网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
TDC3000系统中,NIM是()的网络接口,NIM必须冗余以保证安全。
A
LCN与UCN
B
LCN与PLNM
C
PLNM与UCN
D
LCN与PIN
参考答案
参考解析
解析:
暂无解析
更多 “单选题TDC3000系统中,NIM是()的网络接口,NIM必须冗余以保证安全。A LCN与UCNB LCN与PLNMC PLNM与UCND LCN与PIN” 相关考题
考题
TDC-3000基本的系统通常由一条LCN网络,数个万能操作站,一个历史模件(HM),一个冗余网络接口模件(NIM),一条UCN网络以及一个或数个过程管理器(PM)或先进过程管理器(APM)或高性能过程管理器(HPM)和逻辑管理器(LM)等组成。
考题
During a NIM install, the system stops with the LED code 611.What is the cause of the issue?()A、A failure to NFS mount filesystems from the NIM clientB、A failure to NFS mount filesystems from the NIM masterC、A failure to retrieve the tftp client info from the NIM masterD、A failure to retrieve the tftp server info from the NIM master
考题
For NIM to install client machines located in a non-adjacent network, which routing must be defined?() A、Boot/install servers will be required on each intermediate network.B、When an install is initiated by the client, routing is only required from the LPAR back to the NIM master.C、When an install is initiated by the NIM master, routing is only required from the NIM master to the client.D、Appropriate network NIM resources need to be defined to the NIM master to allow routing in both directions.
考题
判断题TDC-3000基本的系统通常由一条LCN网络,数个万能操作站,一个历史模件(HM),一个冗余网络接口模件(NIM),一条UCN网络以及一个或数个过程管理器(PM)或先进过程管理器(APM)或高性能过程管理器(HPM)和逻辑管理器(LM)等组成。A
对B
错
考题
单选题During a NIM install,the system stops with the LED code 611.What is the cause of the issue?()A
A failure to NFS mount filesystems from the NIM clientB
A failure to NFS mount filesystems from the NIM masterC
A failure to retrieve the tftp client info from the NIM masterD
A failure to retrieve the tftp server info from the NIM master
考题
单选题TDC3000系统中,NIM(催化)的节点地址为()。A
21、22B
23、24C
9、10D
11、12
热门标签
最新试卷