网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The development of the container system().
A

makes a cargo reach the farthest destination

B

makes the ship go as far as she can

C

is the most significant change in shipping industry

D

is the most economical change in shipping industry


参考答案

参考解析
解析: 暂无解析
更多 “单选题The development of the container system().A makes a cargo reach the farthest destinationB makes the ship go as far as she canC is the most significant change in shipping industryD is the most economical change in shipping industry” 相关考题
考题 According to the passage, ______ has become the driving force for the development of telephone system?A.information technologiesB.InternetC.PCD.convergence of telecommunications technologies

考题 In the system development process,modularity is a very well-established principle used in the______phase.A.designB.analysisC.implementationD.testing

考题 according to the author, who was to be credited for the development of the “american system of production“ in the early nineteenth century?A. John H. Hall.B. Henry Ford.C. Eli Whitney.D. Thomas Edison.

考题 短文理解听力原文: The banking system of China evolved from a mono-banking system between the 1940s and the early 1970s. Not until 1978 did China's banking system make a drastic shift in its banking philosophy and structure. The shift is not only a necessity for the country's development, but also acts as a gesture showing the "openness" of the country to the outside world.Today, after nearly forty years of rapid development, China is moving towards a modem and market-oriented banking structure although there is still much to be improved to meet the needs of the country's development.In the mid 1990s, banks in China began to focus their attention on capital adequacy requirements, non-performing and bad loans, profitability and also the industry's overall expansion strategy. Reforms of monetary and financial system in China are speeding up in the 90s. Existing specialized banks gradually have become commercial banks.21. What kind of banking system did China have before the 1980s?22.Up to now, how long has China experienced rapid development?23.What are the banks in China focusing their attention on?(21)A.The same system as in the western countries.B.A mono-banking system.C.A modern banking system.D.A commercial banking system.

考题 Which three statements are true about the working of system privileges in a multitenant control database(CDB) that has pluggable databases (PDBs)?() A. System privileges apply only to the PDB in which they are used.B. Local users cannot use local system privileges on the schema of a common user.C. The granter of system privileges must possess the set container privilege.D. Common users connected to a PDB can exercise privileges across other PDBs.E. System privileges with the with grant option container all clause must be granted to a common user before the common user can grant privileges to other users.

考题 In discussing the U.S. jury system, the text centers on( )[A] its nature and problents[B] its characteristics and tradition[C] its problems and their solutions[D] its tradition and development

考题 In the system development process,______and pseudo code are tools used by programmers in theimplementation phase.A.listchartB.structchartC.topologychartD.flowchart

考题 A deck-stowed 40-foot container is giving off smoke,and one end is discolored from heat. The cargo is valuable and easily damaged by water. You want to extinguish the fire without further damage if possible. What action should you take? ______.A.Connect a portable line from the ship's fixed system and discharge CO2 into the containerB.Flood the container with water and disregard any cargo damage as the fire threatens the entire vesselC.Pierce the container and discharge 6 or more portable CO2's then add more CO2 hourlyD.Cool the exterior of the container with water and close all vents; then keep it cooled until it can be off-loaded

考题 To establish the evaluation index system of evaluation of students' all-round development must include__________ .A.subject learning goals B.general development goals C.subject learning goals and general development goals D.emotional goals

考题 A project is a[temporary](请作答此空)of unique,complex,and connected activities having one goal or purpose and that must be completed by a specific time,within budget,and according to( ).Project management is the process of scoping,planning,staffing,organizing,directing,and controlling the development of a(n)( )system at a minimum cost within a specified time frame.For any systems development project,effective project management is necessary to ensure that the project meets the( ),is developed within an acceptable budget,and fulfills customer expectations and specifications,Project management is a process that starts at the beginning of a project,extends through a project,and doesn't culminate until the project is completed.The prerequisite for good project management is a well-defined system development process.Process management is an ongoing activity that documents,manages the use of,and improves an organization s chosen methodology(the“process”)for system development,Process management is concerned with the activities,deliverables,and quality standards to be applied to( )project(s).A.task B.work C.sequence D.activity

