网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
By regulation,cargo tank atmosphere must be inert before and during which operation?()
A

Stripping

B

Loading

C

Cleaning

D

All of the above


参考答案

参考解析
解析: 暂无解析
更多 “单选题By regulation,cargo tank atmosphere must be inert before and during which operation?()A StrippingB LoadingC CleaningD All of the above” 相关考题
考题 An inert gas system installed on a tanker is designed to ______.A.aid in the stripping and cleaning of cargo tanksB.increase the rate of discharge of cargoC.force toxic and explosive fumes from a cargo tank to vent to the outside atmosphereD.lower the oxygen levels inside cargo tanks,making explosion nearly impossible

考题 How does an inert gas system on a tanker function to prevent explosions in cargo tanks?A.De-energizes the "charged mist" effectB.Maintains a positive pressure on the vent header to cool the flammable vaporsC.Inert gas filters out the flammable vapors from the cargo tank spacesD.Inert gas dilutes the flammable vapor and air concentrations to keep them below the lower explosive limit

考题 A cargo tank that is initially gas freed,can be inerted by introducing inert gas by a process known as ______.A.dilutionB.displacementC.precipitationD.Either A or B

考题 The purpose of inert gas systems aboard tank vessels is to ______.A.allow sufficient oxygen in the tank to sustain lifeB.prevent outside air from entering the tankC.provide increase in cargo discharge pressureD.comply with double hull pollution prevention regulations

考题 You are discharging cargo and the inert gas system is in operation to inert the tanks. The pressure in a tank being discharged starts to drop below the allowable limit. What action should you take?A.Cut in another IG fan to increase gas flowB.Open the pressure control valve until the pressure increasesC.Open the tank isolation valve to the fully open positionD.Reduce the pumping rate

考题 By regulation,cargo tank atmosphere must be inert before and during which operation ________.A.StrippingB.LoadingC.CleaningD.All of the above

考题 ______ shall be provided in every cargo tank and slop tank in accordance with the appropriate Resolutions.A.A load on top systemB.Direct line systemC.Circle line systemD.An inert gas system

考题 Inerting means ______.A.The introduction of inert gas into a tank with the object of reducing the oxygen content to below 8% by volumeB.The introduction of inert gas into a gas free tank for the purpose of reducing the oxygen content to below 8% by volumeC.The introduction of inert gas into a cargo tank during cargo discharge to replace the volume of discharged cargoD.All of the above

考题 What is the purpose of pressure-vacuum relief valves ________.A.Regulation of discharge pressure from cargo pumpsB.Maintaining constant velocity in cargo linesC.Regulation of suction head on cargo pumpsD.To maintain a tank or void at atmospheric pressure

考题 When a non-volatile cargo is carried in a tank that has not been previously gas freed,then that tank shall ______.A.be purged with hydrocarbon gas prior to loadingB.be gas-freed after loading operationsC.not be maintained in an inert conditionD.be maintained in an inert condition

考题 When a tank is to be gas freed after washing,the concentration of hydrocarbon vapour should be reduced by purging the inerted cargo tank with ______.A.the oxygenB.the gasC.the inert gasD.the hydrocarbon vapour

考题 Which statement about inert gas pressures in a cargo tank is TRUE ________.A.The pressures of the inert gas in the tank may create excessive pressure at the pump while dischargingB.Gas pressures should be maintained at the highest permissible level throughout the discharging processC.High gas pressures may cause pyrophoric oxidation in the tankD.High gas pressures may cause loss of suction when stripping

考题 You are planning to use a crude oil washing system.What precaution must be taken with the tank as the source for the washing machines ________.A.It must be debottomed and the level lowered by at least one meterB.The oil in the source tank must be sampled for compatibilityC.The source tank must have been crude oil washed at least once in the past 150 daysD.The inert gas system must lower the oxygen content to a maximum of 12% oxygen in the tank

考题 You are planning to use the crude oil washing system on your tanker.What is required to prevent electrostatic buildup in the tanks ________.A.The portable machines should be set at the proper drop for the first wash before the fixed machines are usedB.The tank used as the source for the tank cleaning machines should be debottomed for at least one meterC.The inert gas system must reduce the oxygen content in the tank to at least 18%D.The fixed machines must be operated simultaneously with the portable machines to equalize the electrostatic potential

考题 Your tanker is carrying a cargo of styrene.Which of the following is NOT a requirement for carriage of this cargo ________.A.P/V valves with galvanized parts must be replacedB.Authorization to carry styrene must be endorsed on the Certificate of InspectionC.You must have a Certificate of Inhibition provided by the shipperD.The cargo tank heating coils must be blanked off

考题 An inert gas system is designed to reduce the possibility of tank explosions by ______.A.eliminating sparks and fire in the vicinity of cargo tanksB.removing all hydrocarbon gases from the cargo tanksC.blanketing cargo tanks with inert foamD.reducing the oxygen concentration below levels necessary for combustion

考题 By regulation,cargo tanks must be inert before and during what operation?A.StrippingB.LoadingC.CleaningD.Crude oil washing

考题 单选题The purpose of inert gas systems aboard tank vessels is to().A allow sufficient oxygen in the tank to sustain lifeB prevent outside air from entering the tankC provide increase in cargo discharge pressureD comply with double hull pollution prevention regulations

考题 单选题When checking the oxygen content of the cargo tanks prior to loading cargoes requiring vapor recovery,the atmosphere must be sampled().A one meter from the tank bottom and one meter below the tank topB one half the ullage of the tank and one meter below the tank topC one half the ullage of the tank and one meter above the tank bottomD at three meter intervals from the tank top

考题 单选题An inert gas system is designed to reduce the possibility of tank explosions by().A eliminating sparks and fire in the vicinity of cargo tanksB removing all hydrocarbon gases from the cargo tanksC blanketing cargo tanks with inert foamD reducing the oxygen concentration below levels necessary for combustion

考题 单选题A cargo tank that is initially gas freed,can be inerted by introducing inert gas by a process known as().A dilutionB displacementC precipitationD Either A or B

考题 单选题By regulation,cargo tanks must be inert before and during what operation?().A StrippingB LoadingC CleaningD Crude oil washing

考题 单选题What action must be taken when an individual cargo tank is closed off from the inert gas system by the tank isolation valve?()A The tank must be gas freedB The tank must be ballastedC The tank must be vented to the atmosphereD The bypass valve must also be closed

考题 单选题You are discharging cargo and the inert gas system is in operation to inert the tanks. The pressure in a tank being discharged starts to drop below the allowable limit. What action should you take? ()A Cut in another IG fan to increase gas flowB Open the pressure control valve until the pressure increasesC Open the tank isolation valve to the fully open positionD Reduce the pumping rate

考题 单选题An inert gas system installed on a tanker is designed to().A aid in the stripping and cleaning of cargo tanksB increase the rate of discharge of cargoC force toxic and explosive fumes from a cargo tank to vent to the outside atmosphereD lower the oxygen levels inside cargo tanks,making explosion nearly impossible

考题 单选题Inerting means().A the introduction of inert gas into a tank with the object of reducing the oxygen content to below 8% by volumeB the introduction of inert gas into a gas free tank for the purpose of reducing the oxygen content to below 8% by volumeC the introduction of inert gas into a cargo tank during cargo discharge to replace the volume of discharged cargoD All of the above

考题 单选题The combined fan discharge rate in an inert gas system is related to the().A shoreside loading rateB maximum cargo pump discharge rateC boiler forced draft fan rateD size of the largest cargo tank