An activity has an early start date-of the lOth and a late start date of the 19th. The activity also has a duration of 4 days. There are no nonworkdays. From the information given, ()what can be concluded about the activity?A.Total float for the activity is 9 days.B.The early finish date ofthe activity is the end ofthe day on the 14th.C.The late finish date is the 25th.D.The activity can be completed in 2 days ifthe resources devoted to it are doubled.
考题
Water is the __46___ of all the things we eat and drink . Not many people understand this but __47____ quite true . The human body can go without ___48___ for a long time . We’ve got many examples for this . Yet two __49___ three days without water can usually make people __50____ . Man can’t live __51____ water .Many people don’t understand how ___52__ water the human body needs __53___ work well , and many people , especially young people , do not drink enough , ___54__ in very hot weather . Our body has mostly water , about 65% to 75% . That is to say about two thirds of our body is water . When we do sports , some of the water will get away from our body . __55 _ we don’t drink some water , we won’t have enough water. And if we don’t have enough water , we’ll feel tired and many of us will get ill . So you know how important water is to us .46.___________( )46. A. importantB. most importantC. more importantD. different
考题
“ Can you finish writing a ( )composition today” the teacher asked anxiously.
A、two thousand-wordB、two-thousand-wordC、two-thousands-wordsD、two thousands words
考题
Two days are not enough for me to get ready for the conference.I need ________day.
A.otherB.the otherC.the thirdD.a third
考题
What agreement do the two speakers reach at the end of the conversation?A. The woman can take two days off. B. The woman needs to do some extra work.C. The woman should buy some travelling materials.
考题
It will be at least 10 days _______they finish cleaning up the typhoon-stricken village.A.until
B.before
C.since
D.when
考题
The frame needs to be strong enough to support the engine.A: structureB: bottomC: surfaceD: top
考题
You have borrowed a book from Professor Thomas and find that you can't give it back to him two days later as scheduled.Write him an email to ask whether you can keep the book for a few days more and make an apology.You should write about 100 words neatly on the ANSWER SHEET.Do not use your own name at the end of the email.Use"Ii Ming"instead.(10 points)
考题
It was clever__at the answer in two minutes.A.of him to arrive
B.for him to arrive
C.for his arriving
D.of his arriving
考题
Could you finish the task in two days? 一()I have something else to do these days.A、I could notB、Yes.I think soC、I'm afraid soD、I'm afraid not
考题
Two days is not enough for him to finish the work. He needs()day.A、otherB、the otherC、the thirdD、a third
考题
Two days is not enough for him to finish the work.He needs()day.A、otherB、the otherC、the thirdD、a third
考题
单选题— How soon will you be able to finish your homework?— ______.A
After two hoursB
Two hours laterC
In two hours
考题
单选题The vessel has stayed in port for seven days because she needs().A
repairsB
repairingC
repairedD
being repaired
考题
单选题Running Man, is a popular show these days. Some well-known stars challenge themselves to finish all kinds of tasks ______ in it.A
luckilyB
bravelyC
easilyD
differently
考题
单选题Two days is not enough for him to finish the work. He needs()day.A
otherB
the otherC
the thirdD
a third
考题
单选题An activity has an early start date-of the lOth and a late start date of the 19th. The activity also has a duration of 4 days. There are no nonworkdays. From the information given, ()what can be concluded about the activity?A
Total float for the activity is 9 days.B
The early finish date ofthe activity is the end ofthe day on the 14th.C
The late finish date is the 25th.D
The activity can be completed in 2 days ifthe resources devoted to it are doubled.