Your vessel is damaged and is listing to port. The rolling period is short. There is sufficient freeboard so that deck edge submersion is not a problem. What corrective action should be taken FIRST in regard to the vessel’s stability?().
A

Press up any slack double-bottom tanks to eliminate free surface

B

Flood any empty double-bottom tanks to add weight low and down

C

Jettison topside weights to reduce KG and KB

D

Shift any off-center weights from port to starboard


参考答案

参考解析
解析: 暂无解析
更多 “单选题Your vessel is damaged and is listing to port. The rolling period is short. There is sufficient freeboard so that deck edge submersion is not a problem. What corrective action should be taken FIRST in regard to the vessel’s stability?().A Press up any slack double-bottom tanks to eliminate free surfaceB Flood any empty double-bottom tanks to add weight low and downC Jettison topside weights to reduce KG and KBD Shift any off-center weights from port to starboard” 相关考题
考题 Pump out No. 2 port ballast tank to ______.A.keep vessel afloatingB.refloat vessel listing to starboardC.make vessel all-rightD.bring vessel upright

考题 during bunkering in the last vessel ,what were you assigned to do ?or what was your position during bunkering on your last vessel ?

考题 A list signal of one white light indicates that the vessel is ______.A.on an even keelB.listing about 1° to the side the light is displayed onC.listing over 5°With the light displayed on the high sideD.listing,and the chutes should be directed to the side where the light is displayed

考题 A vessel which is being assisted by an icebreaker would display a flag hoist consisting of the code numeral "4" when the vessel ______.A.speed begins to dropB.stopsC.receives ice damageD.becomes icebound

考题 Bilge keels are fitted on ships to ______.A.Assist in drydock alignmentB.Improve the vessel's stabilityC.Protect the vessel from slamming against piersD.Reduce the rolling of the vessel

考题 单选题Your vessel was damaged and initially assumed a significant list and trim; however,further increase has been slow. Based on this data,what should you expect?()A The slowing is only temporary and the vessel will probably suddenly capsize or plunge from loss of stability due to change in the waterplane areaB The vessel can probably be saved if further flooding can be stoppedC The vessel will continue to slowly list and/or trim due to the free surface effect and free communication effectD The vessel will suddenly flop to the same or greater angle of list on the other side and may capsize

考题 单选题If you are fighting a fire below the main deck of your vessel,which action is most important concerning the stability of the vessel?().A Shutting off electricity to damaged cablesB Pumping fire-fighting water overboardC Maneuvering the vessel so the fire is on the lee sideD Removing burned debris from the cargo hold

考题 单选题Your vessel has been damaged and is taking on water,but you do not require immediate assistance. You would preface a message advising other vessels of your situation with().A Mayday-Mayday-MaydayB Pan-Pan (3 times)C Securite-Securite-SecuriteD SOS-SOS-SOS

考题 单选题Your vessel is damaged,listing to port and on occasion flopping to the same angle to starboard. It has a long,slow,sluggish roll around the angle of list. There is excessive trim by the stern with little freeboard aft. What action should you take?().A Jettison any off-center topside weights to lower GM and correct the listB Pump out any slack after double-bottom tanks to reduce free surface and increase freeboard aftC Pump out the after peak and fill the forepeak to change the trimD Press up any slack double-bottom tanks forward of the tipping center,then fill the forepeak if empty

考题 单选题A vessel has been damaged by fire. The survey shows the cost of repairs will exceed the value of the repaired vessel. This is an example of a(n)().A constructive total lossB salvage lossC actual lossD preferred loss

考题 单选题Your vessel is damaged and listing to port. There is a short rolling period around the angle of list. The portside freeboard is reduced to 1 foot. There is no trim and the weather is calm. You should FIRST().A press up a slack double bottom tank on the port sideB fill an empty centerline double bottom tankC pump out a slack marine portable tank located on the portside amidshipsD jettison the anchors and anchor cables

考题 单选题If your vessel has a GM of one foot and a breadth of 50 feet,what will be your full rolling period? ()A 11 secondsB 15 secondsC 20 secondsD 22 seconds

考题 单选题You must shift a weight from the upper tween deck to the lower hold. This shift will().A make the vessel more tenderB make the vessel stifferC increase the rolling periodD decrease the metacentric height

考题 单选题Your vessel is damaged with no list,but down by the stern. There is progressive flooding and trim by the stern is increasing. What is the effect on transverse stability after the deck edge at the stern is submerged?()A KB increases,increasing BM and therefore GMB KG increases due to the weight of the added water on deckC BM decreases from loss of water plane and greater volumeD There is no effect on transverse stability

考题 单选题Movement of liquid in a tank when a vessel inclines causes an increase in().A righting armB metacentric heightC height of the uncorrected KGD natural rolling period

考题 单选题Your vessel is listing 4° to port and has a short rolling period. There is loose firefighting water in the hull. The ship is trimmed down by the head with one foot of freeboard at the bow. Which action should you take FIRST?()A Press up the slack NO.1 starboard double bottom tankB Pump out the forepeak tankC Eliminate the water in the 'tween decks aft

考题 单选题If you are fighting a fire below the main deck of your vessel,which action is most importantconcerning the stability of the vessel? ()A Shutting off electricity to damaged cablesB Pumping fire-fighting water overboardC Maneuvering the vessel so the fire is on the lee sideD Removing burned debris from the cargo hold

考题 单选题Your vessel is NOT making way,but is not in any way disabled.Another vessel is approaching you on your starboard beam.Which statement is TRUE().A Your vessel is obligated to stay out of the wayB The other vessel must give way,since your vessel is stoppedC You should be showing the lights or shapes for a vessel not under commandD You should be showing the lights or shapes for a vessel restricted in her ability to maneuver

考题 单选题Pump out No.2 port ballast tank to().A keep vessel afloatingB refloat vessel listing to starboardC make vessel all-rightD bring vessel upright

考题 单选题Bilge keels are fitted on ship to().A assist in drydock alignmentB improve the vessel's stabilityC protect the vessel from slamming against piersD reduce the rolling of the vessel

考题 单选题A vessel continually lists to one side and has a normal rolling period. Which statement is TRUE?().A The vessel has negative GMB The center of gravity is on the centerlineC The list can be corrected by reducing KMD The vessel has asymmetrical weight distribution

考题 单选题The function of the bilge keel is to().A reduce the rolling of the vesselB serve as the vessel's main strength memberC add strength to the bilgeD protect the vessel's hull when alongside a dock

考题 单选题By paying out more anchor cable,you().A decrease the holding power of your anchorB decrease the swing of your vessel while at anchorC increase the holding power of your anchorD increase the possibility that your vessel will drag anchor

考题 单选题Your vessel is crossing a narrow channel.A vessel to port is within the channel and crossing your course.She is showing a black cylinder.What is your responsibility?()A hold your course and speedB sound the danger signalC begin an exchange of passing signalsD do not cross the channel if you might impede the other vessel

考题 单选题The phrase “When built” in the Certificate of Vessel’s Nationality definitely means().A When was your vessel builtB At what time is your vessel buildingC When is your vessel builtD At what time you built your vessel

考题 单选题If the Charterer sends a vessel to an unsafe port,and she is damaged as a result,he will have to indemnify the().A ReceiverB Cargo ownerC ShipownerD Merchant

考题 单选题The phrase “When built” in the Certificate of Vessel’s Nationality means().A when was your vessel builtB at what time is your vessel buildingC when is your vessel builtD at what time you built your vessel