” 相关考题
考题
单选题Which of the following features sets IBM apart from competitors in the area of partitioning?()A
Software supportB
Hardware isolationC
Static changes in partitionsD
Micro-Partitioning
考题
单选题A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()A
Have the PDU requirements been met?B
Are there sufficient KVM connections?C
Is there sufficient service clearance?D
Is there sufficient space in the existing rack?
考题
单选题A customer wants to run a Cluster 1600 configuration with multiple p655 servers. They are using the new High Performance Switch for the high-speed interconnection between nodes. Which of the following is the only supported cluster management software?()A
CSMB
PSSPC
GPFSD
HACMP
考题
单选题The account team designed a p5-570 solution to strategically position the customer for future IBM announcements. The customer was dissatisfied upon implementing the solution. An AIX v5.1 partition was added to the requirements halfway through the solution design process and it was not considered in the final design. What should the pSeries technical specialist have done to prevent this situation?()A
Submitted an RPQ (Request for Quote) for AIX v5.1 support on a p5-570B
Designed a p670 because it supports AIX 5.1 partitionsC
Initially designed a solution supporting AIX 5.1 partitionsD
Gained customer approval for the final design prior to ordering the system
考题
单选题A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-way database and application servers that are more than five years old. In addition to savings potential in the areas of operating system and database charges, what other significant savings component should be highlighted?()A
Maintenance savings due to warranty on new machinesB
Reliability savings of using one machine versus tenC
Financial savings due to cash outlays now versus laterD
Power savings even if the current power usage is unknown