考题 During the systems analysis phase, greater user involvement usually results in better communication, faster development times, and more satisfied users.There are three common team-based approaches that encourage system users to participate actively in various development tasks.1) () is a popular fact-finding technique that brings users into the development process as active participants. The end product of the approach is a requirements model.2) (请作答此空 ) is a team-based technique that speeds up information systems development and produces a functioning information system. The approach consists of several phases. The () combines elements of the systems planning and systems analysis phases of tbe SDLC.Users, managers, and IT staff members discuss and agree on business needs, project scope, constraints, and system requirements. During (), users interact with systems analysts and develop models and prototypes that represent all system processes, outputs, and inputs.3) () attempt to develop a system incrementally by building a series of prototypes and constantly adjusting them to user requirements.A.Object-oriente development 面向对象开发 B.Model-driven development 模型驱动开发 C.RapiD.application development 快速应用开发 D.Commercial Application package 商业套件

考题 During the systems analysis phase, greater user involvement usually results in better communication, faster development times, and more satisfied users.There are three common team-based approaches that encourage system users to participate actively in various development tasks.1) () is a popular fact-finding technique that brings users into the development process as active participants. The end product of the approach is a requirements model.2) () is a team-based technique that speeds up information systems development and produces a functioning information system. The approach consists of several phases. The () combines elements of the systems planning and systems analysis phases of tbe SDLC.Users, managers, and IT staff members discuss and agree on business needs, project scope, constraints, and system requirements. During (), users interact with systems analysts and develop models and prototypes that represent all system processes, outputs, and inputs.3) (请作答此空 ) attempt to develop a system incrementally by building a series of prototypes and constantly adjusting them to user requirements.A.Agile methods 敏捷方法 B.The FAST framework 快速框架 C.Reverse Engineering 逆向工程 D.Reengineering 重构

考题 During the systems analysis phase, greater user involvement usually results in better communication, faster development times, and more satisfied users.There are three common team-based approaches that encourage system users to participate actively in various development tasks.1) () is a popular fact-finding technique that brings users into the development process as active participants. The end product of the approach is a requirements model.2) () is a team-based technique that speeds up information systems development and produces a functioning information system. The approach consists of several phases. The (请作答此空) combines elements of the systems planning and systems analysis phases of tbe SDLC.Users, managers, and IT staff members discuss and agree on business needs, project scope, constraints, and system requirements. During (), users interact with systems analysts and develop models and prototypes that represent all system processes, outputs, and inputs.3) () attempt to develop a system incrementally by building a series of prototypes and constantly adjusting them to user requirements.A.requirements planning phase 需求计划阶段 B.business process modeling 业务流程建模 C.business process improvement 业务流程优化 D.scope definition phase 范围定义阶段

考题 During the systems analysis phase, greater user involvement usually results in better communication, faster development times, and more satisfied users.There are three common team-based approaches that encourage system users to participate actively in various development tasks.1) (请作答此空) is a popular fact-finding technique that brings users into the development process as active participants. The end product of the approach is a requirements model.2) () is a team-based technique that speeds up information systems development and produces a functioning information system. The approach consists of several phases. The () combines elements of the systems planning and systems analysis phases of tbe SDLC.Users, managers, and IT staff members discuss and agree on business needs, project scope, constraints, and system requirements. During (), users interact with systems analysts and develop models and prototypes that represent all system processes, outputs, and inputs.3) () attempt to develop a system incrementally by building a series of prototypes and constantly adjusting them to user requirements.A.Questionnaires 问卷调查 B.Joint application development 联合应用开发 C.Interviews 访谈 D.Prototyping 原型设计

考题 Which service component in a detailed design development focuses on identification and configuration of the actual network components (routers, servers, local-area networks, and so on) to be incorporated to run and support a Cisco Unified Communications system. ()A、System Design WorkshopB、Feature and Functionality Design WorkshopC、Device-level Design WorkshopD、Physical Design Workshop

考题 教学系统系统开发(instructional system design development)

考题 which of the following is not true about the classification of the cantainers?()A、containers are classified as general purpose (dry cargo) container and specific purpose containerB、general purpose container (GP) is suitable for the widest varieties of cargoC、specific purpose container is suitable for the specific cargoD、bulk container, reefer container, open-top container are all general purpose containers

考题 Which service components develops a plan that identifies the necessary steps to move from an existing system to the Cisco Unified Communications system()A、Migration Plan DevelopmentB、Detailed Design DevelopmentC、Staging Plan DevelopmentD、Implementation Plan Development

