On a cargo vessel, fire and boat drills must be held within 24 hours of leaving port if the percentage of the crew replaced is more than ().
A

5%

B

10%

C

25%

D

40%


参考答案

参考解析
解析: 暂无解析
更多 “单选题On a cargo vessel, fire and boat drills must be held within 24 hours of leaving port if the percentage of the crew replaced is more than ().A 5%B 10%C 25%D 40%” 相关考题
考题 At the earliest indication of fire aboard your vessel, you must FIRST ______.A.locate the fireB.determine which type of fire is burningC.sound the alarmD.fight the fire

考题 ______ of the following statements is INCORRECT regarding a fire and boat drill on board your cargo vessel.A.At least one fire and boat drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replacedB.The Master is responsible in seeing that each lifeboat is lowered to the water at least once in each 6 months.C.Lifeboat equipment shall be examined at least once each month to insure that it is completeD.An entry shall be made in the vessel's Official Logbook relative to each fire and boat drill

考题 After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or______.A.within 4 days after the seaman's dischargeB.prior to the vessel's departure on the next voyageC.prior to loading any out-bound cargoD.prior to any change of Master

考题 Prior to getting underway,the Master or person in charge of a vessel must ______.A.conduct a fire drillB.conduct a boat drillC.log the fore and aft draft marksD.test the emergency generator

考题 You are on a cargo vessel carrying toluol in bulk in portable tanks. Which is a requirement for pumping the toluol?A.Hose connections to the tank must be made with a minimum of three boltsB.There must be water pressure on the fire mainC.You must shut down if another vessel comes alongsideD.If transferring at anchor,you must display a red flag by day and a red light at night

考题 Fire protection regulations for towing vessels require that drills be conducted on board the vessel as if there were an actual emergency.Drills include all of the following,EXCEPT ______.A.testing all alarm and detection systemsB.breaking out and using the vessel's emergency equipmentC.participation by selected crew membersD.one person putting on protective clothing,if the vessel is so equipped

考题 Oceangoing dry bulk cargo vessels over 1000 GT must have approved combination-type fire nozzles at all ______.A.Fire stations aboard the vessel,except for those in open deck areas weatherdeck and cargo hold fire stationsB.Interior fire stationsC.Engine room fire stationsD.All of the above

考题 A fire hose with a nozzle attached must be connected to each hydrant except when exposed to heavy weather or when the ______.A.Fire hose might be damaged by cargo operationsB.Vessel is in portC.Fire-main system is not chargedD.Fire pumps are used for purposes other than supplying water to the fire main

考题 单选题If you are fighting a fire below the main deck of your vessel,which action is most important concerning the stability of the vessel?().A Shutting off electricity to damaged cablesB Pumping fire-fighting water overboardC Maneuvering the vessel so the fire is on the lee sideD Removing burned debris from the cargo hold

考题 单选题Once a vessel has loaded packaged hazardous cargo,the cargo spaces shall be inspected. The spaces shall also be inspected at least once in every 24 hours. The only exception to daily inspection is when().A a vessel is equipped with an automatic smoke or fire detecting systemB the cargo hatches are of steel constructionC the cargo is of a nonflammable typeD there is sufficient fire protection located on the main deck adjacent to the cargo hatch

考题 单选题A facility used for the discharge of a cargo of a particular hazard,such as chlorine,butane or ethane,must have what to warn water traffic of an immediate danger during fire or cargo release?()A An emergency boat and crewB A siren or rotating flashing lightC Flashing red lights located one-half mile upstream and downstream of the facilityD Buoys with flashing lights controlled from shore,located one-half mile upstream anddownstream of the facility

考题 单选题Prior to getting underway,the Master or person in charge of a vessel must().A conduct a fire drillB conduct a boat drillC log the fore and aft draft marksD test the emergency generator

考题 单选题You are on a cargo vessel carrying toluol in bulk in portable tanks. Which is a requirement for pumping the toluol? ()A Hose connections to the tank must be made with a minimum of three boltsB There must be water pressure on the fire mainC You must shut down if another vessel comes alongsideD If transferring at anchor,you must display a red flag by day and a red light at night

考题 单选题Oceangoing dry bulk cargo vessels over 1000 GT must have approved combination-type fire nozzles at all().A fire stations aboard the vessel,except for those in open deck areas weatherdeck and cargo hold fire stationsB interior fire stationsC engine room fire stationsD all of the above

考题 单选题If you are fighting a fire below the main deck of your vessel,which action is most importantconcerning the stability of the vessel? ()A Shutting off electricity to damaged cablesB Pumping fire-fighting water overboardC Maneuvering the vessel so the fire is on the lee sideD Removing burned debris from the cargo hold

考题 单选题Records of tests and inspections of a cargo vessel’s fire extinguishing systems shall be()on board until the vessel’s Certificate of Inspection expires.A consealedB detainedC containedD kept

考题 单选题Records of tests and inspections of a cargo vessel’s fire extinguishing systems shall be kept on board().A for 1 yearB for 2 yearsC until the next Coast Guard inspectionD until the vessel's Certificate of Inspection expires

考题 单选题Fire protection and manning regulations for towing vessels state that the Master or person in charge must ensure that all crew members who have not participated in the drills or received the safety orientation().A receive a safety orientation or view a videotape before the vessel gets underwayB view a videotape on safety procedures within 48 hours of reporting for dutyC receive a safety orientation within 24 hours of reporting for dutyD none of the above

考题 单选题Fire protection regulations for towing vessels require that drills be conducted on board the vessel as if there were an actual emergency. Drills include all of the following,EXCEPT().A testing all alarm and detection systemsB breaking out and using the vessel's emergency equipmentC participation by selected crew membersD one person putting on protective clothing,if the vessel is so equipped

考题 单选题A fire and boat drill on a tank vessel shall, by regulation, include ().A starting the fire pumpsB checking firemans outfits and other personnel rescue equipmentC checking relevant communications equipmentD All of the above

考题 单选题According to regulations,access to a cargo pumproom in a tank vessel carrying grades C or D liquid cargo shall be().A from areas equipped with power ventilationB only from enclosed areas free from sources of vapor ignitionC from the open deckD from within the vessel

考题 单选题Which space(s) on your cargo vessel must have a fire detection system?()A Any compartment containing explosivesB Any compartment adjacent to one containing explosivesC Enclosed spaces which are specially suitable for vehiclesD All of the above

考题 单选题On a cargo vessel, fire and boat drills must be held within 24 hours of leaving port if the percentage of the crew replaced is more than ().A 5%B 10%C 25%D 40%

考题 单选题At the earliest indication of fire aboard your vessel, you must FIRST().A locate the fireB determine which type of fire is burningC sound the alarmD fight the fire

考题 单选题Shipboard Emergency Drills must be carried out at least()on board cargo ship.A Once every third yearB Once a monthC Once a yearD Once a week

考题 单选题Fire and boat drills are carried out ().A periodicallyB quarterlyC monthlyD yearly

考题 单选题()of the following statements is incorrect regarding a fire and boat drill ao board your cargo vessel.A At least one fire and drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replacedB The Master is responsible in seeing thst each lifeboat is lowered to the water at least once in each 6 monthsC Lifeboat equipment shall be examined at least once each month to insure that it is completeD An entry shall be made in the vessels official Logbook relative eo each fire and boat drill

考题 单选题Prior to getting underway,the Master or person in charge of a ship must().A conduct a fire drillB conduct a boat drillC log the fore and aft draft marksD test the emergency generator