网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The Chief Officer estimated the broken space()3,500 cubic feet.
A

at

B

by

C

with

D

in


参考答案

参考解析
解析: 暂无解析
更多 “单选题The Chief Officer estimated the broken space()3,500 cubic feet.A atB byC withD in” 相关考题
考题 驾驶员A.captainB.chief officerC.chief engineerD.deck officer

考题 Who is the head of the deck department?A.Captain.B.Bosun.C.Chief officer.D.Chief engineer.

考题 When will an Engineer Officer in charge of watch call Chief Engineer?

考题 Is your chief officer on board?

考题 At an unsheltered(开放的) anchorage the chief engineer officer shall consult with ______whether or not to maintain an underway watch.A.the engineer officer in charge of watchB.the deck officer in charge of watchC.the masterD.the chief mate

考题 Do you know ______ ?A.where is the chief officerB.where the chief officer isC.is where the chief officerD.the chief officer is where

考题 The Chief Checker reminded the Chief Officer ______ the dried turnips on top of the turpentine.A.to put notB.not to putC.of puttingD.of not putting

考题 When there is not a chief officer on board, ____ should keep and write up the ship’s logbook.A.the assistance officerB.the captainC.the officer on dutyD.the third officer

考题 Who should direct short-term recovery actions immediately following a disaster? 谁应当在灾难发生后立即领导短期的灾难恢复行动?()A、Chief Operating Officer. 首席运营官B、Chief Information Officer. 首席信息官C、Chief Executive Officer. 行政总裁CEOD、Disaster Recovery Manager. 灾难恢复经理

考题 引航员()A、pilotB、captainC、chief officerD、third officer

考题 英译中:Chief logistics officer

考题 ()is the officer responsible for the overall maintenance of deck department.A、BosunB、Chief officerC、Third officerD、Second officer

考题 Who maintains the fire-fighting and life-saving apparatus?()A、The second officer.B、The chief officer.C、The third officer.D、Bosun.

考题 驾驶员()A、captainB、chief officerC、chief engineerD、deck officer

考题 大副负责整个甲板部的维修保养工作。()A、The chief officer is responsible for the overall maintenance of the deck department.B、The second officer is responsible for the overall cleaning of the deck department.C、The third officer is responsible for the overall maintenance of the deck department.D、The chief officer is responsible for the overall cleaning of the deck department.

考题 单选题Do you know().A Where is the chief officerB Where the chief officer isC Is where the chief officerD The chief officer is where

考题 单选题Do you know()?A where is the chief officerB where the chief officer isC is where the chief officerD where the chief officer

考题 单选题At an unsheltered anchorage the chief engineer officer shall consult with () whether or not to maintain an underway watch.A the engineer officer in charge of watchB the deck officer in charge of watchC the masterD the chief mate

考题 单选题The officer in charge of the engineering watch shall continue to be responsible for machinery operations, ()the presence of the chief engineer in the machinery space.A as long asB unlessC despiteD till

考题 单选题Who maintains the fire-fighting and life-saving apparatus?()A The second officer.B The chief officer.C The third officer.D Bosun.

考题 单选题There are many navigational aids().A in chief engineer's roomB in chief officer's roomC on the bridgeD on deck

考题 单选题大副负责整个甲板部的维修保养工作。()A The chief officer is responsible for the overall maintenance of the deck department.B The second officer is responsible for the overall cleaning of the deck department.C The third officer is responsible for the overall maintenance of the deck department.D The chief officer is responsible for the overall cleaning of the deck department.

考题 单选题The chief officer estimated the broken space()3500 cubic feet.A atB byC withD in

考题 单选题When the chief engineer is in the machinery spaces, the officer in charge of the engineering watch shall()A continue to be responsible for machinery space operations despite the presence of the CEB hand over the responsibility activelyC be responsible for the watching together with the chief engineerD assistant the chief engineer to control the machinery

考题 单选题When the machinery spaces are in the periodic unmanned condition, shall be immediately available and on call to attend the machinery space().A the chief engineerB the designated engineer from shipyardC the designated duty officer in charge of the engineering watchD the designated surveyor from classification society

考题 单选题Chief Officer, the cargo()is broken.A runnerB runC runningD runned

考题 单选题During tours of inspection in the machinery space, you found a fire on a running generator, what should you do first?()A inform chief engineer officer immediatelyB stop the generatorC let the duty officer in bridge determine how to doD wait for help