网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The depth of the ship below waterline measured vertically to the lowest part of the hull is called ().
A
trim
B
lean
C
draft
D
tonnage
参考答案
参考解析
解析:
暂无解析
更多 “单选题The depth of the ship below waterline measured vertically to the lowest part of the hull is called ().A trimB leanC draftD tonnage” 相关考题
考题
The depth of the ship below the waterline measured vertically to the lowest part of the hull is calledA.trimB.leanC.draftD.tonnage
考题
Which statement about damage control is TRUE ________.A.A hole in the hull at the waterline is more dangerous than a hole below the inner bottomB.The amount of water entering a ship through a hole varies inversely to the area of the holeC.Water flowing into a lower compartment on a ship is more dangerous than water on deck or flowing into an upper compartmentD.Water flowing over the forecastle bulwark is more dangerous than a hole in the hull at the waterline
考题
All echo-sounders can measure the ______.A.Actual depth of waterB.Actual depth of water below keelC.Average depth from waterline to hard bottomD.Average depth of water to soft bottom
考题
Molded depth is measured from the ______.A.inside of the shellB.outside of the shellC.top of the center vertical keelD.top of the garboard stake
考题
()(富余水深) is the depth remaining under a ship’s bottom.A、Under-keel heightB、Under-keel clearanceC、Under-keel draftD、Under-keel depth
考题
从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.
考题
Definition of Length:()A、The length shall be taken as 96% of the total lengthB、The length shall be taken as 96% of the LbpC、The length shall be taken as 96% of the total length on a waterline at 85% of the least moulded depth measured from the top of the keelD、The length from the fore side of the stem to the axis of the rudder stock on that waterline
考题
单选题()is the depth of the vessel at ship’s side from the upper deck to the lowest point of the keel.A
Extreme draftB
Molded draftC
Extreme depthD
Molded depth
考题
单选题The object of plugging holes below the waterline on a ship should be to().A
eliminate all water entering the holeB
only plug holes in machinery or other vital spacesC
reduce the entry of water as much as possibleD
plug the largest holes first
考题
单选题On a semisubmersible ship,reserve buoyancy is increased by the presence of void spaces above the waterline in the().A
submerged hullsB
quartersC
columns and upper structureD
submerged connecting structures
考题
单选题()refers to the height from the waterline to the bottom of the ship.A
DraftB
FreeboardC
DerrickD
Drift
考题
单选题Reserve buoyancy is().A
also called GMB
the void portion of the ship below the waterline which is enclosed and watertightC
affected by the number of transverse watertight bulkheadsD
the watertight portion of a vessel above the waterline
考题
单选题What is reserve buoyancy?().A
The amount of buoyancy measured in foot/tonsB
The vertical distance above the waterline inside the hullC
The volune of space that is filled with waterD
The volume of intact space above the waterline
考题
多选题Definition of Length:()AThe length shall be taken as 96% of the total lengthBThe length shall be taken as 96% of the LbpCThe length shall be taken as 96% of the total length on a waterline at 85% of the least moulded depth measured from the top of the keelDThe length from the fore side of the stem to the axis of the rudder stock on that waterline
考题
单选题()is an opening for supplying seawater to condensers, pumps,etclocated in the hull below the waterline and having means for the attachment of associated piping.A
SEA CHESTB
SCUPPERC
SCUTTLED
SEA PORT
考题
单选题Free communication will adversely affect transverse stability only when the flooded space is ().A
off-centerB
on the centerlineC
completely floodedD
open to the sea above and below the waterline
考题
单选题()length of the ship measured from extreme points of the ship forward and aft.A
Length overallB
After perpendicularC
AmidshipsD
Extreme breadth
考题
单选题()refers to the depth of a vessel below the waterline,measured vertically to the lowest part of the hull,propellers or other reference points.A
Free boardB
Stability heightC
Metacentric heightD
Draft
考题
单选题Vertically below the deckline is a circle whose outside diameter is 300mm.It is called the().A
the deck lineB
Plimsoll discC
Plimsoll lineD
summer load line
考题
单选题Molded depth is measured from the().A
inside of the shellB
outside of the shellC
top of the center vertical keelD
top of the garboard stake
考题
单选题从水线到船底是“吃水”。()A
“From the centerline to the ship’s bottom” is “draft”.B
“From the keel to the ship’s bottom” is “draft”.C
The maximum distance from the waterline to the ship’s bottom is “draft”.D
“From the centerline to the ship’s main deck” is “draft”.
考题
单选题Which is the winter load waterline on the load waterline mark?().A
The line over the summer load waterlineB
The line above the tropical load waterlineC
The line below the tropical load waterlineD
The line between the summer and the winter north Atlantic load waterline
考题
单选题All echo-sounders can measure the().A
actual depth of waterB
actual depth of water below keelC
average depth from waterline to hard bottomD
average depth of water to soft bottom
考题
单选题()(富余水深) is the depth remaining under a ship’s bottom.A
Under-keel heightB
Under-keel clearanceC
Under-keel draftD
Under-keel depth
考题
单选题A vessel is equipped with cross-connected deep tanks.In which situation should the crossconnection valve be closed?().A
The tank lie above the waterline and are filledB
The tank are partically filled with dry cargoC
The tanks are partially filled with liquid cargoD
The tanks are filled and lie below the waterline
考题
单选题()is measured from the baseline to the summer loadline at the midship section.A
Extreme draftB
Molded draftC
Extreme depthD
Molded depth
热门标签
最新试卷