Which action increases server availability?()
A
configuring a second network card with a different IP address
B
replacing the existing 100 Mbps NIC with a gigabit Ethernet NIC
C
using adapter teaming and configuring the second network card with the same IP address as the first network card
D
installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps
参考答案
参考解析
解析:
暂无解析
更多 “单选题Which action increases server availability?()A configuring a second network card with a different IP addressB replacing the existing 100 Mbps NIC with a gigabit Ethernet NICC using adapter teaming and configuring the second network card with the same IP address as the first network cardD installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps” 相关考题
考题
Which High Availability solution can provide a consistent, time-delayed (for example, one hour) snapshot of the live production database?()
A.MySQL ReplicationB.Distributed Replication Block DeviceC.Windows Server Failover ClusteringD.MySQL Cluster
考题
Which IDP policy action closes the connection and sends an RST packet to both the client and the server?()
A. close-connectionB. terminate-connectionC. close-client-and-serverD. terminate-session
考题
An administrator is experiencing availability issues on a Linux server. The administrator decides tocheck the server for an IP address conflict on the server. Which of the following commands should the administrator use?()A.tracerouteB.tracertC.ifconfigD.ipconfig
考题
Which three of the following are valid CRS deployment scenarios? ()A、High Availability CRS Engines running on hardware from different server classes B、High Availability CRS Engines running on similar hardware from the same server class but from different vendors C、High Availability CRS Engines and database and a simplex Recording Server D、High Availability CRS Engines and four simplex VoIP Monitoring Servers E、CCM co-resident deployment on an MCS 7815
考题
Which of the following server clusters offers increased availability, performance, and scalability?()A、 Passive/activeB、 Active/passiveC、 Passive/passiveD、 Active/active
考题
Which IDP policy action closes the connection and sends an RST packet to both the client and the server?()A、close-connectionB、terminate-connectionC、close-client-and-serverD、terminate-session
考题
Which action increases server availability?()A、 configuring a second network card with a different IP addressB、 replacing the existing 100 Mbps NIC with a gigabit Ethernet NICC、 using adapter teaming and configuring the second network card with the same IP address as the first network cardD、 installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps
考题
Which of the following BEST describes how server virtualization can cut down IT costs? ()A、 Server virtualization increases server application performance allowing productivity to be increased.B、 Server virtualization simplifies server administration and reduces the IT department staffing needs.C、 Server virtualization implements higher security measures at the server OS level reducing the need for other security implementations.D、 Server virtualization is a more efficient use of hardware for multiple servers reducing the resource utilization.
考题
An administrator is experiencing availability issues on a Linux server. The administrator decides tocheck the server for an IP address conflict on the server. Which of the following commands should the administrator use?()A、tracerouteB、tracertC、ifconfigD、ipconfig
考题
Which of the following is the FIRST course of action before implementing a change to a server?()A、 Survey users to get their response to the potential server change.B、 The change should be approved by management.C、 Switch over to the alternate site so users are not affected.D、 Implement RAID so the server does not go offline.
考题
During a planning session, the customer indicates the need to provide high availability between a Node attached to an IBM TotalStorage Enterprise Storage Server and a remote node attached to a IBM TotalStorage FAStT server with automatic fallover in the event of a disaster. Which of the following HACMP options will provide this functionality?() A、 GeoRMB、 HACMP/XD://PPRCC、 HACMP/XD://GPFSD、 HACMP/XD://HAGEO
考题
You are a professional level SQL Server 2005 database administrator in an international corporation named Wiikigo. You are experienced in implementing high-availability solutions, monitoring the database server, and design deployment. In the company, you major job is the deployment, maintenance and support of Microsoft SQL Server 2005. You work as the database administrator for your company. You find a problem that there are three reports which are running slowly. And through detailed analysis, you conclude that no error messages are generated from these reports. Not only the indexing strategy but also the status of the current indexes is tested by you. You confirm that the slow performance of the financial reports is not caused by it. Since you are the technical support, you are required to find out which statement is causing the slow performance. Which action should be performed first?()A、SQL Server Profiler should be run with the Lock:Deadlock event class.B、The Database Engine Tuning Advisor (DTA) f should be run or at least one hour.C、SQL Server Profiler should be run with the TSQL_Duration template.D、The Database Engine Tuning Advisor (DTA) should be run with the default options.
