网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A recently ordered server came standard with one 3.0GHz processor. It is capable of handling fourtotal processors. Which of the following processor combinations can be used in this server?()
A
One, two, three or four processors
B
One, two, or three processors
C
One, three, or four processors
D
One, two or four processors
参考答案
参考解析
解析:
暂无解析
更多 “单选题A recently ordered server came standard with one 3.0GHz processor. It is capable of handling fourtotal processors. Which of the following processor combinations can be used in this server?()A One, two, three or four processorsB One, two, or three processorsC One, three, or four processorsD One, two or four processors” 相关考题
考题
The idea for the new project came to Jack ______ to his study recently.A. while devotingB. while devoting himselfC. while he was devotedD. while devoted
考题
What is the problem with the rug?
A. Ms. Janet Perez feels it is too small.
B. Ms. Janet Perez never ordered it.
C. Ms. Janet Perez feels she was undercharged for it.
D. Ms. Janet Perez ordered two but received one.
考题
A recently ordered server came standard with one 3.0GHz processor. It is capable of handling fourtotal processors. Which of the following processor combinations can be used in this server?()A、 One, two, three or four processorsB、 One, two, or three processorsC、 One, three, or four processorsD、 One, two or four processors
考题
After a technician came out and installed a new wireless router, one of the wired workstations began having problems connecting to the file server. This is only an intermittent problem. Which of the following actions will the technician MOST likely perform to resolve this problem?()A、Change the router's SSIDB、Move the router's locationC、Check user permissionsD、Check the cable ends
考题
A company would like to upgrade an old server to a multi-processor box. The server currently has asingle 3.0GHz 1Mb cache processor in it with a single empty socket. The only processor that is available from a manufacturer is a 3.0GHz 2Mb cache model. Which of the following is the BEST reason why this upgrade will not work?()A、 The socket size does not matchB、 The cache is from a different manufacturerC、 The processors do not matchD、 Processors cannot be upgraded after server has been deployed
考题
A file server is setup in a RAID 5 configuration.Recently there was a power failure in the server room while a user was transferring a document from one drive on the server to another drive on the same server.Unfortunately their UPS was in repair during this outage, and the file is now corrupt.Which of the following can be done to prevent this situation in the future?()A、Increase the memory on the server.B、Reconfigure drives to a RAID 0+1.C、Install a battery backed write cache module in the system.D、Instruct the user to save to the local system instead of to the server.
考题
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()A、A second IVE adapterB、A second processor cardC、PowerVM Enterprise EditionD、An additional cable-management arm
考题
Company.com is migrating from a third party managed disk subsystem to an IBM TotalStorage Enterprise Storage Server. Connection of the new storage server is complete, and it has been tested on all of the nodes in the three node HACMP cluster. How does the customer migrate to the new storage server with minimum down time?()A、 Shut down one node at a time and let the other node serve the applicationB、 Stop HACMP with the forced option and perform migration of the disks on one node,then restart HACMPC、 Stop both nodes and perform the migration all at once using standard AIX commands in parallel, then restart the clusterD、 Use C-SPOC to add the new disks to the cluster and migrate the information off the existing disks, then remove the old disks with C-SPOC
考题
Which WebLogic edition bundles JRockit Real Time?()A、WebLogic Server Standard EditionB、WebLogic Server Enterprise EditionC、WebLogic Server SuiteD、WebLogic Server Grid EditionE、WebLogic Server Cloud Edition
考题
Your network consists of an Active Directory forest that contains two domains. All servers run Windows Server 2008 R2. All domain controllers are configured as DNS servers. You have a standard primary zone for dev.contoso.com that is stored on a member server. You need to ensure that all domain controllers can resolve names from the dev.contoso.com zone. What should you do()A、On the member server, create a stub zone.B、On the member server, create a NS record for each domain controller.C、On one domain controller, create a conditional forwarder. Configure the conditional forwarder to replicate to all DNSD、On one domain controller, create conditionals forwarder. Configure the conditional forwarder to replicate to all DNS
考题
You need to design the consolidation plan for SQL1, SQL2, and SQL3. You need to identify the appropriate combination of SQL Server instances and SQL Server 2005 computers that are needed to fulfill the company’s consolidation plans and security requirements.Which combination should you use?()A、one SQL Server 2005 computer with one instanceB、two SQL Server 2005 computers, each with two instancesC、two SQL Server computers, one with one instance and one with three instancesD、one SQL Server 2005 computer with two instances
考题
You plan to deploy Exchange Server 2010 on a new server. The server will be a member of a database availability group. You need to identify the operating system that can be installed on the server to support Exchange Server 2010. Your solution must minimize costs. Which operating system should you identify()? A、Windows Server 2003 R2 Standard EditionB、Windows Server 2008 R2 Standard EditionC、Windows Server 2003 Service Pack 2 (SP2) Enterprise EditionD、Windows Server 2008 Service Pack 2 (SP2) Enterprise Edition
考题
You need to identify the combinations of the Windows operating system and SQL Server 2005 version that will be the most appropriate for the new RD configuration, which will include the Research, Parts, and Engineering databases.Which two combinations will be the most appropriate?()A、Windows Server 2003 Enterprise Edition with SQL Server 2005 Enterprise EditionB、Windows Server 2003 Datacenter Edition with SQL Server 2005 Enterprise EditionC、Windows Server 2003 Standard Edition with SQL Server 2005 Enterprise EditionD、Windows Server 2003 Enterprise Edition with SQL Server 2005 Standard Edition
考题
You are designing the placement of the global catalog servers. You want to use the minimum number of global catalog servers that are required. Which design should you use?()A、One global catalog server in New York.B、Two global catalog servers in New York.C、One global catalog server in Chicago and one global catalog server in New York.D、Two global catalog servers in Chicago and two global catalog servers in New York.E、One global catalog server in Chicago, one global catalog server in New York, and one global catalog server in Boston.
