网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()
A
Build the logical partition infrastructure based on 6 or more VLANs.
B
Build the logical partition infrastructure based on two or more IVEs.
C
Build the logical partition infrastructure based on Partition Mobility.
D
Build the logical partition infrastructure based on redundant VIO Servers.
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()A Build the logical partition infrastructure based on 6 or more VLANs.B Build the logical partition infrastructure based on two or more IVEs.C Build the logical partition infrastructure based on Partition Mobility.D Build the logical partition infrastructure based on redundant VIO Servers.” 相关考题
考题
AnITdirectorneedstodeploy3partitions,eachusingdedicatedinternalbootdisk.Whichsystemwillsupportthecustomerrequirementusingtheleastamountofrackspace?()
A.Power770serversB.Power750serversC.Power755serversD.Power720servers
考题
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()A、Upgrade OS to AIX 5.2.B、Implement Micro-Partitioning.C、Upgrade HMC to support POWER5.D、Install Partition Load Manager.
考题
A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A、 PowerVM Lx86B、 PowerVM Express EditionC、 PowerVM Standard EditionD、 PowerVM Enterprise Edition
考题
In addition to a POWER5 system and an HMC, what else is required to enable Micro-Partitions in an AIX environment?()A、AIX 5.3 and Dynamic Logical PartitioningB、AIX 5.2 and Dynamic Logical PartitioningC、AIX 5.2 and Advanced POWER Virtualization featureD、AIX 5.3 and Advanced POWER Virtualization feature
考题
A small IT department is deploying Power 720 servers exploiting virtualization technologies. Each Power 720 will have two partitions, one with 6 cores and one with 2 cores, and both partitions having 32GB of memory each. Live Partition Mobility is being considered at some point in the future. What is the minimum AIX Edition required to support the customer?()A、AIX Basic EditionB、AIX Express EditionC、AIX Standard EditionD、AIX Enterprise Edition
考题
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()A、p5 hardware, AIX 5.2, Virtual I/O ServerB、POWER4 hardware, AIX 5.3, Virtual I/O Server,C、p5 hardware, AIX 5.3, Advanced POWER Virtualization featureD、POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
考题
A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%. Which of the following supports this requirement?()A、Active Memory ServerB、Active Memory SharingC、Active Memory PoolingD、Active Memory Expansion
考题
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.
考题
A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future. Which pSeries system would be positioned best to meet this customer’s requirements?()A、p5-550 with the Advanced POWER Virtualization feature and AIX 5.2B、p5-550 with the POWER5 processor technology and AIX 5.2C、p5-570 with the Advanced POWER Virtualization feature and AIX 5.3D、p5-570 with the POWER5 processor technology and AIX 5.2
考题
Micro-Partitioning can be defined as().A、multiple partitions that share the processing power of a set of physical processors where a partition can be assigned as little as 1/2 of a physical processor's resource. B、multiple partitions that share the processing power of a set of physical processors where a partition can be assigned as little as 1/100th of a physical processor's resource. C、an advanced virtualization feature of POWER5 systems with Linux (SUSE and Red Hat for POWER) and AIX 5L Version 5.3 that allows multiple partitions to share the processing power of a set of physical processors. D、an advanced virtualization feature of POWER5 systems with Linux (SUSE and Red Hat for POWER) and AIX 5L Version 5.2 or 5.3 that allows multiple partitions to share the processing power of a set of physical processors.
考题
A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the 64 active cores, and will use it in multiple partitions. How can the customer ensure that the number of licenses purchased for DB2 is not exceeded?()A、Create a 32-core shared processor pool for the DB2 partitions.B、Limit the number of virtual processors on each DB2 partition to 32.C、Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.D、Set the ‘Desired Processing Units’ in each DB2 partition profile so that the sum of all partitions equals 32.
考题
Which functionality would a customer use to share available CPU resources between AIX and Linux partitions on a Power system?()A、 Dynamic LPARB、 Micro PartitionsC、 Entitled capacityD、 Multiple Shared Processor Pools
考题
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()A、Install a p615 per application.B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.C、Install the appropriate solution once the requirements are understood.D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.