考题
Which of the following cmdlets will you use to check all aspects of the replication and replay status to provide a cor Mailbox server in a database availability group (DAG)?()A、Get-DatabaseAvailabilityGroupB、Test-MRSHealthC、Test-ReplicationHealthD、Get-DetailsTemplate
考题
单选题Which action is optional when adding an authentication realm for use on an Infranet Controller? ()A
Modify sign-in policy.B
Configure role mapping.C
Assign authentication server.D
Configure authentication policy.
考题
单选题Which of the following is the FIRST course of action before implementing a change to a server?()A
Survey users to get their response to the potential server change.B
The change should be approved by management.C
Switch over to the alternate site so users are not affected.D
Implement RAID so the server does not go offline.
考题
单选题A technician is attempting to use a command line prompt to continuously ping a remote server to check availability and reliability of the connection. Which of the following provides the ping command needed to continuously ping the system?()A
ping -aB
ping -fC
ping -rD
ping -t
考题
单选题Which of the following cmdlets will you use to check all aspects of the replication and replay status to provide a cor Mailbox server in a database availability group (DAG)?()A
Get-DatabaseAvailabilityGroupB
Test-MRSHealthC
Test-ReplicationHealthD
Get-DetailsTemplate
考题
单选题A high availability solution must be designed for a single file server. Data must be replicated between the disks to ensure a failure of one disk does not bring down the server. Which of thefollowing meets these requirements?()A
RAID 1B
RAID 0C
Active/passive clusterD
Disk-to-disk
考题
单选题Which of the following BEST describes how server virtualization can cut down IT costs? ()A
Server virtualization increases server application performance allowing productivity to be increased.B
Server virtualization simplifies server administration and reduces the IT department staffing needs.C
Server virtualization implements higher security measures at the server OS level reducing the need for other security implementations.D
Server virtualization is a more efficient use of hardware for multiple servers reducing the resource utilization.
考题
多选题Which three of the following are valid CRS deployment scenarios? ()AHigh Availability CRS Engines running on hardware from different server classesBHigh Availability CRS Engines running on similar hardware from the same server class but from different vendorsCHigh Availability CRS Engines and database and a simplex Recording ServerDHigh Availability CRS Engines and four simplex VoIP Monitoring ServersECCM co-resident deployment on an MCS 7815
考题
单选题A customer is running business-critical applications on a few SQL servers in their environment. The customer needs to know if and when the SQL server stops, so the service can be restarted immediately. Which of the following will accomplish this?()A
Use the Capacity Manager to monitor the processes on the servers.Log the events to the event log and use the resource monitor to restart the SQL process.B
Use the System Availability tool that comes with IBM Director to improve the availability of the SQL applications.C
Use the IBM Director Application PING function to watch the SQL service. When the SQL service goes down, restart the service remotely on the managed server using the software distribution function.D
Utilize Process Management and create a threshold to monitor the SQL process.Create an Event Action Plan and set the task to restart the SQL process when stopped and apply it to the managed SQL servers.
考题
单选题Which High Availability solution can provide a consistent, time-delayed (for example, one hour) snapshot of the live production database?()A
MySQL ReplicationB
Distributed Replication Block DeviceC
Windows Server Failover ClusteringD
MySQL Cluster
考题
单选题Which IDP policy action closes the connection and sends an RST packet to both the client and the server?()A
close-connectionB
terminate-connectionC
close-client-and-serverD
terminate-session
考题
单选题A server has failed after a tested and scheduled change control has been implemented. Which of the following is the FIRST thing the server technician should do?()A
Perform a root cause analysis.B
Escalate the problem.C
Notify stakeholders.D
Establish a plan of action.
考题
多选题Servers in your environment run Windows Server 2003. You plan to configure a highly available file server. You need to choose the appropriate high-availability technology and the minimum Windows Server 2003 edition for this server. Which technology and edition should you choose?()Afailover clusteringBNetwork Load BalancingCWindows Server 2003, Standard EditionDWindows Server 2003, Enterprise Edition
考题
单选题Which of the following server clusters offers increased availability, performance, and scalability?()A
Passive/activeB
Active/passiveC
Passive/passiveD
Active/active
考题
单选题Which of the following is the FIRST course of action before implementing a change to a server?()A
Survey users to get their response to the potential server change.B
The change should be approved by management.C
Switch over to the alternate site so users are not affected.D
Implement RAID so the server does not go offline.