考题
You need to design a strategy for identifying the number of instances that any one SQL Server 2005 computer will support. What should you do?()A、Specify that each server must have one instance for each customer.B、Specify that each server must each have only one instance.C、Specify that each server must have one instance for each database that is hosted on that server.D、Specify that each server must have one instance for each customer who has one or more databases that are hosted on that server.
考题
单选题A customer recently purchased a new x3550 M3 server and one of the hard drives has failed. The customer has a standard warranty. They called you asking for a replacement. Which action should the customer take?()A
Contact the IBM FTSS to replace the driveB
Contact the IBM CSR or SSR to replace the driveC
Order a replacement driveD
Contact IBM Service
考题
单选题You plan to deploy a fault-tolerant virtual infrastructure based on Hyper-V. The virtual infrastructure will include a two-node Hyper-V host cluster that will contain eight virtual machines (VMs). All of the VMs will run Windows Server 2008 R2 Standard. If one of the nodes fails, the VMs must continue to run on the other node. You need to identify the minimum number and the type of licenses required for the planned deployment. What should you identify?()A
two Windows Server 2008 R2 Enterprise licenses and eight Windows Server 2008 R2 Standard licensesB
two Windows Server 2008 R2 Enterprise licenses and four Windows Server 2008 R2 Standard licensesC
four Windows Server 2008 R2 Enterprise licensesD
eight Windows Server 2008 R2 Standard licenses
考题
单选题A company would like to upgrade an old server to a multi-processor box. The server currently has asingle 3.0GHz 1Mb cache processor in it with a single empty socket. The only processor that is available from a manufacturer is a 3.0GHz 2Mb cache model. Which of the following is the BEST reason why this upgrade will not work?()A
The socket size does not matchB
The cache is from a different manufacturerC
The processors do not matchD
Processors cannot be upgraded after server has been deployed
考题
单选题You plan to deploy three Hyper-V servers named Server1 Server2, and Server3. Server1 will host three virtual machines (VMs), Server2 will host two VMs, and Server3 will host five VMs. All of the VMs will run Windows Server 2008 R2 Standard. You need to identify the minimum number and the type of licenses required for the planned deployment. The solution must minimize software costs. What should you identify?()A
Three Windows Server 2008 R2 Enterprise licenses and one Windows Server 2008 R2 Standard licenseB
Three Windows Server 2008 R2 Enterprise licensesC
Three Windows Server 2008 R2 Standard licensesD
Three Windows Server 2008 R2 Enterprise licenses and 10 Windows Server 2008 R2 Standard licenses
考题
单选题在SQL Server 数据库中,下面调用存储过程的语句错误的是()。A
EXEC proc_stu @sum OUTPUT,64,78B
EXEC proc_stu @sum OUTPUT,@total output,78C
EXEC proc_stu @sum OUTPUT,604D
EXEC Calculate @sum OUTPUT,@total output
考题
单选题Which WebLogic edition bundles JRockit Real Time?()A
WebLogic Server Standard EditionB
WebLogic Server Enterprise EditionC
WebLogic Server SuiteD
WebLogic Server Grid EditionE
WebLogic Server Cloud Edition
考题
单选题A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()A
A second IVE adapterB
A second processor cardC
PowerVM Enterprise EditionD
An additional cable-management arm
考题
单选题A customer wants to implement the Software Inventory capabilities of IBM Director in their environment of 50 servers, 500 laptops and 150 desktops.Which of the following would represent a minimum valid configuration to support this solution?()A
Windows 2000 server with 2GB free space, 2GB RAM and dual 1 GHz proc, using Access 2003B
Linux with 2.6 kernel and 2GB free space, 2GB RAM and dual 1 GHz proc, using MySQLC
Windows 2000 server with 2GB free space, 2GB RAM, dual 1 GHz proc with SMBIOS using MS Jet databaseD
Windows 2003 server with 2GB free space, 2GB RAM, dual 1 GHz proc with SMBIOS using MS SQL database
考题
单选题You are evaluating the deployment of a Hyper-V server that will host 10 VMs. Each VM will have the following configurations: - 8 GB of memory - Two virtual processors - One 200-gigabit fixed VHD - Two virtual network adapters You need to recommend changes to the standard server build to support the planned deployment. Which hardware components should be changed?()A
networkingB
processorC
memoryD
storage
热门标签
最新试卷