网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()
A
The resources must be unallocated in an LPAR
B
The microcode on the pSeries must be current
C
All network adapters on the LPAR must be defined
D
Network connectivity and name resolution capability between HMC and LPARs
参考答案
参考解析
解析:
暂无解析
更多 “单选题Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A The resources must be unallocated in an LPARB The microcode on the pSeries must be currentC All network adapters on the LPAR must be definedD Network connectivity and name resolution capability between HMC and LPARs” 相关考题
考题
Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()A、APV, AIX5.2ML4B、AIX5.3 or i5/OSC、APV, i5/OS, AIX5.3D、APV, AIX5.3 or SuSE9
考题
After installing a new p5 595, the system performs poorly. Which of the following services would provide updates needed to fix the problem?()A、AlertB、Fix CentralC、Software MaintenanceD、Performance Monitoring
考题
Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs. What is the best hardware to propose to keep the software cost low?()A、A 24 way p5 595 with 3 LPARsB、A 24 way p5 595 with 2 LPARsC、One p5 570s 16 way and one p5 570 8 wayD、One p5 595 12 way active and 12 way inactive, and one p5 570 8 way
考题
Companycom is migrating from a p690 to a p5 595 utilizing APV Virtual IO features. They have created their profiles for their two Virtual IO Servers. The first Virtual IO Server is installed and running. When trying to DLPAR the DVD/ROM the task fails on the HMC. What is the probable cause?()A、APV key is not registeredB、Networking and DNS are not configuredC、/etc/hosts table on HMC is not configuredD、Virtual IO Server dose not support DLPAR
考题
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A、The resources must be unallocated in an LPARB、The microcode on the pSeries must be currentC、All network adapters on the LPAR must be definedD、Network connectivity and name resolution capability between HMC and LPARs
考题
Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?() A、APV features are not supported for some legacy POWER4 adaptersB、APV will require the most current maintenance level for AIX 5.2C、APV features will require that legacy POWER4 adapters be updated with new microcodeD、The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3
考题
Companycom is considering a partitioned solution which will require cumulative rPerf total of 150. The original sizing came back recommending a 32-way p5 590. However, they have a requirement for future scalability and availability is important. Which of the following would be the best reason to recommend a p5 595?()A、The p5 595 would allow for CODB、The p5 595 includes the Advanced Power Virtualization hardware and softwareC、The p5 595 is priced the same as the p5 590 given the same number/type of CPUsD、The p5 595 performance would be equivalent to the p5 590 given the same number/type of CPUs
考题
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()A、Include a new HMC in the order to connect to the p5 595B、Include a pair of new HMCs in the order to connect to the p5 595C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilitiesD、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
考题
Companycom is migrating their application that was built on AIX 4.3, to a new p5 590 system that is running AIX 5.3. The application was a 32-bit program. What will need to be done with the application to allow it to run on the new system?()A、Run without recompiling on AIX 5.3B、Relink to the 32-bit kernel in order to run the applicationC、Recompile to run on AIX 5.3 because the libraries are in different locationsD、Recompile 32-bit applications because the compiler flags and versions have changed
考题
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()A、Upgrade the p690 to a p5 590 server running AIX 5.3B、Upgrade the p690 server to AIX 5.3 and implement Advanced Power VirtualizationC、Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adaptersD、Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
考题
Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()A、The server must be installed into a location with a raised floor for optimum system cooling and cable management.B、The server should be purchased as a p5 590 and then upgraded to a p5 595. This will eliminate the need for a raised floor environment.C、The server should be purchased as 32-way p5 595 and then upgraded to a 64-way. This will eliminate the need for a raised floor environment.D、The server can be installed into a location without a raised floor if an RPQ is obtained. It is a strong IBM recommendation for a raised floor, not a requirement.
考题
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A、VIO ServerB、AIX 5.2 ML4C、Shared Ethernet AdapterD、AIX 5.3 with Advanced Power Virtualization
考题
Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()A、128B、254C、320D、640
考题
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()A、Assign the adapter to an IO Hosting partitionB、Use AIX 5L affinity to move the application from SUSE to AIXC、Use AIX 5.3 drivers to install the adapter in the Linux LPARD、Assign the adapter to an AIX 5.3 partition running Linux Affinity
考题
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()A、4 processors 8GB of memoryB、5 processors 8GB of memoryC、4 processors 10GB of memoryD、5 processors 10GB of memory
考题
During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()A、The IBM CE will install the cardB、The card will not be supported by IBMC、The AIX device driver should work fineD、The customer is correct, there should be no problem
考题
Which server houses the database partitions in the AIX BCU V2.1? ()A、 IBM System p5 570 B、 IBM System p5 575 C、 IBM System p5 590 D、 IBM System p5 595
考题
单选题Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()A
APV, AIX5.2ML4B
AIX5.3 or i5/OSC
APV, i5/OS, AIX5.3D
APV, AIX5.3 or SuSE9
考题
单选题During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()A
The IBM CE will install the cardB
The card will not be supported by IBMC
The AIX device driver should work fineD
The customer is correct, there should be no problem
考题
单选题Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()A
128B
254C
320D
640
考题
单选题Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()A
4 processors 8GB of memoryB
5 processors 8GB of memoryC
4 processors 10GB of memoryD
5 processors 10GB of memory
考题
单选题Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A
The resources must be unallocated in an LPARB
The microcode on the pSeries must be currentC
All network adapters on the LPAR must be definedD
Network connectivity and name resolution capability between HMC and LPARs
考题
单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB
Use DLPAR to move resources from the test LPAR to training when training is activeC
Install Partition Load Manager to share resources between the test and training environmentsD
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
考题
单选题Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()A
Utilize the integrated 10/100/1000 network interfaceB
Implement Virtual Ethernet to enable inter-partition communicationC
Implement shared Ethernet with the Ethernet adapters utilized in the other LPARsD
Implement a Point to Point protocol serial communication between the p5 595 serial ports
考题
单选题Companycom has a p5 595 with no DVD configured on this server. How can they install the Virtual IO Server code?()A
From the HMCB
From a NFS mountC
From a FTP serverD
From any CD or DVD drive on another server
考题
单选题Which server houses the database partitions in the AIX BCU V2.1? ()A
IBM System p5 570 B
IBM System p5 575 C
IBM System p5 590 D
IBM System p5 595
考题
单选题One of the key decision making factors in a very competitive opportunity will be cost. Companycom needs an aggregate rPerf rating of 120. What is the best solution?()A
Two p5 570 16 way 1.9 MHz machinesB
One p5 590 32 way 1.65 MHz machinesC
One p5 595 32 way 1.65 MHz machinesD
Two p5 570 16 way 1.65 MHz machines
考题
单选题Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()A
Use alt_disk_installB
Backup image to NIM serverC
Backup using mksysb to DVD-RAMD
Apply the upgrade and do not commit
热门标签
最新试卷