考题
A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()A、The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.B、The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.C、The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.D、The POWER5 system supports more partitions and has the lowest partitioning overhead.
考题
An IT director needs to deploy 3 partitions, each using dedicated internal boot disk. Which system will support the customer requirement using the least amount of rack space?()A、Power 770 serversB、Power 750 serversC、Power 755 serversD、Power 720 servers
考题
单选题A customer has two Power 770 systems with 4 enclosures each. Thirty two cores and 1TB of memory are activated on each system. Each system has 3 database partitions and each partition has 10 cores and 300GB of memory. Which solution will provide automated recovery of unplanned outages at least cost?()A
Purchase PowerVM Enterprise Edition.Use System Director to automate Live Partition Mobility to recover from partition failureB
Create additional shared processor partitions as standby nodes.Use PowerHA SystemMirror to activate and use CoD resources when a failover occursC
Purchase an additional 32-core Power 750 with PowerHA SystemMirror Standard Edition.Use the new system as standby node with the XD component of PowerHAD
Purchase an additional Power 770 system.Locate production and standby database partitions on each system.Use DB2 pureScale to provide automated partition monitoring and failover
考题
单选题Company.com with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing the installation of the operating system. Which of the following should the customer perform?()A
Use alt_disk_install to install AIX on all logical partitions.B
Configure the DVD as a desired resource on all partitions.C
Configure all resources as shared resources between all partitions.D
Create a separate NIM server to manage the installation of all partitions.
考题
单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB
Use DLPAR to move resources from the test LPAR to training when training is activeC
Install Partition Load Manager to share resources between the test and training environmentsD
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
考题
单选题Which functionality would a customer use to share available CPU resources between AIX and Linux partitions on a Power system?()A
Dynamic LPARB
Micro PartitionsC
Entitled capacityD
Multiple Shared Processor Pools
考题
单选题A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future. Which pSeries system would be positioned best to meet this customer’s requirements?()A
p5-550 with the Advanced POWER Virtualization feature and AIX 5.2B
p5-550 with the POWER5 processor technology and AIX 5.2C
p5-570 with the Advanced POWER Virtualization feature and AIX 5.3D
p5-570 with the POWER5 processor technology and AIX 5.2
考题
单选题A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()A
The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.B
The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.C
The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.D
The POWER5 system supports more partitions and has the lowest partitioning overhead.
考题
单选题A small IT department is deploying Power 720 servers exploiting virtualization technologies. Each Power 720 will have two partitions, one with 6 cores and one with 2 cores, and both partitions having 32GB of memory each. Live Partition Mobility is being considered at some point in the future. What is the minimum AIX Edition required to support the customer?()A
AIX Basic EditionB
AIX Express EditionC
AIX Standard EditionD
AIX Enterprise Edition
考题
单选题A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potential vendor software costs?()A
Create capped partitions for the database servers.B
Create workload partitions for the database servers.C
Create a separate shared processor pool for the database servers.D
Create virtual processors equal to the entitlement for database servers.
考题
单选题A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()A
p5 hardware, AIX 5.2, Virtual I/O ServerB
POWER4 hardware, AIX 5.3, Virtual I/O Server,C
p5 hardware, AIX 5.3, Advanced POWER Virtualization featureD
POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
考题
单选题A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A
PowerVM Lx86B
PowerVM Express EditionC
PowerVM Standard EditionD
PowerVM Enterprise Edition
考题
单选题A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback. There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future. The customer has asked the pSeries technical specialist to recommend anything else that may be needed. Which of the following should be recommended in this situation?()A
HMCB
DVD-ROMC
Tape driveD
Network switch
考题
单选题A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications. Each partition requires two of the following: OS boot drives, fiber adapters, and gigabit Ethernet adapters. The customer has an HMC with an available serial port. In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()A
One 7311-D20 drawerB
Two 7311-D20 drawersC
Two 7311-D10 drawersD
One 7311-D10 drawers
热门标签
最新试卷