网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The object of plugging holes below the waterline on a ship should be to().
A

eliminate all water entering the hole

B

only plug holes in machinery or other vital spaces

C

reduce the entry of water as much as possible

D

plug the largest holes first


参考答案

参考解析
解析: 暂无解析
更多 “单选题The object of plugging holes below the waterline on a ship should be to().A eliminate all water entering the holeB only plug holes in machinery or other vital spacesC reduce the entry of water as much as possibleD plug the largest holes first” 相关考题
考题 The depth of the ship below the waterline measured vertically to the lowest part of the hull is calledA.trimB.leanC.draftD.tonnage

考题 When using a Lambert conformal chart in high latitudes,angles such as bearings are measured in reference to ______.A.the meridian through the object of the bearingB.the meridian through the ship's positionC.the meridian midway between the ship and the objectD.any meridian

考题 Repairing damage to the hull of a ship at or above the waterline reduces the threat of ______.A.free surface effectsB.capsizing the shipC.continued progressive floodingD.wind overturning moments

考题 Free communication will adversely affect transverse stability only when the flooded space is ______.A.off-centerB.on the centerlineC.completely floodedD.open to the sea above and below the waterline

考题 Which statement about damage control is TRUE ________.A.A hole in the hull at the waterline is more dangerous than a hole below the inner bottomB.The amount of water entering a ship through a hole varies inversely to the area of the holeC.Water flowing into a lower compartment on a ship is more dangerous than water on deck or flowing into an upper compartmentD.Water flowing over the forecastle bulwark is more dangerous than a hole in the hull at the waterline

考题 All echo-sounders can measure the ______.A.Actual depth of waterB.Actual depth of water below keelC.Average depth from waterline to hard bottomD.Average depth of water to soft bottom

考题 When patching holes in the hull of a ship,pillows,bedding,and other soft materials can be used as ______.A.caulkingB.gasketsC.strongbacksD.wedges

考题 Which part as below don’t has direct interest in the safety of shipping and the welfare of seamen()A、Flag StateB、Ship ownerC、Ship chandlerD、Classification society

考题 从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.

考题 单选题The meaning of slacken her speed is().A increase ship's speedB slow down ship's speedC make up ship's speedD fix up shp's speed

考题 单选题On a semisubmersible ship,reserve buoyancy is increased by the presence of void spaces above the waterline in the().A submerged hullsB quartersC columns and upper structureD submerged connecting structures

考题 单选题()refers to the height from the waterline to the bottom of the ship.A DraftB FreeboardC DerrickD Drift

考题 单选题Reserve buoyancy is().A also called GMB the void portion of the ship below the waterline which is enclosed and watertightC affected by the number of transverse watertight bulkheadsD the watertight portion of a vessel above the waterline

考题 单选题In plugging submerged holes on a vessel,rags,wedges,and other materials should be used in conjunction with plugs to().A reduce the water pressure on the hullB reduce the water leaking around the plugsC prevent progressive floodingD reduce the possibility of stress fractures

考题 单选题The apparent wind can be zero when the true wind is from().A ahead and equal to the ship's speedB astern and equal to the ship's speedC ahead and equal to twice the ship's speedD astern and equal to twice the ship's speed

考题 单选题A change of trim may be simply defined as().A the change in difference between the forward and aft draftsB the sum of free communication,free surface and pocketingC the moment of inertia of the ship's waterline plane about the athwartship axisD rolling and listing

考题 单选题()is an opening for supplying seawater to condensers, pumps,etclocated in the hull below the waterline and having means for the attachment of associated piping.A SEA CHESTB SCUPPERC SCUTTLED SEA PORT

考题 单选题When using a Lambert conformal chart in high latitudes,angles such as bearings are measured in reference to ().A the meridian through the object of the bearingB the meridian through the ship's positionC the meridian midway between the ship and the objectD any meridian

考题 单选题A vessel is equipped with cross-connected deep tanks. In which situation should the cross-connection valve be closed? ()A The tanks lie above the waterline and are filledB The tanks are partially filled with dry cargoC The tanks are partially filled with liquid cargoD The tanks are filled and lie below the waterline

考题 单选题From the waterline to the ship’s()(底部) is called draft.A topB bridgeC bottomD middle

考题 单选题The depth of the ship below waterline measured vertically to the lowest part of the hull is called ().A trimB leanC draftD tonnage

考题 单选题()refers to the depth of a vessel below the waterline,measured vertically to the lowest part of the hull,propellers or other reference points.A Free boardB Stability heightC Metacentric heightD Draft

考题 单选题从水线到船底是“吃水”。()A “From the centerline to the ship’s bottom” is “draft”.B “From the keel to the ship’s bottom” is “draft”.C The maximum distance from the waterline to the ship’s bottom is “draft”.D “From the centerline to the ship’s main deck” is “draft”.

考题 单选题Which is the winter load waterline on the load waterline mark?().A The line over the summer load waterlineB The line above the tropical load waterlineC The line below the tropical load waterlineD The line between the summer and the winter north Atlantic load waterline

考题 单选题All echo-sounders can measure the().A actual depth of waterB actual depth of water below keelC average depth from waterline to hard bottomD average depth of water to soft bottom

考题 单选题A vessel is equipped with cross-connected deep tanks.In which situation should the crossconnection valve be closed?().A The tank lie above the waterline and are filledB The tank are partically filled with dry cargoC The tanks are partially filled with liquid cargoD The tanks are filled and lie below the waterline

考题 单选题The object of the both-to-blame collision clause is().A to free the carrying ship from liabilityB to free the non-carrying ship from liabilityC to free the ship in the wrong from liabilityD to free the ship not to blame from liability