考题
Feasibility studies occur in which life cycle phase (s)?A.ConceptualB.Conceptual or DevelopmentC.ExecutionD.Preliminary planningE.any life cycle phase
考题
Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. Life cycle costing categories include the cost of _____, _____, and _____.A . R D, maintainability, operation and support.B . R D, production, operation and support.C . Acquisition, operations, maintenance.D . Production, operations, maintenance.E . None of the above
考题
During which phase of the project life cycle is the amount at stake lowest?A conceptB developmentC executionD conclusionE C and D
考题
74 Life cycle costing is the total cost to the customer for the acquisition and ownership over its full life. Life cycle costing categories include the cost of _____, _____, and _____.A. R D, maintainability, operation and support.B. R D, production, operation and support.C. Acquisition, operations, maintenance.D. Production, operations, maintenance.E. None of the above
考题
141 Feasibility studies occur in which life cycle phase (s)?A. ConceptualB. Conceptual or DevelopmentC. ExecutionD. Preliminary planningE. any life cycle phase
考题
● Feasibility studies occur in which life cycle phase (s)?A ConceptualB Conceptual or DevelopmentC ExecutionD Preliminary planningE any life cycle phase
考题
● A project life cycle is a collection of generally sequential project (73)whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74)for managing the project, regardless of the specific work involved.(73)A. phasesB. processesC. segmentsD. pieces(74)A. planB. fractionC. mainD. framework
考题
A project life cycle is a collection of generally sequential project (73) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic (74) for managing the project, regardless of the specific work involved.A.phasesB.processesC.segmentsD.pieces
考题
The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycleIt is().A.developmentB.conceptC.system analysisD.implementation
考题
The following statements have been made about life cycle costing:(i) It focuses on the short-term by identifying costs at the beginning of a product’s life cycle(ii) It identifies all costs which arise in relation to the product each year and then calculates the product’s profitability on an annual basis(iii) It accumulates a product’s costs over its whole life time and works out the overall profitability of a product(iv) It allocates costs to each stage of a product’s life cycle and writes them off at the end of each stageWhich of the above statements is/are correct?A.(i) and (iii)B.(iii) onlyC.(i) and (iv)D.(ii) only
考题
Which of the following statements is correct?A.The definition phase results in the Software Requirements Specification.B.Testing is optional in software life cycle.C.CASE tools can only aid in the design phase of a software life cycle.D.A change during a later phase does not require the documentation of all earlier phases to be updated.
考题
A project life cycle is a collection of generally sequential project ()whose name and number are determined by the control needs of the organization or organizations involved in the project.
The life cycle provides the basic for managing the project, regardless of the specific work involved.A.phases
B.processes
C.segments
D. pieces
考题
A project life cycle is a collection of generally sequential project whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic () for managing the project, regardless of the specific work involved.A. plan
B. fraction
C. main
D.framework
考题
The most expensive phase of life cycle costing is ( ) .A.Termination
B.Applied research
C.Production
D.Operations and support
考题
The life cycle ofa project is a description of the various phases of the project from the beginning to the end.One of the followings is not a phase of the traditional project life cycle,itis_( )A.devclopment
B.concept
C.system analysis
D.implementation
考题
There are four phases in the life cycle of a project:start,plan,execute and( ).A.implement
B.performance
C.end
D.excute
考题
The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is( ).A.development
B.concept
C.system analysis
D.implementation
考题
The life cycle of aproject is a description of the various phases of the project from thebeginning to the end. One of the followings is not a phase of the traditionalproject life cycle, It is( ). A.development
B.concept
C.system analysis
D.implementation
考题
A project life cycle is a collection of generally sequential project()(1) whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic ()(2) for managing the project, regardless of the specific work involved.
空白(2)处应选择()A、planB、fractionC、mainD、framework
考题
单选题The passage is primarily concerned with which of the following?A
Describing the life cycle of the Plasmodium protozoan as it relates to the disease malariaB
Comparing and contrasting the life cycles of the six variants of the Plasmodium protozoan known to cause malariaC
Addressing the public health implications of the life cycle of the Plasmodium parasiteD
Providing information on how a person can avoid infection with malariaE
Describing the life cycle of the Anopheles mosquito as it relates to the transmission of the Plasmodium protozoan to humans
考题
多选题Which two options best describe how the Maven Plugin for WebLogic enables WebLogic to be effectively used in a Continuous Integration environment?()Aexecution of unit and integration testsBmanagement of the life cycle of a WebLogic domain including creation, configuration, and server life-cycle managementCdeployment and undeployment of applicationsDJava profiling
考题
单选题The main purpose of the essay is to describe the life cycle of the lobsterA
describe the life cycle of the lobsterB
explain the problems that arise when raising captive lobstersC
show that no matter what hatcheries do, they cannot help the lobstersD
convey the need for more funding for lobster hatcheriesE
illustrate how and why lobster hatcheries work to maintain the lobster population
热门标签
最新试卷