网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The fact that a part of the cargo has already been discharged will not()the owners of the rest,under all circumstances,from claiming a general average contribution from the Shipowner.
A

preclude

B

include

C

dilute

D

pollute


参考答案

参考解析
解析: 暂无解析
更多 “单选题The fact that a part of the cargo has already been discharged will not()the owners of the rest,under all circumstances,from claiming a general average contribution from the Shipowner.A precludeB includeC diluteD pollute” 相关考题
考题 In fact, the panic is __________. As the map shows, the drought has been confined to the south and east of Britain. A.overheardB.overchargedC.overdoneD.overtime

考题 The boy()to school already. A、has takenB、has been takingC、is takenD、has been taken

考题 That man ( ) at the bus stop for the last half hour.--- Shall I tell him that the last bus ( ) A.has stood … has already goneB.has been standing… has already beenC.is standing… has already goneD.has been standing…has already gone

考题 We are of course() that the period for completion of your project has already been exceeded .A. knowB. to knowC. awareD. sure

考题 We are of course()that the time for completion of your project has already been exceeded. A、knowB、to knowC、awareD、sure

考题 This part of the city has been ( )as a shopping area. A、playedB、organizedC、zonedD、specialized

考题 When William hurried home, he found that his mother ____already ____to hospital.A、has; been sentB、had; sentC、has; sentD、had; been sent

考题 The fact that a part of the cargo has already been discharged will not ________ the owners of the rest, under all circumstances, from claiming a general average contribution from the Shipowner.A.precludeB.includeC.diluteD.pollute

考题 The mere fact that free pratique has not been obtained ________ mean that the ship is not ready to load, if, in fact, free pratique can be obtained at any time and without the possibility of delaying the loading.A.does notB.is notC.are notD.has not

考题 The fact that it has become impossible to procure a cargo ______,as a rule,relieve the Charterer of liability.A.is notB.isC.does notD.can hardly be

考题 The Shipowner cannot claim contribution from ______ if,after general average expenditure has been incurred,the ship and cargo are lost before the conclusion of the voyage.A.the CharterersB.the carriersC.the cargo ownersD.the persons of the property damaged

考题 ______ the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.A.WhereB.As a fact thatC.In so far asD.In no case that

考题 It should be noted that laydays do not begin to run ______ the ship is,so far as she is concerned,ready to receive or discharge cargo,unless she would have been ready except for the Charterer's default.A.whenB.at the time thatC.untilD.as soon as

考题 A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.A.Cargo has been loaded or dischargedB.Cargo hose is connectedC.Cargo pumps are startedD.Vessel is ready to handle cargo

考题 I HAVE DANGEROUS LIST means ______.A.I have some dangerous cargo on boardB.My cargo is dangerousC.My vessel is inclinedD.My vessel has not been trimmed properly

考题 Although a natural alternative,such as honey,can be used to sweeten food if this is necessary,we can in fact do without it.Nowadays fibre is considered to be an important part of a healthy diet.In white bread,for example,the fibre has been removed.But it is( )in unrefined flour and of course in vegetables.A.current B.substantial C.present D.essential

考题 Attention has already been drawn to the fact _________a single harmonization proposal can take decades to come to fruition. A. that B. as C. which D. where

考题 单选题杂货船可以用自己的吊杆装卸货物。()A General cargo ships may load and discharge by her own winch.B Bulk carriers may handle cargo by her own derricks.C General cargo ships may load and discharge by her own derricks.D General cargo ships may load and discharge by cranes.

考题 单选题The bill of lading is prima facie evidence()the quantity of goods alleged to have been shipped has been shipped in fact.A thatB whichC whereD while

考题 单选题Owner shall have a lien on the cargo for freight,dead-freight,demurrage and damages for detention.It means that().A Owner will not deliver the cargo if freight not paidB Owner will keep the dead-freight until the cargo has been deliveredC Owner will keep the demurrage as soon as the cargo be deliveredD Owner shall have no right of detention for the damaged cargo to be delivered

考题 单选题()the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.A WhereB As a fact thatC In so far asD In no case that

考题 单选题A bonding cable should be connected for cargo operations aboards a tank vessel as soon as the().A cargo has been loaded or dischargedB cargo ghose is connectedC cargo pumps are startedD vessel is ready to handle cargo

考题 单选题The total quantity of oil discharge into the sea()for existing tankers 1/15000 of the total quantity of the particular cargo or which the residue formed a part().A does not exceedB should exceedC should be up toD should be no more than

考题 单选题The fact that it has become impossible to procure a cargo(),as a rule,relieve the Charterer of liability.A is notB isC does notD can hardly be

考题 单选题If there is a strike or lock-out affecting the cargo on or after vessel’s arrival at port of discharge and the same has not been settled within 48 hours,Receivers shall have the option of keeping vessel waiting until such strike or lock-out is at an end against paying half demurrage after expiration of the time prescribed for discharging or ordering the vessel to a substituting port.The “same” refers to().A the cargoB the portC the arrivalD the strike or lock-out

考题 单选题Which statement is TRUE concerning the tandem working arrangement of pedestal cranes when completing a quad lift? ()A The discharge is slow due to the size of the cargo and all the cranes working togetherB The cargo discharge can be accomplished with controlled pendulationC The cargo discharge can be performed in port or at anchorD The cranes enable the handling of heavy cargos without shoreside assistance

考题 单选题The combined fan discharge rate in an inert gas system is related to the().A shoreside loading rateB maximum cargo pump discharge rateC boiler forced draft fan rateD size of the largest cargo tank

考题 单选题I HAVE DANGEROUS LIST means().A I have some dangerous cargo on boardB My cargo is dangerousC My vessel is inclinedD My vessel has not been trimmed properly