网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
()the head line down to 2 meters above water.
A

Send

B

Put

C

Let

D

Heave


参考答案

参考解析
解析: 暂无解析
更多 “单选题()the head line down to 2 meters above water.A SendB PutC LetD Heave” 相关考题
考题 if you want to change the position of the head line forward for 3 meters, what do you say?

考题 if you want to heave tight the breast line, what should you say?

考题 Which line from the output of the show ip interface command indicates that there is a Layer 1 problem?A.Serial0/1 is up, line protocol is downB.Serial0/1 is down, line protocol is downC.Serial0/1 is up, line protocol is upD.Serial0/1 is administratively down, line protocol is downE.None of the above

考题 SINGLE UP FORWARD TO HEAD LINE AND SPRING means ______.A.let go all the lines forward including head line and springB.let go the head line and spring onlyC.let go all the lines except a head line and a springD.let go the head line and spring including all the lines

考题 EXCEPT when suffering from a head or chest injury a patient in shock should be placed in which position? ______.A.Head up and feet downB.Head down and feet upC.Flat on back with head and feet elevatedD.Arms above the head

考题 A patient in shock should NOT be placed in which position?A.On their side if unconsciousB.Head down and feet up,no injuries to face or headC.Flat on their back with head and feet at the same levelD.Arms above their head

考题 Your tanker is fully loaded,and you find that she is down slightly by the head.To adjust the trim,you may ______.A.Add ballast aftB.Load more cargo aftC.Shift cargo aftD.All of the above

考题 “Ease the strain on the stern line” means “()”!A、Heave away the stern line.B、Take in the stern line.C、Slack the stern line.D、Heave in the stern line.

考题 ()the head line down to 2 meters above water.A、SendB、PutC、LetD、Heave

考题 Send the headline down to 2 meters above water. ()A、把头缆送到离水面2米。B、把水上的头缆挪前2米。C、把水中的头缆挪前2米。D、把头缆往水中挪前2米。

考题 Take the tug towing line to (),then heave away easy.A、captainB、windlassC、carpenterD、capstan

考题 ()(收紧) the slack on the stern line.A、Heave outB、Take inC、Pick inD、Heave away

考题 收紧尾缆 。()A、Take in stern line .B、Pay out stern line .C、Heave in stern line .D、Take in the slack on stern line .

考题 头缆上车!()A、Put head line on winch!B、Put stern line on winch!C、Hold on head line!D、Heave in head line.

考题 ()port anchor, one shackle in water.A、Heave inB、Cast offC、Let goD、Heave away

考题 ()(送出) two head lines ,one from each side.A、Heave awayB、Give outC、Take inD、Take away

考题 单选题船艏单绑留头缆!()A Single up forward to headline!B All let go aft!C Send out head line!D Hold on the head line!

考题 单选题EXCEPT when suffering from a head or chest injury a patient in shock should be placed in which position?().A Head up and feet downB Head down and feet upC Flat on back with head and feet elevatedD Arms above the head

考题 单选题Heights are expressed()meters above mean high water.A inB onC byD with

考题 单选题Send the headline down to 2 meters above water. ()A 把头缆送到离水面2米。B 把水上的头缆挪前2米。C 把水中的头缆挪前2米。D 把头缆往水中挪前2米。

考题 单选题The static suction head of is the ()A distance of the suction liquid level above the line of the pumpB distance the suction liquid level is below the center line of the pumpC force necessary to overcome frictional losses in the pump and pipingD amount in inches of mercury the total suction head is below atmospheric pressure

考题 单选题SINGLE UP FORWARD TO HEAD LINE AND SPRING means().A let go all the lines forward including head line and springB let go the head line and spring onlyC let go all the lines except a head line and a springD let go the head line and spring including all the lines

考题 单选题Your tank vessel is fully loaded, and you find that she is down slightly by the head. To adjust the trim, you may().A add ballast aftB load more cargo aftC shift cargo aftD All of the above

考题 单选题A patient in shock should NOT be placed in which position? ()A On their side if unconsciousB Head down and feet up,no injuries to face or headC Flat on their back with head and feet at the same levelD Arms above their head

考题 单选题()the head line down to 2 meters above water.A SendB PutC LetD Heave

考题 单选题头缆上车!()A Put head line on winch!B Put stern line on winch!C Hold on head line!D Heave in head line.

考题 单选题Take the tug towing line to (),then heave away easy.A captainB windlassC carpenterD capstan

考题 单选题The joint of the riser in a marine riser system that compensates for heave,the up-and-down motion of a floater,is the().A flex jointB slip jointC heave jointD riser joint