考题 A system administrator has been asked to migrate the dev_vg volume group from server A to server B. The dev_vg volume group contains a single filesystem named "/development". To prepare for migration, which of the following is the correct sequence of commands for removing the volume group from server A?()A、exportvg dev_vg; umount /development; varyoffvg dev_vgB、varyoffvg dev_vg; umount /development; exportvg dev_vgC、umount /development; exportvg dev_vg; varyoffvg dev_vgD、umount /development; varyoffvg dev_vg; exportvg dev_vg

考题 A System p admistrator must document the date of the latest update of the development systems. Which of the following commands will provide this information ()A、lppchk -lB、lslpp -hC、installp -hD、lppchk -v

考题 A system administrator has determined that the /development filesystem needs to be changed from JFS to JFS2 to take advantage of the new capabilites available in JFS2. What is the method to convert the /development filesystem from type JFS to JFS2?()A、Umount the /development filesystem and remount it using the following command: mount -t jfs2 /developmentB、Edit the /etc/filesystems file to change the type paramter to "jfs2" and change the log parameter to "jfs2log"C、Backup the /development filesystem data, delete the JFS /development filesystem, create the new JFS2 /development filsystem, and restore the data to the /development filesystemD、Backup the /development filesystem data, change the /development filesystem using the following command,chfs -t type=jfs2 /development.then, restore the data to the /development filesystem

考题 Which three statements are true about the working of system privileges in a multitenant control database(CDB) that has pluggable databases (PDBs)?()A、System privileges apply only to the PDB in which they are used.B、Local users cannot use local system privileges on the schema of a common user.C、The granter of system privileges must possess the set container privilege.D、Common users connected to a PDB can exercise privileges across other PDBs.E、System privileges with the with grant option container all clause must be granted to a common user before the common user can grant privileges to other users.

考题 You manage Hyper-V host servers and virtual machines (VMs) by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. Developers are members of an AD security group named  Development. You need to ensure that on a specific host server, members of the Development group can perform only the Create,Modify,and Remove VM management tasks. What should you do?()A、Create a Self-Service user role and add the Development group to this role.B、Create a Delegated Administrator user role and add the Development group to this role.C、In Authorization Manager, create a role on the client computer of each member of the Development group, and add the Development group to this role.D、Install Hyper-V Manager on the client computer of each member of the Development group,and grant the Development group administrative privileges on the specific server.

考题 单选题To establish the evaluation index system of evaluation of students’ all-round development must include _____.A subject learning goalsB general development goalsC subject learning goals general development goalsD emotional goals

考题 单选题A system administrator has determined that the /development filesystem needs to be changed from JFS to JFS2 to take advantage of the new capabilites available in JFS2. What is the method to convert the /development filesystem from type JFS to JFS2?()A Umount the /development filesystem and remount it using the following command: mount -t jfs2 /developmentB Edit the /etc/filesystems file to change the type paramter to jfs2 and change the log parameter to jfs2logC Backup the /development filesystem data, delete the JFS /development filesystem, create the new JFS2 /development filsystem, and restore the data to the /development filesystemD Backup the /development filesystem data, change the /development filesystem using the following command,chfs -t type=jfs2 /development.then, restore the data to the /development filesystem

考题 多选题Which three statements are true about the working of system privileges in a multitenant control database(CDB) that has pluggable databases (PDBs)?()ASystem privileges apply only to the PDB in which they are used.BLocal users cannot use local system privileges on the schema of a common user.CThe granter of system privileges must possess the set container privilege.DCommon users connected to a PDB can exercise privileges across other PDBs.ESystem privileges with the with grant option container all clause must be granted to a common user before the common user can grant privileges to other users.

考题 单选题You manage Hyper-V host servers and virtual machines (VMs) by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. Developers are members of an AD security group named  Development. You need to ensure that on a specific host server, members of the Development group can perform only the Create,Modify,and Remove VM management tasks. What should you do?()A Create a Self-Service user role and add the Development group to this role.B Create a Delegated Administrator user role and add the Development group to this role.C In Authorization Manager, create a role on the client computer of each member of the Development group, and add the Development group to this role.D Install Hyper-V Manager on the client computer of each member of the Development group,and grant the Development group administrative privileges on the specific server.