网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The depth of the ship below waterline measured vertically to the lowest part of the hull is called ().
A

trim

B

lean

C

draft

D

tonnage


参考答案

参考解析
解析: 暂无解析
更多 “单选题The depth of the ship below waterline measured vertically to the lowest part of the hull is called ().A trimB leanC draftD tonnage” 相关考题
考题 The depth of the ship below the waterline measured vertically to the lowest part of the hull is calledA.trimB.leanC.draftD.tonnage

考题 Which statement about damage control is TRUE ________.A.A hole in the hull at the waterline is more dangerous than a hole below the inner bottomB.The amount of water entering a ship through a hole varies inversely to the area of the holeC.Water flowing into a lower compartment on a ship is more dangerous than water on deck or flowing into an upper compartmentD.Water flowing over the forecastle bulwark is more dangerous than a hole in the hull at the waterline

考题 All echo-sounders can measure the ______.A.Actual depth of waterB.Actual depth of water below keelC.Average depth from waterline to hard bottomD.Average depth of water to soft bottom

考题 Molded depth is measured from the ______.A.inside of the shellB.outside of the shellC.top of the center vertical keelD.top of the garboard stake

考题 ()(富余水深) is the depth remaining under a ship’s bottom.A、Under-keel heightB、Under-keel clearanceC、Under-keel draftD、Under-keel depth

考题 从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.

考题 Definition of Length:()A、The length shall be taken as 96% of the total lengthB、The length shall be taken as 96% of the LbpC、The length shall be taken as 96% of the total length on a waterline at 85% of the least moulded depth measured from the top of the keelD、The length from the fore side of the stem to the axis of the rudder stock on that waterline

考题 单选题()is the depth of the vessel at ship’s side from the upper deck to the lowest point of the keel.A Extreme draftB Molded draftC Extreme depthD Molded depth

考题 单选题The object of plugging holes below the waterline on a ship should be to().A eliminate all water entering the holeB only plug holes in machinery or other vital spacesC reduce the entry of water as much as possibleD plug the largest holes first

考题 单选题On a semisubmersible ship,reserve buoyancy is increased by the presence of void spaces above the waterline in the().A submerged hullsB quartersC columns and upper structureD submerged connecting structures

考题 单选题()refers to the height from the waterline to the bottom of the ship.A DraftB FreeboardC DerrickD Drift

考题 单选题Reserve buoyancy is().A also called GMB the void portion of the ship below the waterline which is enclosed and watertightC affected by the number of transverse watertight bulkheadsD the watertight portion of a vessel above the waterline

考题 单选题What is reserve buoyancy?().A The amount of buoyancy measured in foot/tonsB The vertical distance above the waterline inside the hullC The volune of space that is filled with waterD The volume of intact space above the waterline

考题 多选题Definition of Length:()AThe length shall be taken as 96% of the total lengthBThe length shall be taken as 96% of the LbpCThe length shall be taken as 96% of the total length on a waterline at 85% of the least moulded depth measured from the top of the keelDThe length from the fore side of the stem to the axis of the rudder stock on that waterline

考题 单选题()is an opening for supplying seawater to condensers, pumps,etclocated in the hull below the waterline and having means for the attachment of associated piping.A SEA CHESTB SCUPPERC SCUTTLED SEA PORT

考题 单选题Free communication will adversely affect transverse stability only when the flooded space is ().A off-centerB on the centerlineC completely floodedD open to the sea above and below the waterline

考题 单选题()length of the ship measured from extreme points of the ship forward and aft.A Length overallB After perpendicularC AmidshipsD Extreme breadth

考题 单选题From the waterline to the ship’s()(底部) is called draft.A topB bridgeC bottomD middle

考题 单选题()refers to the depth of a vessel below the waterline,measured vertically to the lowest part of the hull,propellers or other reference points.A Free boardB Stability heightC Metacentric heightD Draft

考题 单选题Vertically below the deckline is a circle whose outside diameter is 300mm.It is called the().A the deck lineB Plimsoll discC Plimsoll lineD summer load line

考题 单选题Molded depth is measured from the().A inside of the shellB outside of the shellC top of the center vertical keelD top of the garboard stake

考题 单选题从水线到船底是“吃水”。()A “From the centerline to the ship’s bottom” is “draft”.B “From the keel to the ship’s bottom” is “draft”.C The maximum distance from the waterline to the ship’s bottom is “draft”.D “From the centerline to the ship’s main deck” is “draft”.

考题 单选题Which is the winter load waterline on the load waterline mark?().A The line over the summer load waterlineB The line above the tropical load waterlineC The line below the tropical load waterlineD The line between the summer and the winter north Atlantic load waterline

考题 单选题All echo-sounders can measure the().A actual depth of waterB actual depth of water below keelC average depth from waterline to hard bottomD average depth of water to soft bottom

考题 单选题()(富余水深) is the depth remaining under a ship’s bottom.A Under-keel heightB Under-keel clearanceC Under-keel draftD Under-keel depth

考题 单选题A vessel is equipped with cross-connected deep tanks.In which situation should the crossconnection valve be closed?().A The tank lie above the waterline and are filledB The tank are partically filled with dry cargoC The tanks are partially filled with liquid cargoD The tanks are filled and lie below the waterline

考题 单选题()is measured from the baseline to the summer loadline at the midship section.A Extreme draftB Molded draftC Extreme depthD Molded depth