网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
2号舱口处的起货机出故障了。()
A
There is something wrong with the derrick at hatch No.2.
B
There is something wrong with the derrick at hatch No.1.
C
There is something wrong with the winch at hatch No.2.
D
There is something wrong with the winch at hatch No.1.
参考答案
参考解析
解析:
暂无解析
更多 “单选题2号舱口处的起货机出故障了。()A There is something wrong with the derrick at hatch No.2.B There is something wrong with the derrick at hatch No.1.C There is something wrong with the winch at hatch No.2.D There is something wrong with the winch at hatch No.1.” 相关考题
考题
There is something wrong with the winch at hatch No.2.()A、二舱的起货机出故障了。B、一舱的起货机出故障了。C、二舱的重吊杆出故障了。D、一舱的中吊杆出故障了。
考题
钴60治疗机和医用电子加速器的共同点是()A、结构复杂,不易出故障B、结构复杂,容易出故障C、结构复杂,不易出故障,无须定期检测D、结构简单,易于出故障,需定期检测E、结构简单,不易出故障
考题
起货机出故障时,水手要去叫电工来修理。()A、When the windlass is in trouble, the sailor must go and call the electrician to repair it.B、When the derrick is in trouble, the sailor must go and call the electrician to repair it.C、When the winch is in trouble, the sailor must go and call the electrician to repair it.D、When the winch is in trouble, the sailor must go and call the carpenter to repair it.
考题
2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.
考题
很多船上在每个舱口处都有两个吊杆及两台起货机。()A、Many ships have two derricks at each hatch.B、Many ships have two winches at each hatch.C、Many ships have two derricks and two winches at each hatch.D、Many ships have two derricks and two winches at each hatch cover.
考题
关于吊杆式起货机的以下说法中错误的是()A、单吊杆起货机加强后可作为重型吊杆用B、双吊杆起货机必须两人操作C、吊杆受力相同的条件下,单吊杆起货机与双吊杆起货机的工作负载相同D、单吊杆起货机每吊的作业周期比双吊杆起货机长,工作效率低
考题
单选题关于吊杆式起货机的以下说法中错误的是()。A
单吊杆起货机加强后可作为重型吊杆用B
双吊杆起货机必须两人操作C
吊杆受力相同的条件下,单吊杆起货机与双吊杆起货机的工作负载相同D
单吊杆起货机每吊的作业周期比双吊杆起货机长,工作效率低
考题
单选题以下对重大故障上报时限描述正确的是()。A
重大故障自障碍发生至上报到集团公司不得超过60分钟。B
重大故障自判断出其为重大故障起,至上报到集团公司不得超过60分钟。C
重大故障自障碍发生至上报到集团公司不得超过30分钟。D
重大故障自判断出其为重大故障起,至上报到集团公司不得超过30分钟。
考题
单选题There is something wrong with the winch at hatch No.2.()A
二舱的起货机出故障了。B
一舱的起货机出故障了。C
二舱的重吊杆出故障了。D
一舱的中吊杆出故障了。
考题
多选题按是否连锁,进货机制可分为()A集中进货机制B分散进货机制C连锁进货机制D多店进货机制E单店进货机制
热门标签
最新试卷