网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
We had lashed deck cargo before the gale came.()
A

要来大风了,我们在绑甲板货。

B

下班前,我们绑好了甲板货。

C

大风到来之前,我们就已经绑扎好了甲板货。

D

大风到来之前,我们就已经绑扎好了袋装货。


参考答案

参考解析
解析: 暂无解析
更多 “单选题We had lashed deck cargo before the gale came.()A 要来大风了,我们在绑甲板货。B 下班前,我们绑好了甲板货。C 大风到来之前,我们就已经绑扎好了甲板货。D 大风到来之前,我们就已经绑扎好了袋装货。” 相关考题
考题 Sunday was going to be the birthday for me and my other two classmates. As we were born in the (21) month,we decided to have a big party to (22) it.On that evening,we invited all of our classmates. We prepared a lot of food and drinks.After singing the birthday song,we (23) the delicious cake together. We sang more songs and played games. Then someone told funny stories,and (24) laughed. Three hours flew by quickly.Because we had to (25) before 11:00,we ended our party at 10:00. Before we left,our classmates gave' (26 )0f us a birthday card with their best wishes. ( 27) we took some pictures together. What a great time we had! At that moment,l felt love,happiness and friend- ship.Before the party,only my (28) could remember my birthday,and l had never had such a big party and so many friends wishes.(29) I wanted to say to my classmates,"Thank you,and I will (30) forget this evening,especially each of you!( )21.A.differentB.bestC.sameD.some

考题 John and I ______ friends for eight years. We first went to know each other at a Christmas party. But we ______ each other a couple of times before that. A had been; have seenB have been; have seenC had been; had seenD have been; had seen

考题 My husband lived at home before we were married, and so______.A、did IB、had IC、I hadD、I did

考题 It was not long before she came.()

考题 I’d rather we ____ the plan in detail before we carry it out.A、shall discussB、must discussC、discussedD、had discussed

考题 To "shore up" the main deck for the stowage of deck cargo means to ______.A.weld pad eyes on deck in proper position to secure the cargoB.strengthen the main deck by placing pillars underneath it in the tween-decksC.distribute the weight of the cargo by placing fore-and-aft planks on the main deckD.package the cargo in wooden crates so it will not damage the deck

考题 When stowing hazardous materials on deck,lashing of such cargo is permitted if ______.A.A wooden bin is constructed of at least 2-inch dunnage and bolted togetherB.The cargo is lashed to the adjacent guard railsC.The lashings are secured to deck pad eyesD.There is at least 3 inches of dunnage on deck

考题 ______ is not a proper procedure for a lashing of the timber deck cargo.A.to be efficiently attached to the deck stringer plate or other strengthened pointsB.to pass over the timber deck cargoC.to be shackled to eye platesD.to be applied not contacting with the timber deck cargo

考题 You are loading a cargo of bagged coffee beans.To keep cargo leakage from being contaminated by the ship's structure,you should ______.A.use separation cloths between the deck and cargoB.place the cargo on a layer of spaced dunnageC.hose down the deck before loading the cargoD.use bag-on-bag stowage

考题 Before discharge of cargo tank ballast is undertaken,______.A.the deck isolating valve is openB.flue gas isolating valveC.blower suction valveD.blower discharge valve

考题 It is possible,and sometimes necessary,to strengthen the deck of a vessel for carriage of deck cargo by ______.A.placing bunker on the deckB.building a stage on which to place the cargoC.welding steel feet to the deck,on which the cargo is placedD.erecting vertical pillars under the deck to support the cargo

考题 Everybody on board was worried and we were curious to find out what had happened.A: wood B:meeting C:sign D:deck

考题 ______ before we depart the day aftertomorrow, we should have a wonderful dinner party.A.Had they arrived B.Were they arriving C.Would they arrive D.Were they to arrive

考题 挽牢首、尾缆,放登艇梯。()A、Make fast the fore and aft ropes and lay out the embarkation ladder.B、Each cargo should be securely lashed.C、We’ll start loading right now.D、Make fast the heaving rope, lay out the embarkation ladder.

考题 We had lashed deck cargo before the gale came.()A、要来大风了,我们在绑甲板货。B、下班前,我们绑好了甲板货。C、大风到来之前,我们就已经绑扎好了甲板货。D、大风到来之前,我们就已经绑扎好了袋装货。

考题 我们经常保养甲板机械。()A、We often maintain deck machinery.B、We often repair deck machinery.C、We often clean and paint deck.D、We often adjust deck machinery.

考题 (),we would have finished it then.A、If had we had better equipmentB、Had we had better equipmentC、Had had we better equipmentD、We had had better equipment

考题 我们正在装危险货。()A、We are loading flammable cargo.B、We are loading dangerous cargo.C、We are discharging flammable cargo.D、We are discharging dangerous cargo.

考题 We are loading ()(危险货)now.A、flammable cargoB、dangerous cargoC、deck cargoD、packed cargo

考题 The ()(桶装货) should be loaded by cargo net.A、bagged cargoB、drummed cargoC、cased cargoD、deck cargo

考题 ()(湿货)must be kept away from dry cargo.A、Light cargoB、Wet cargoC、Heavy cargoD、Deck cargo

考题 单选题Petroleum cargo tanks should not be topped off at deck level when loading on a cold day because().A a subsequent temperature rise will cause the cargo to overflowB air pockets may cause the cargo to bubble out of the ullage holeC the increased viscosity of the product requires higher loading pressure which increases the chances of a spillD the tank valve may be stiff and a spill will occur before the valve can be closed

考题 单选题We ______ a sports meeting the day before yesterday.A hadB haveC have had

考题 单选题It is possible,and sometimes necessary,to strengthen the deck of a vessel for carriage of deck cargo by().A placing bunker on the deckB building a stage on which to place the cargoC welding steel feet to the deck,on which the cargo is placedD erecting vertical pillars under the deck to support the cargo

考题 单选题We’ll finish ()cargo before long.A loadingB loadC loadedD loads

考题 单选题In the stowage of deck cargo, cribbing is().A placed on deck to support the cargoB separation pieces used to keep cylinders upright and steadyC shims for stowing balded cargoD nets placed across the hatch opening to keep the cargo from falling in the hatch

考题 单选题To “shore up” the main deck for the stowage of deck cargo means to().A weld pad eyes on deck in proper position to secure the cargoB strengthen the main deck by placing pillars underneath it in the tween-decksC distribute the weight of the cargo by placing fore-and-aft planks on the main deckD package the cargo in wooden crates so it will not damage the deck